Traditional Culture Encyclopedia - Hotel reservation - 5 templates of designer's work summary report

Model essay on designer's work summary report 1

Time flies, and 20 years have passed quickly. Looking back on September, 2000, I came to cloud

5 templates of designer's work summary report

Model essay on designer's work summary report 1

Time flies, and 20 years have passed quickly. Looking back on September, 2000, I came to cloud

5 templates of designer's work summary report

Model essay on designer's work summary report 1

Time flies, and 20 years have passed quickly. Looking back on September, 2000, I came to cloud mirror Garden Ancient Architecture Planning and Design Co., Ltd., and I couldn't help feeling deeply. In less than half a year, I entered another space suitable for my own development, where I had more professional contacts, less professional guidance and more opportunities for leaders and employees to get along.

Personally, I always hope to lead us to shine in the landscape design industry with a wise leader. I am a persistent person. I am strict with myself in my work and constantly experience myself in my life. I will try my best to enrich myself when I am still young and energetic. In recent months, I have felt the ambition and courage of the company leaders. I also feel that there will be a good development space and I am gradually full of confidence in this industry. In this industry, landscape architecture is a major to be developed, and I believe that the future landscape design will develop in full swing. I was confused at first and didn't know where to start. But under the leadership of leaders and colleagues, it gradually became clear. In fact, the cultivation of one's own design ability should be accumulation and learning in many aspects.

When I was making the planning drawings of Huanghua Street low-rent housing community, I probably didn't participate in the planning and design, but I was familiar with the software needed in the design and summarized some software in the process of completing the task.

Drawing skills, constantly speeding up the drawing speed, completed the work in time. At the same time, there are also some small flaws in the drawings, so be careful when making drawings, pay more attention to some particularly error-prone places, check more and think more.

When designing Zhengde Square and the entrance square of Volcano Address Park, we started with the design. At first, we felt we couldn't start. Is it really to look at some good design examples and draw our own scheme according to their drawings? I'm not exactly like that. I began to understand all kinds of environmental factors by studying the process of scheme design, and tried my best to integrate into the local customs to prepare for each design with a theme. However, the design is still lacking, the consideration is not very comprehensive, and the feasibility of the specific scheme is not enough. Finally, take the simple and generous route. In drawing, the early modeling and materials of 3D software are not very good, and the material collocation is not harmonious enough. The whole drawing is always bright and unstable under lighting rendering, and the color matching in post-processing is not very good. However, after making a few pictures, I made progress in my colleagues' mutual discussion. The final effect of the overall design and drawing is much better under the guidance of colleagues, and I have benefited a lot from the whole design and drawing process.

In a word, although I have only been in cloud mirror for four months, I am deeply attracted by Mr. Ji's care, mutual help among colleagues, relaxed and positive corporate atmosphere and good corporate culture. Even the chef in the restaurant looks so kind and lovely. In the future work, I will still be strict with myself, strive to improve my professional level, make good design works and contribute my light and heat to the company.

Model essay on designer's work summary report II

I am a novice who has just entered the society, and I have no confidence in my work, but I have no such feeling since I came to Jutailong. Everyone wants to be a family and can help each other in work and life, so it is very harmonious.

First of all, I would like to thank the company leaders and colleagues for their trust and support. With the guidance of company leaders and the help of colleagues, I have made some achievements in my work. The design industry is a purgatory of pain and happiness. Whenever faced with challenging drawing and design tasks, it is full of pressure and excitement. Collect all kinds of materials from the beginning (including art forms, color matching, design pictures of various styles, etc.). ), to the next stage of looking for design inspiration, meditation, anxiety, pain, suffering, and finally have a satisfactory idea, it will be easier. Every time a person's hard training results are affirmed by everyone, it is the greatest happiness in the work! Full of pleasure. 20-2008 is a year of self-adjustment for me.

