Traditional Culture Encyclopedia - Hotel reservation - Planning of Liangping New District

Planning of Liangping New District

At the beginning of planning and design, Shuanggui New Town regards green ecology as the ultimate goal of new town construction, which embodies humanistic care everywhere. rely on

Thanks to the unique geographical and natural environment, Shuanggui New Town is planned as a central business district, Shuanggui tourist resort, industrial park and intercity railway logistics park, with an area of about 16 square kilometers. The central business district, which integrates administration, commerce, education, sports, medical care, residence and leisure, will be the political and cultural center of Liangping in the future. Among them, the administrative building is simple and restrained, highlighting the city's "beautiful and elegant living room"; Commercial buildings reflect the vitality of business opportunities and highlight the city's "dynamic supermarket"; Education, culture, health and architecture are both artistic, showing the "ever-changing furniture" of the city; The public service facilities are complete and perfect, and this beautiful city is "home improvement". Shuanggui Tourism Resort takes the landscape and countryside as the background and the Buddhist health culture as the connotation, and forms an ecologically livable new city with high-end residential areas, tourism vacations, business meetings, waterfront experience and sightseeing and leisure as the main body, which is an important growth pole to promote urban development. With huge leisure space, modern and fashionable architecture and ecological standard infrastructure, the new district will surely form the most powerful landmark landscape in Liangping. Shuanggui Avenue, which connects Chongqing to Wanzhou expressway, was widened and reconstructed at the beginning of the year, and it is a two-way six-lane road.

By the end of 20 1 1, the road skeleton of the new town will basically take shape.

Five roads with a total length of about 3.5 kilometers, such as Guidong Road, are under intense construction. About 450,000 cubic meters of earth and stone excavation and 654.38+10,000 cubic meters of backfill have been completed. The remaining 15 roads have been designed, budgeted and tendered. (August) Innovate the construction mode of gathering houses, adhere to the principle of "three unifications" and strictly control the "four customs" to create a new high-quality gathering paradise for relocated households. At present, the "Shuanggui Jiayuan" Huiju House with a construction area of about 50,000 square meters has been fully completed and needs to be delivered for use. The building area is 14 1 10,000 square meters, and 588 sets of 80,000 square meters "Shuanggui New Dwellings" have been started. We plan to build 250,000 square meters of houses in this county within three years, and 200,000 square meters will be completed this year.

Through attracting investment, real estate development companies such as Chongqing Xingmao Industrial Development (Group) Co., Ltd., Chongqing Hao Di Real Estate Development Co., Ltd., Chongqing New Town Development and Construction Co., Ltd. and Shanghai Chamber of Commerce were introduced to develop and build the new district, and the land was agreed to be transferred to 1 mu and 58 1 mu to build high-grade residential quarters, five-star hotels, modern style commercial streets and classical charm commercial streets with a total investment of 5 billion yuan. Liangping Sanjia Hospital (to be built)

(1) Overview of land use

1. The plot is located in Shuanggui New District, liangping county, Chongqing, covering an area of 150 mu. Located at the exit of expressway in Chongqing, it is connected with a main road and a secondary road respectively, with convenient transportation.

2. The base belongs to hilly landform, and the height difference fluctuates greatly. The highest altitude is 499.59 and the lowest altitude is 456.86.

3. The planning is controlled by the airport restricted elevation of 511m..

(2) Planning overview

1. This planning and design will build a comprehensive 3A hospital integrating medical treatment, teaching, scientific research, prevention and rehabilitation. Total construction area 120580 square meters, number of inpatient beds 1000, outpatient volume of 2000 people, land index of each bed of 99.9 square meters, construction area index of each bed of 120 square meters.