How to write the contract plan for contracting the kitchen?
ID number: Address:
Phone: Mobile phone number:
Contractor (hereinafter referred to as Party B):
ID number: Address:
Phone: Mobile phone number:
According to the Contract Law of People's Republic of China (PRC) and other relevant laws and regulations, combined with the characteristics of family room decoration in Chongqing, on the basis of equality, voluntariness and consensus, Party A and Party B reach the following agreement on matters related to Party B's contracting of Party A's family room decoration project (hereinafter referred to as the project):
I. Overview of the Project
1, project location:
2, engineering decoration construction area:
3. Project Type:
4. Project contracting: Party B contracts projects and materials.
5. Project duration
Commencement date: Completion date:
6. Contract price:
The project cost of this contract is (RMB: RMB only).
Two. Party A's work
1. Three days before commencement, on the principle of not affecting the construction, create conditions for Party B to enter the site for construction.
2. Free water supply and power supply during construction.
3, responsible for coordinating the relationship between the site construction team and the neighborhood.
4. Participate in the supervision of project quality and construction progress, and participate in engineering materials, concealed works and completion acceptance.
Three. Party B's work
1. During the construction, the safety construction operation specifications, fire prevention regulations, construction specifications and quality standards shall be strictly implemented, and the contract project shall be completed on time with good quality and quantity.
2. Do not disturb the people and pollute the environment. It is not allowed to engage in renovation activities such as knocking, chiseling, cutting and drilling that generate noise between 2 1 hour and 7: 00 the next day.
3. Party B shall be responsible for the maintenance and compensation for the losses caused by pipeline blockage, water leakage, water cut-off and power failure of adjacent residents' houses due to decoration construction.
4, responsible for the protection of finished products, equipment and living room furniture.
5. Ensure that the water pipes in the living room are unblocked and the bathroom is clean. After daily completion, clean up the construction site and transport the garbage to the designated place of the property, and the corresponding slag discharge fee shall be paid by Party B. ..
6. Party B must guarantee the construction quality. If there are any construction quality problems, Party B shall correct them in time. If quality problems are found in the completion acceptance, Party B shall immediately correct them, and Party A has the right to refuse to pay labor costs before Party A's rectification requirements are met.
7, construction personnel should be civilized construction, barbaric construction is prohibited. Party A has the right to request the replacement of the construction personnel with poor performance, and the contractor shall not delay.
8. Party B shall strengthen the safety education on fire prevention and theft prevention for on-site construction personnel. Construction personnel are not allowed to violate the law and discipline at the construction site, and the consequences will be at their own risk if problems arise. All civil and criminal liabilities incurred by Party B's construction personnel during the construction and warranty period shall be borne by Party B. ..
Fourth, buy materials.
When purchasing materials, Party B shall purchase according to the brand designated by Party A, otherwise Party A has the right to request replacement. The brands of materials designated by Party A include: Fest water pipes, pigeon brand wires, German and Italian pipe fittings, weak wires (net wires and closed lines) in Qiuyeyuan, macro paint putty glue, Raul waterproof coating, etc. Other materials without designated brands should meet the requirements of environmental protection and have quality assurance.
Squat toilet can't buy three no products, the glaze is smooth, easy to scrub, with submerged bend, which can prevent odor.
Faucets and shower taps should be made of stainless steel.
The lamp is a ceiling lamp and the bulb is an energy-saving lamp.
Verb (abbreviation for verb) time delay
1. If the completion date is delayed due to the following reasons, the construction period may be postponed after confirmation by Party A:
Changes in engineering quantity; Force majeure; Other circumstances in which Party A agrees to postpone the construction period.
2. If the project cannot be completed on schedule due to Party B's responsibility, the construction period will not be postponed; The rework cost of the project quality problems caused by Party B shall be borne by Party B, and the construction period shall not be postponed.
3. If the construction period is delayed due to Party B's reasons, Party A shall be compensated for the loss by 3‰ of the total project cost for each day of delay.
Six, project acceptance and warranty
1, in the process of construction, the joint acceptance of project quality is divided into the following stages:
(1) Material acceptance;
(2) Acceptance of concealed works;
(3) Completion acceptance.
2. After the project is completed, Party B shall notify Party A for acceptance.
3. Before the completion acceptance by both parties, Party B shall be responsible for protecting the safety of finished products and the project site.
4. The warranty period of interior decoration works under normal use conditions is one year from the date when both parties sign the project completion acceptance. During the warranty period, if it is found that there is serious deformation or affects the overall appearance after repair, Party B shall bear the responsibility for replacement.