As a graphic designer, calm down and think about it. I have been in Jutailong for less than half a year. Comprehensive evaluation of myself, I feel that I am still a little impetuous and confused. Design comes from life and is applied to life. Of course, first of all, we must have a strong sense of responsibility and dedication to work.

Because I love my job, I need to be proficient in the professional knowledge and business skills of this position, familiar with relevant industry norms, and pay attention to the development trend of the industry. Always maintain a strong sense of innovation.

Strictness and law augur a stable achievement. Stick to your post, take the initiative to devote yourself wholeheartedly to your work with great enthusiasm, ask yourself to work overtime without complaint, have a full understanding of your work and responsibilities, perform your post responsibilities, complete your work with high quality and efficiency, and make due contributions to the work of the department.

I look forward to the new working year and hope to make persistent efforts. At the same time, I also need to strengthen my design level and business ability, and communicate and discuss with my colleagues in my future work. Pay more attention to the work nature of other departments, further improve their professional knowledge and skills, actively absorb new ideas and design concepts, continue to do things in their own jobs, honestly, strive to make greater achievements and bring greater benefits to the company! It is planned to improve the performance to a new level next year. In the future work, we should maintain a good attitude, be not afraid of hardship and fatigue, work hard, pay more and complain less, and do our job well. There are also shortcomings in past work. Try to correct the shortcomings in the past, sum up the experience and absorb the essence, analyze the reasons for the failure and the shortcomings in the work, and prepare for next year's work!

The new year means a new starting point, new opportunities and new challenges! I will constantly sum up and reflect, constantly spur myself to enrich my energy and improve my drawing level, so as to adapt to the development of the times and enterprises, make progress with you and grow with the company. Strive to achieve self-breakthrough and reach a new level in 20-2008.

Model essay on summary report of designer's works 3

This year is my second year in the company. In the past two years, with the guidance and help of many predecessors, my professional level and working ability have made great progress in engineering practice. It is manifested in the following aspects:

First of all, these projects have been completed.

For example, the newly-built project of Dalian Siemens Sensor Factory, the office building renovation project of Shanghai Volkswagen Technology Center, the newly-built factory project of Changzhou Huasheng Tianlong Co., Ltd., and the large-scale logistics warehouse of Yangfei Warehouse, etc., I have participated in the bidding or commissioning stage of the scheme, and experienced the deliberation and comparison of the scheme design, the communication with the owner, the examination and approval of the preliminary design, the coordination of related disciplines, the rigorous construction drawing and the on-site cooperation in the construction stage, and have a deep understanding of the process of architectural design and construction. Architectural design is not an armchair strategist, but a coherent production work that requires collective participation. To complete a good work, it is necessary to coordinate the relationship between design and other disciplines, as well as economic, social and interpersonal factors. Due to the influence of various external factors, the framework will inevitably undergo rounds of revision and improvement from the conception to the implementation of the scheme. After these relatively complete engineering practices, I have learned and learned how to grasp the quality of architecture to a certain extent in the realistic framework, which requires the accumulation of professional knowledge and patient and meticulous cooperation, and this is exactly where an architect puts his energy into the most concentrated place.

Second, these projects have certain complexity.

When I came to the Institute of Mechanical and Electrical Engineering, I first entered the comprehensive office of Pudong Branch, mainly engaged in industrial architectural design. Industrial architecture has become a kind of architectural design type with high design requirements because of its particularity, professionalism and strictness in use function and nature. The design of industrial buildings should pay attention to several aspects:

1. The main process of production technology and the situation around the base;

2. Handle all kinds of streamline relationships, including people flow route and goods flow route;

3. Novel and modern facade design; Grasp the sense of space and humanization;

4. Cost economic factors.

The engineering practice of industrial buildings is very helpful for me to engage in other types of architectural design in the future. It allows me to develop the habit of analysis and logical thinking in the design process, let me dig out the design elements from the more essential needs of architecture, and let me know that architectural design should fully reflect the understanding and care for users.

