Traditional Culture Encyclopedia - Hotel reservation - Model essay on feasibility demonstration report
Model essay on feasibility demonstration report
Article 1: Feasibility report of public institutions
I. Reasons for project application
A unit is located in a city, a district, a place and a zoo. This venue is not only an environmental protection science popularization unit of the venue, but also a scientific research unit for biodiversity protection and species protection, and it is also an important window for the cooperation and academic exchange of environmental protection projects between the city and foreign countries.
An animal managed by a unit and an international exchange venue in a park (hereinafter referred to as the building) were designed by Tsinghua University Architectural Design Institute, with a building area of 5,400 ㎡. Design concept is a place for popular science education and academic exchange. A building was built in 1997 and has been used for 13 years. Successfully held more than 300 large and medium-sized conferences of a certain nature at home and abroad, and received nearly a thousand workers of a certain nature from all over the world, which provided an exchange platform for biodiversity conservation and species protection research and played an important role in the development of a certain nature. Especially in recent years, One Animal and One Animal has actively responded to the call of the Municipal Party Committee and Municipal Government, opened it to the public free of charge, and received more than 300,000 domestic and foreign tourists every year. With the deepening of the action plan of urban south city, the construction of a park with an animal and a park as the core will be launched, and a building will undertake a heavier task of cooperation and exchange.
However, since the completion of a stadium in China, self-raised funds have only been used for simple painting and the purchase of necessary equipment. Years of use and natural wear and tear have caused the roof of the building to leak, the outer wall skin to fall off and the indoor wall surface to be damaged in a large area; The ground is cracked and uneven; The fire-fighting facilities are simple and can't meet the requirements of the current regulations on fire-fighting facilities; Electrical pipeline aging; Heating, water supply and drainage facilities are seriously decayed, and dripping, leakage and leakage are serious; There is no air conditioning and refrigeration facilities in summer, and the windows are ventilated inside and outside in winter, so the thermal insulation performance is poor; There are no modern office facilities such as internet, communication and media. The supporting facilities of a building are backward, and the load of distribution room is difficult to meet the power demand after future transformation; After years of use, sewage treatment equipment is aging, accessories are hard to find, maintenance is difficult, sewage treatment tasks are increased, sewage treatment equipment performance is limited, and sewage treatment capacity can not meet the current needs; At present, a building uses coal-fired heating system, which is in disrepair for a long time, unsustainable and has serious environmental pollution problems. The use of the above building and its potential safety hazard have become a major obstacle to some kind of work in a venue.
With the further deepening of international cooperation in a venue, the in-depth development of a certain work and the improvement of openness to the public, the present situation of a building is difficult to meet the needs of the work. So one of my venues declared to rebuild a building.
Second, the project content
1, renovation of the main building of a building
1- 1, indoor and outdoor decoration of a building 1-2, installation of electrical equipment and modern office system 1-3, renewal of water supply and drainage and fire-fighting pipelines, installation of automatic sprinkler system, automatic alarm system 1-4, roof waterproofing redone1-.
2, building facilities renovation
2- 1, transformation of power distribution room and power distribution facilities system 2-2, transformation of sewage treatment system 2-3, transformation of boiler room and heating system
Chapter II: Demonstration Report of Security System Engineering Project
I. Basic information
1. Basic information of the project unit:
Company name: a company
Address and postal code: a city, a place, an animal, a park, a number.
Name of Legal Representative: Leader
A unit is a public institution of a certain nature directly subordinate to a superior unit. Located in a zoo in the southern suburbs of a city, managed by a unit, a research site for biodiversity conservation in a city and the nature of a zoo site in a city have been established, covering an area of nearly 1,000 mu, with more than 300 endangered species such as national first-class rare animals. Animal Park is not only an environmental protection science popularization unit with the nature of venues, but also a scientific research unit for biodiversity protection and species protection. It not only has the functions of protecting endangered wild animals and their habitats (wetland ecosystems), conducting biodiversity conservation research, and raising public awareness of nature conservation. It is also an important window for the city to carry out environmental protection project cooperation and academic exchanges with foreign countries. As a large outdoor venue in a city, the animal park enjoys a considerable reputation in a city and even the whole country, and tourists and primary and secondary school students come here in an endless stream.
2. Basic information of the project leader
3. Basic information of the project:
Project Name: A Building Renovation Project Type: Special Fund Project Attribute: New Project
4. Main work contents:
(1), interior and exterior decoration of the building
After thirteen years of use, the external wall of a building is seriously damaged, the indoor wall skin falls off in a large area, the doors and windows leak inside and outside, and the ground cracks in a large area. On the one hand, there are security risks in this situation, on the other hand, an animal and a venue, as a unit, undertake a large number of scientific research projects and undertake the reception tasks of scientific researchers all over the country and around the world. At present, it must be renovated to show the good image of a unit in the capital.
