Traditional Culture Encyclopedia - Hotel reservation - Supporting information of Longsheng building

Supporting information of Longsheng building

Peripheral facilities: Longsheng Building is located in the core area of the development zone, close to the light rail station and bus terminal.

Banks: China Bank, China Construction Bank, Industrial and Commercial Bank, etc.

Hotels: Jinjiang Fuyuan

Hotel (4 stars), Shengkun Hotel, Yimeng Huadu Hotel, etc.

Catering: Yugong Yupo, Donglaishun, Shangdao Coffee, Yoshinoya, Subway, etc.

Medical: Tongrentang, Tongren Hospital.

Skyline: optical fiber cable

Air conditioning: central air conditioning

Parking space: 16 above ground and 19

Decoration standard:

1. External wall: high-grade glass curtain wall is the main part of the external wall, and the external window has the function of opening

2. Internal wall: wall surface and cylindrical surface are whitewashed

3. Floor:

4. air conditioning system: independent fresh air system, two-pipe fan coil units, fine decoration of air conditioning terminal in public area, standard terminal decoration (air conditioning bare top) in office area, with independent units. The fresh air per person per hour shall not be less than 3m3/person/hour (calculated by 15-2 building square meters per person)

5. Fire fighting smoke exhaust system: fire fighting terminal shall be completed according to fire fighting standards, including smoke sensation and spraying.

6. Lighting, strong and weak current systems: according to the original design drawings, the lighting branch lamp junction box, two-way 1 kV power supply emergency power supply system and 22V/38V low-voltage power supply system are completed, and the floor power distribution box is completed, with the designed power consumption load of 12 W/m2. The underground power distribution room has space for power expansion.

optical fiber enters the floor shaft, and sufficient capacity is reserved; Telephone lines enter the floor shaft, and sufficient space is reserved in the underground computer room for large operators such as Netcom and Telecom to place equipment. Sufficient routing space shall be reserved for power tube wells.

7. water supply system: municipal water introduction, reserved reclaimed water system and centralized supply of domestic hot water.

8. Elevator: original Mitsubishi, OTIS (or products of the same grade) elevator with fine interior decoration.

9. Public * * * area: The public * * * area adopts high-grade fine decoration.

1. Toilet: hardcover repair of advanced sanitary ware (TOTO or products of the same grade).