In terms of professional ability, after three years of practice and tempering, I have grown from a young student who just walked out of the ivory tower to a professional architect with professional quality. Architecture major is a leading major, and architectural design affects the work of all related majors. Therefore, architects should have good coordination ability, organization ability and control ability, and these abilities should be based on profound professional skills.

After entering the design institute, under the leadership of my predecessors, I participated in the design of the new project of Dalian Siemens Sensor Factory, the new project of Yantai Zhonghui and the renovation of Shanghai Mint, which have been completed and put into use. Then he worked as the chief designer in the new workshop project of Changzhou Huasheng Tianlong Co., Ltd., and has been coordinating and organizing the work with the master from the scheme stage to the completion. Being recognized and praised by the owners is another new height of my career. From 20 to 2000, faced with the difficulties of many tasks and few architectural professionals, I led other young colleagues of our design team to work overtime, not afraid of hardship, and made plans in advance to lay a good foundation for the future construction drawing stage.

Three years of practical work has also cultivated my rigorous, hard-working and fearless professionalism and sense of responsibility. The work style of the design institute has also cultivated my good service spirit and teamwork spirit, which are indispensable qualities to become a qualified professional architect. Theoretically, in my spare time, I read some books on architecture and other related majors to guide and reflect on practical work. Architecture is the spatial language of social life forms. It reflects the social form, lifestyle, social aesthetic orientation and world outlook of the times.

These contents need corresponding professional criticism, and make necessary judgments and analysis on the building level, building level, product quality, environmental effect, professional ethics cultivation, social guidance, etc., and at the same time achieve the purpose of building and upgrading architectural theory. Therefore, architectural theory must interact with architectural practice to have real value. The above work experience is a good start of my career, and I will work harder and make continuous progress in the future. I conclude with an eternal farewell song: "The road is long, but it's Xiu Yuan, and I will go up and down to seek Xiu Yuan".

Model essay on designer's work summary report 4

First, understanding and learning in the internship stage.

For newly graduated college students, engaging in design work is both an opportunity and a challenge. I am fortunate to be a member of the architectural design institute of the group. A few months ago, I adapted to the working environment as soon as possible and integrated into the design institute. With the care, support and help of leaders and colleagues, I will seriously study the knowledge of steel structure design, constantly improve my professional level and accumulate experience. During this period, I mainly studied the Technical Specification for Steel Structure of Light-duty Houses with Portal Frames, the Manual for Steel Structure Design, the Code for Architectural Design and the Code for Structural Design. Personality is the concept of steel structure design, which has risen from a preliminary understanding to a higher level. In recent months, I have learned to improve the engineering quantity, quote the engineering quantity and design the gantry. By doing these works, I gradually improved my understanding of the design of light steel structure houses, and the connection and design of various components were more comprehensive, economical and reasonable. During this period, I exercised my patience by handling qualification upgrading documents and sorting out simple materials, and realized the importance of being serious, responsible and careful in doing any work, handling the relationship between colleagues and contacting all departments of the group. Through continuous study and practice, I will gradually improve my professional skills by applying the theoretical knowledge I have learned, understand the core of design work, respond with heart, advocate the corporate reputation spirit of "one family with one heart and one effort", and make more contributions to the development of design institutes in line with the corporate slogan of "advocating perfection, pursuing Excellence and sparing no effort" of the group.

Two, strengthen their own learning, improve the level of professional knowledge

Through the internship in recent months, I realize that my knowledge, potential and experience are still lacking, and I can't take it lightly in my work and study. I should participate more, keep learning, learn from books, learn from leaders around me, learn from colleagues, and make myself feel that I have made necessary progress. Through continuous study and accumulation, I have gained the necessary design work experience, can treat all work tasks with a correct attitude, love my work, and strive to implement it in practical work. Seriously improve their professional quality, strive for the initiative in work, have a strong sense of professionalism and responsibility, and strive to improve work efficiency and quality.