(2) Installation of electrical equipment and modern office system At present, GDD switchgear is used in the power distribution room of a building, and the power distribution facilities can only meet the basic requirements of lighting in the building. The collocation between switch cabinet, instrument cabinet and vertical cabinet is unreasonable. The wiring in the building is aging, the wire specification is small, the power consumption is serious, and there are many security risks, which causes great waste of energy. Information and digital office facilities are essential equipment for modern office systems. There is no modern office system such as internet and communication media in a building, which becomes an obstacle for a venue to carry out a certain kind of work.
(3), update the water supply and drainage and fire pipeline, install automatic sprinkler system and automatic alarm system.
At present, the drainage pipe inside a building is made of cast iron, which is corroded in many places and has serious dripping, leakage and leakage phenomena. As a public building, there is no automatic sprinkler system and automatic alarm system at present, which does not meet the national building fire protection regulations.
(4), redo the roof waterproof
The waterproof material of the existing roof of a building is SBS modified asphalt, which is made of two adhesives and three oils. After 13 years of use, it has already exceeded the service life of this waterproof, so there have been different degrees of water leakage, especially in recent years, some areas have been shut down.
(5) Update furniture and install refrigeration equipment.
Some existing office furniture in a building is purchased by a venue with self-raised funds. Due to the lack of funds in a venue, the furniture materials are sawdust plywood. On the one hand, it is not environmentally friendly, and formaldehyde smells very heavy. On the other hand, it is loose when it meets the tide and melts when it meets the water. All the furniture has been repaired more than twice, and most of it is rotten and unusable at this stage. There is no air conditioning and refrigeration equipment in the building. In the hot summer, the heat is unbearable, which not only can't receive guests who come to a certain park for an activity, but also has a great impact on the work efficiency of employees in a certain venue.
(6), power distribution room and power distribution facilities system transformation
With the smooth development of a certain work in the venue, the role of buildings is improving day by day, the infrastructure inside the venue is also gradually improving, and the overall electricity consumption of the venue is also gradually increasing. The current distribution room load is difficult to meet the electricity consumption of a venue, and the electricity consumption will increase greatly after the renovation of a building in the future. In the long run, the development of a stadium in China urgently needs to transform the power distribution room and power distribution facilities system.
(7), sewage treatment system transformation
With the continuous development of one of my stadiums in recent years, the number of tourists in one of my parks has increased greatly year by year. In the past three years, there has been an annual net increase of 654.38 million person-times, and the sewage discharge has also increased. The existing sewage treatment equipment has been overloaded, and the original design power can not meet the current demand. At present, the main components of sewage treatment equipment have been repaired many times. In recent years, due to the long service life and rapid upgrading of equipment, many parts of our sewage treatment equipment have been damaged and eliminated, and it is difficult to purchase matching parts in the market. The maintenance cost is increasing year by year, but the equipment operation is difficult. There are different degrees of damage and leakage in the drainage pipeline, so the sewage treatment system can not complete the sewage treatment task. The leaked sewage has done harm to the survival of animals. According to researchers' research in the ecological room of a stadium, many young animals died of diseases because of poor sewage treatment in the stadium.
(8), boiler room and heating system transformation
There are two boilers in the boiler room of a venue in China, with tonnage of 1 ton and 2 tons respectively, and the maximum heating area is 7500㎡. It has been used for ten years now. Old equipment, serious pipeline corrosion, poor radiator performance and increasing maintenance costs have failed to meet the national environmental protection and energy-saving indicators and the overall requirements of future park planning. The current heating area is far from the theoretical heating area. Because a stadium has gradually increased various facilities of a certain nature for many years, the heating area has actually increased by 7000㎡. The heating equipment of a building was installed earlier, and the current boiler heating equipment is far from reaching the heating standard of the lowest indoor temperature 18℃ in a city in winter.
5. Expected overall goal and stage goal:
The expected overall goal of this project is to actively respond to the suggestions of a municipal party committee and government on planning a park in a certain place? A humanistic, technological and green city? Slogan. Transform the building into a safe, energy-saving and environment-friendly building that spreads scientific spirit and carries out ecological science popularization education.
6, the main expected economic benefit or social benefit index:
This project is a public welfare project, aiming at saving energy and protecting the environment, planning a park in a certain place to promote the smooth development of a certain work and protect an endangered species such as an animal.
7. Total investment of the project:
The investment of this project is 26429438+07099 million yuan.
Second, the necessity and feasibility
1. Project background
(1) There are great security risks in a building, with outdated decoration and serious waste of energy, which has become an obstacle to some kind of work in a stadium.
(2) The construction of a park with an animal as the core in a certain place is going on as scheduled, and the transformation of a building should adapt to the municipal party committee and municipal government? A humanistic, technological and green city? The guiding spirit of.
2. Necessity of project implementation
Zoo is a natural place for biodiversity protection, especially animal protection, and also a national science and education base. Since the year of 20XX, the popularity of a stadium in China and even a city in the world has rapidly increased. When people come to a park for academic exchange, there are more and more staff of a certain nature. However, a building in a venue has not been maintained on a large scale since it was built and put into use 13 years ago, with outdated equipment and outdated decoration, which is difficult to meet the current use requirements.
