Traditional Culture Encyclopedia - Hotel reservation - Take off your hat and invest 7 1 10,000 in luxury middle schools in poor counties. Is the school's building standards qualified?

Take off your hat and invest 7 1 10,000 in luxury middle schools in poor counties. Is the school's building standards qualified?

? Every country attaches great importance to education, and as far as it is concerned, a newly-built middle school in Zhen 'an County, Shangluo City, Shaanxi Province has recently taken off its hat, which has aroused widespread concern. It is understood that this middle school started construction in 20 15 due to the lack of urban degrees. However, in 20 19, the income of local government in Zhen' an county was less than 200 million yuan, but the construction of this school cost nearly 710 million yuan. So single frequency makes people wonder why.

But this is not the whole school. The construction of this school is like a four-story fountain star hotel? Carp yue longmen? Water features, rockery waterfalls built by real mountains and other very luxurious facilities. Except for the stone railings that can be seen everywhere, every building has an imitation Tang-style roof. In the southwest corner, pavilions are built on the multi-level waterfalls with a length of about 50 meters and a drop of about 15 meters, surrounded by rockeries, waterwheels, plank roads, waterscapes and stone arch bridges.

? Generally speaking, school construction is too luxurious, which does not conform to the good style of traditional thrift in China. According to relevant personnel, the visual inspection of the leading office has exceeded 30 square meters, but according to the "Standards for the Construction of Office Buildings for Party and Government Organs", the area of county-level deputy offices of county-level organs shall not exceed 24 square meters. There are still some unreasonable places here. In terms of whether it meets the standards, some facilities meet the standards and some do not. According to what we say, no matter how poor you are, you can't be poor in education. Even so, we should give priority to practicality and insist on simplicity and honesty.

It is understood that the local government has indeed exceeded consumption in terms of construction expenditure. According to the person in charge, the preliminary expenses of land demolition, three links and one leveling, planning and design cost 90.8 million yuan. After that, Zhen 'an SDIC Company and the contractor invested 654.38 billion yuan to set up a project management company, and also raised 320 million yuan from the bank, constituting a total investment of 565.438 billion yuan in the project budget. However, according to actual changes, the current cost is 7 1 10,000 yuan. In addition to the estimated annual repayment of 53.37 million yuan to the bank 12 years, there is still about 200 million yuan in arrears.