Three. Existing problems and future efforts

Over the past few months, I have been able to devote myself to my work, and I am not afraid of hardship. I have made some achievements, but there are also some problems and shortcomings, mainly as follows:

First, I just stepped into the society and started working. I have no experience. My character is that design work is hard work. I should study and practice while working. I want to think more, read the drawings carefully, understand and be familiar with the design specifications.

Second, sometimes work is lazy and not serious enough, and work efficiency needs to be improved;

Third, my theoretical level, professional knowledge and work experience are still lacking, so I should study and practice harder.

In my future work and study, I am determined to seriously improve my professional knowledge and strengthen my sense of responsibility, and contribute to the rapid development of design institutes and the leap-forward development of the company's economy. I think I should try to do:

First, strengthen study and broaden knowledge. Study hard on professional knowledge and related experience, and consult experienced people such as leaders and colleagues. Strengthen the understanding of the development context and trend of steel structure design, strengthen the understanding and study of the surrounding environment and the development of the same industry, and know your own advantages and disadvantages;

Second, in line with the principle of seeking truth from facts, do your work with your heart and don't delay;

Third, abide by the company's internal rules and regulations, safeguard the company's interests, create higher value for the company with heart, and strive to achieve greater work results.

In line with the corporate slogan of "advocating perfection, pursuing Excellence, striving for perfection and sparing no effort" of Wan Sida Group, we adhere to and advocate the corporate reputation spirit of "one family, one mind and one mind", and live up to the care and help of company leaders, the strong support and help of colleagues, strengthen study and make more contributions to the development of the Group. I wish the group a better tomorrow, and the design institute will grow with the development of the group!

I worked as an intern in Nanjing Design Institute for one and a half months in the summer vacation. This is a good opportunity for me to get close to, understand and be familiar with architectural design, and let me understand the problems that I can't understand in my usual study and correct some wrong views. Let me further understand the difference between theory and practice. Through consulting the experts of the unit, we can understand the generation principle of a series of common building diseases that are easy to exist and occur in design and construction, as well as the corresponding detection and treatment measures. Through the internship, I carried out theory and practice in the four-month internship. ............ passed quickly, and I came in a hurry and left in a hurry. It seems that people in our industry are naturally busy. In the past, at school, every day passed in a hurry, and it was common to go to bed at one or two in the evening. I never thought that today's internship would end in a hurry. It seems really sad. Although the time is short, the harvest is really not small. When I was in school, I never knew how to start with the opposite design, but during my internship, the careful teaching of designers and the help of my colleagues greatly improved my facade design thinking and gained a new understanding of architectural design. I believe we will gain more in the future design.

Looking back on my life these months, I really learned a lot, not only how to design, but also how to be a man. The days of internship are really hard. In the past, at school, I dominated my time. Sometimes when I am bored, I can watch movies and go shopping. At the moment, it seems that time dominates me, and the total time is not enough. I go to work early every day just to leave a good impression on my colleagues. When I have nothing to do at night, I go to the office to look at the information and surf the Internet occasionally. I also gained a lot in such a day of going out early and returning late.

I remember that the first project I contacted was a comprehensive building in Youlian Real Estate. Because it is a high-rise building, the problems to be considered are more complicated, and I have little contact with it at school. I felt very confused at that time and didn't know how to start. Then I looked for information myself, read a book and gave the designer a sketch. Under the guidance of the designer, my first plan was completely settled, including all plane functions and underground garage. Finally, when Party A came back from abroad, I was glad to see the plan. I never thought about it. However, Party A said that the apartment type of commercial and residential buildings we are doing is expected to be a single apartment type, while what we are doing is a general apartment type. In this way, the column network will change, the commercial layout will also change, and the underground garage will also change. In other words, all the work I did a month ago was in vain. But then I thought about it. I practiced, focusing on learning, and learning new things is the most important thing. The next morning, I went to the office early, continued to read the information, and prepared new ideas for this plan.