3. Feasibility of project implementation
As a work unit of a certain nature, a stadium in China is familiar with the safety and reliability of new products and equipment in this industry, and can introduce advanced equipment and manage it scientifically.
Chapter III: Marketing Presentation Report
As a marketer, the first thing you need to know is the market changes, competition changes, future market changes, potential market relations, the composition of the real market, how to open the market, enter the market, develop your own market, change market relations and increase market share. Increase the market profit space of enterprises and companies.
With the continuous development of the technology market, technology products have become the mainstream of the market. Among them, mobile phone market is the most active. Not only the competition in the mobile phone market, but also the competition in the mobile phone operating system. Due to the need of communication, mobile phones have appeared and become popular. But this can't meet the market demand, which leads to the emergence of smart phones and becomes the mainstream today. The development of smart phone mainly depends on the development of mobile phone system. And this year, the mobile operating system market has really ignited. Whether it's Nokia Symbian system with user advantages, Apple's Ios system or Microsoft's Windows system, or Google's Android system, there are still some unpopular systems that are constantly developing and want to attract consumers through their respective advantages. New operating systems are also being developed, whether it's Bada from Samsung or Meego from Nokia. Every operating system manufacturer is actively striving for customers through various eye-catching ways, and strives to occupy a place in the mobile field. At present, the mainstream mobile operating systems are Apple, Android, Microsoft and Saipan.
I. Overview of the research
1 research purpose
potential market
Understand the potential changes in the market, predict the development trend according to the investigation and find the potential changes in the market.
Real market
As far as the mobile phone market is concerned, it was originally the competition in the mobile phone market, but it also led to the competition in the mobile phone operating system.
2 Research time
XXXX。 XX.XX-XXXX。 XX.XX
3 Basic overview
The mainstream operating system market is still occupied by old brand mobile phones. GARTNER Research recently released the global mobile phone sales report in the third quarter of 20XX, which shows that the global mobile phone sales in 20XX reached 4170,000 units, up 35% year-on-year, among which smartphones accounted for19.3% (80 million units), up 96% year-on-year. According to the report, IPONE and Android phones are the main reasons for the sharp increase in promotional activities this quarter, and in the third quarter, Android became the biggest winner. The market share soared from 3.5% last year to 25.5%, making it the second largest smartphone operating system in the world. The market share of Ios dropped from 17. 1% to 16.7%, and that of Saipan dropped from 44.6% to 36.6%, which was very obvious. Let's take a look at the emerging operating system: Windowsphone7 has just been released. Although there are still some imperfections in the operating system, the first impression left to customers is enough to buy more time for its upgrade. ? Blackberry? Blackberry is the largest smartphone in the US market. It can be said that the influence of BlackBerry in China is almost zero. Meego and Bada are more subtle. In 20XX, they may be willing but unable to do so, so they can only wait until next year to fight. Palms are almost hard to find.
Second, the survey summary
1 development
From the current point of view, the mainstream mobile phone operating system market can be said to be three-legged, and it can also be said that the four kings compete for hegemony, mainly Nokia, Google, Microsoft and unpopular systems. Because the unpopular system market was blocked, a three-legged situation was formed. The development of the system is mainly in three aspects, UI interface, software and hardware.
2 Market situation
I divide the mobile phone market into mainstream and non-mainstream operating systems, intelligent and non-intelligent, touch and non-touch. The mobile phone market situation is constantly changing, the domestic market situation is developing well, and foreign brand manufacturers are also trying to enter the China market. The competition in the mobile phone system market is fierce, and new operating systems are constantly emerging and developing rapidly. China's Tencent and Baidu both want a piece of this field. But whether it will enter this market depends on the development of the future situation.
3 Future situation
Every operating system vendor is trying to change its development situation. Just like Nokia, due to the uncertainty of the future situation, its market share has declined overall. Although new systems are being developed, there will be no new changes in a short time. If Apple, Google and Microsoft want to maintain and improve their market share in the future, they must constantly innovate, change and develop.
(The material of this article comes from the Internet. If there is any infringement, please contact to delete it. )
- Previous article:A modern poem praising Tengchong, Yunnan.
- Next article:How high is the temperature of the porridge for takeaway?
- Related articles
- Christmas lighting ceremony
- The hotel is noisy and I can't sleep.
- How can I get from hangzhou east railway station to Zhejiang Professional Police College on the second street of Xiasha Higher Education Park?
- The sentence "Happy Travel" is about the circle of friends.
- Wedding process
- Where is the address of Qinhuangdao blues hot spring town?
- What about the surrounding facilities of Tianjin Mingmen Shi Jia Community?
- Do you have the transliterated lyrics and Chinese lyrics of Kim Taewoo's "Only You"?
- How to use WeChat to find some video seeds on the Internet?
- Which one is good for eating and staying in Dandong Hot Spring Town?