During the few days of internship, I also did odd jobs, helping them change their small apartments and make writing materials. Although this is a small task, I dare not neglect it. I understand that a little thing can best reflect the essence of human beings. I'm here not only to learn things, but also to get in touch with society better and learn how to be a better and more decent person. A few days later, the leader asked me how to do the facade design, and I began to be confused at that time, because I actually had a bottom when I was doing the plane at school, and I never thought that the plane and the facade were actually designed separately. Although I didn't understand it, I agreed. At that time, I was really embarrassed to ask my colleagues, so I crustily skin of head and asked the chief designer directly. I felt that being scolded by a qualified architect was better than being looked down upon by my colleagues who had just worked. I said all my doubts, and I was ready to be scolded. I didn't master the design at school, but the fact really surprised me. The designer didn't deny me anything, but patiently told me, "The actual projects and procedures done by the design institute are of course very different from those of the school. For projects like the school, the design institute won't give you half a year, which requires everyone to work together." We always make the plane first, then design the elevation, then adjust the plane according to the elevation effect, and finally debug it according to the effect diagram as a whole. "The designer said so. I suddenly realized that I really didn't fully realize the importance of team spirit. With this feeling, I suddenly got excited again and felt that I had grown up.

I went in, haha. In the next few days, when I was designing the kindergarten facade, I chatted with my colleagues who had worked for a year for the first time. I want to show my design with my own thinking, but I must also respect the original designer's intention. With our cooperation, the first kindergarten facade idea appeared, and I was beaten as a result. The designer said that the overall feeling is not strong, and my colleagues said that I really just came out of school. I know what this means. However, in order not to affect my mood, but also to cope with the later work with a good attitude, I once again collected information, consulted my colleagues attentively, and occasionally went to the designer to ask some questions that might seem naive to him, but in order to know more, I completely forgot my face problem. It's really worth it. My design results have been recognized not only by the architect, but also by Party A. It was only after the incident that I realized that the facade design was really not as simple as I imagined, and the team spirit was not as simple as cooperation. Let's just say that you can adjust the plane when we design the facade. Sometimes people's CAD planes may have different axis lines and wall lines. What you may do is redraw this picture, instead of simply modifying it and drawing more pictures. It's just a skill in CAD. Perhaps this is also an aspect of team spirit.

Model essay on summary report of designer's works 5

At the beginning of July, I was fortunate to be a member of Hua Mu, working as a designer in the design department, mainly responsible for the technical work related to doors and windows. The specific work is as follows: 1. Design of door and window engineering scheme; 2. Bills of lading and orders for door and window profiles, hardware, accessories and glass; 3. Make and distribute door and window processing sheets; 4. Drawing of as-built drawings of doors and windows; 5. Other related technical work.

Since I joined the company, I have mainly participated in the following projects:

1. Shunde Phase IV high-rise building:

The fourth phase of high-rise buildings mainly completed the acceptance of the list of processing technology for rear windows and low-window guardrails in L7# and G9# buildings in the later period. The processing capacity of rear windows was 697.76m2, and the low-window guardrails were1520.96m2..

2. Shunde Phase IV Villa:

Phase IV villa B 1-B 1 1, with a total of1/building, of which B 1 and B2 have a total engineering quantity of 1078.42m2, which is for door and window processing.

B3,B4, 1565m2,B5-B7, 14 10.6 1m2,B8-B 10, 1499. 1 1m2 0m2。 B11/the total amount of work for processing windows and doors of the fourth phase villa in Shunde is 9 1 1.56m2, and the total amount of work for processing louvers is 754.03. All the above frames, fans and glass have been put in place. The total engineering quantity for processing the louver grille of Shunde Phase IV villa is 72 18.73m2, which is 100% complete. (The work related to door and window technology in the later period of villa has been assigned to Abel Tamata).

3. Shunde Yunxi clause:

We are involved in buildings 1#, 2#, 9#, 10#,1#, 12# and 13#, with a total of 7 buildings, of which/kloc-

1# building's doors and windows need to be processed in a total amount of 4308.36m2, and the completed frame works amount of 2704.78m2, accounting for 66.9% of the total works amount of 1# building's doors and windows, and the completed frame fan works amount of 1980.5m2, accounting for 46% and 65438+ of the total works amount.

The total quantity of doors and windows in Building 2 is 4402.64m2, and the completed frame quantity is 2736.88m2, accounting for 62% of the total quantity of doors and windows in Building 2. Frame sash has been completed 185 1.4m2, accounting for 42% of the total works of doors and windows of 1# building, and the total glass area of Building 2 is 2828.46m2.

The total quantities of doors and windows to be processed in Building 9 are 6 104.2m2, and the quantities of finished boxes are 2697.9m2, accounting for 44.2% of the total quantities of doors and windows in Building 9. There is no order for fans, and the total glass area of Building 9 needs 3787m2.

10# building's doors and windows need to be processed with a total quantity of 6002m2, and the frame quantity is 2476.45m2, accounting for 4 1.3% of the total quantity of doors and windows in 10# building. The fan has not been placed, and the total glass area of 10# building is 3724.8㎡, which has not been placed.

1 1# building doors and windows need to be processed with a total amount of 2260.28m2, and 972.26m2 of frame works have been completed, accounting for 43% of the total amount1.82m2 and 18.

12 building, the total quantity of doors and windows to be processed is 2260.28m2, the completed frame quantity is 1000.88m2, accounting for 44.3% of the total quantity of doors and windows in 12 building, and the completed frame and fan quantity is1.82m2.

The total engineering quantity of doors and windows in the group building is 1009. 15m2, the completed frame engineering quantity is 438.33m2, accounting for 43.4% of the total engineering quantity of doors and windows in the group building, and the completed frame fan engineering quantity is 167.36m2, accounting for 16.6% of the total engineering quantity of doors and windows in the group building.

From this summary, the total engineering quantity of doors and windows to be processed in Yunxi Branch is 26346.9 1m2, the completed frame engineering quantity is 13203.58m2, accounting for 50. 1% of the total engineering quantity of doors and windows in Yunxi Branch, and the frame fans are all 4022.9m2, accounting for 15.3% of the total engineering quantity.

1.Xi An Overseas Chinese Town Swan Castle Phase IV:

The fourth phase of Swan Castle mainly completed the window processing order, glass order and silver anchor bid section of Building 9.

2.Xi Overseas Chinese Town Phase V Swan Castle South Tower:

In the fifth stage, the South Tower mainly completed the ordering of the installed window fixing glass and louver grille processing sheet. At present, the South Tower still has doors and windows that have been reported for construction.

3.Xi OCT Phase V Swan Castle East Tower:

The fifth phase of the East Tower is mainly to determine the scheme. After several rounds of communication with Party A,

At present, the general direction of the scheme has been determined, the scheme drawings have been completed, and some nodes need to be further optimized.

The above is the specific situation of participating in the project this year, and it is expected that its data can provide some reference for other relevant departments of the company, and the departments will supervise each other to check and fill the gaps, so as to promote the further development of the follow-up work of related projects.

From 20 to 2000, I hope that through my own efforts and everyone's help, I will transform from a simple door and window designer to a door and window curtain wall designer, and from a simple designer to a comprehensive manager. Under the leadership of general manager Li, I will work with you to build a bigger platform for this national brand and create new achievements.

Five related articles in the designer's work summary report:

★ There are 5 model articles in the design work summary report.

★ The designer summed up five excellent essays in his year-end personal work.

★ 5 samples of designer's personal debriefing report

★ 5 latest summaries of the designer's annual work.

★ Summarize 5 essays of designer's internship.

★ There are 5 essays in the latest designer's annual work summary.

★ Designer's personal year-end summary model essay 5.

★ 20 19 5 essays on the annual work summary of graphic designers.

★ Designer's annual work summary report (five articles)

★ The designer's personal works summarize five short articles at the end of the year