Seven, the project payment method
After the Contract comes into effect, Party A shall pay the project payment to Party B according to the following table:
Table 1 proportion and amount of project payment
Number of payments
time of payment
% of the total amount
Payment amount
first time
Material approach, pipeline layout.
Thirty percent
second time
Mid-term renovation
Thirty percent
the third time
Qualified completion acceptance
Thirty percent
the fourth time
Three months after the completion acceptance.
10%
Eight. responsibility for breach of contract
1. If one party fails to perform its contractual obligations as agreed, causing losses to the other party, it shall be liable for compensation; If you are punished for violating relevant laws and regulations, the ultimate responsibility shall be borne by the responsible party.
2. If one party cannot continue to perform the contract, it shall notify the other party in time, and the responsible party shall bear the losses caused by the termination of the contract.
3. If Party A fails to pay the third and fourth projects within the time limit agreed in the contract without justifiable reasons, it shall pay Party B a penalty of 2‰ of the contract price for each day overdue.
4. If the engineering quality and indoor air quality are unqualified due to Party B's responsibility, Party B shall rework, repair, comprehensively treat and compensate according to the following agreements:
(1) Party B must rework and repair all the unqualified parts of the project. The delayed payment of the project caused by rework shall be regarded as the project delay, and Party B shall pay Party A a penalty of 2‰ of the project cost of this contract for each day of delay.
(2) If the indoor air quality is unqualified, Party B must comprehensively treat it. Delayed delivery of the project due to governance reasons shall be regarded as project delay. For each day of delay, Party B shall pay Party A a penalty of 2‰ of the contract project cost.
(3) If the indoor air quality is still not up to standard after treatment, Party B shall return the full price of the project contracted by Party A. ..
Nine. Dispute resolution method
Disputes arising under this contract shall be settled by both parties through consultation or applied for mediation by consumers' association. If negotiation or mediation fails, it shall bring a lawsuit to the people's court where the project is located and request the people's court to make a ruling.
X. Labor force management
1. Without Party A's permission, off-site construction personnel shall not spend the night at the site.
2. Party B shall apply for community access certificates and pay relevant fees.
3. Without the consent of Party A, Party B shall not stop work or go slow under any circumstances.
XI。 Construction machinery and tools
1. Party B shall bring its own tools needed for construction, and ensure the safety and good usability of the tools, and the maintenance expenses of the tools shall be borne by Party B..
2. Consumables (such as drill bits and saw blades) generated by the tools shall be borne by Party B. ..
Twelve. Decoration requirements
First, the decoration requirements
Circuit (strong current, weak current): surface mount, network and TV enter every room.
Waterway: hidden.
Wall treatment:
1, cracks must be pasted;
2, three times putty, a primer, two coatings.
3. Every time you paint the wall, you need the householder's acceptance.
firebrick
1, original grass-roots management.
2, cement sand interface agent paste. Tiles touch corners while grinding.
3, the lines are flat and even, all the angles of Yin and Yang should be square, the brick joints should be small, and the floor tile hollowing rate should be less than 5%, otherwise it must be reworked.
Waterproofing: the kitchen and bathroom shall be painted with waterproof paint twice, and the waterproof paint on the bathroom wall shall be painted at a height of1.8m. Only after water storage is checked correctly can the next process be started.
B, decoration content
1. Living room: The whole living room is divided into two cabins, each with doors and windows. The doors and windows of the back room are on the corridor wall, and the doors and windows of the outhouse are facing the balcony. Floor tiles, walls and top surfaces shall be painted. Install lighting, lamps (including lamps), network cable and TV socket, curtain rod and skirting board.
2. Master bedroom: tile, wall and flour brush. Lighting, lamps (including lamps), network cable and TV socket, curtain rod and baseboard.
3. Second bedroom: floor tile, wall surface and top flour brush. Lighting, lamps (including lamps), network cable and TV socket, curtain rod and baseboard.
4. Kitchen life balcony: floor tile, wall surface and top surface painting, lighting, lamps (including lamps), stoves and lockers made of cement and ceramic tiles.
5. Toilet: floor tile, wall surface and top surface are painted, lighting, lamps (including lamps), sanitary ware installation and exhaust fan installation. Floor drain installation, water supply and drainage pipeline embedded.
6. Aisle: 1 high pressure box, 1 low pressure box. The living room corridor 1.2m wide, and the distance from the balcony sliding door 1m, with double-control lighting and lamps (including lamps).
7. Balcony: paint the wall and top surface, make the ground waterproof, and install lamps (including lamps) and clothes drying rods.
Thirteen. Other agreed matters.
1. In the project, if Party A does not intend to increase the project, or if the design calculation is wrong or intentionally omitted, the project payment will not be increased.
2. During the construction period, if Party A thinks that Party B's construction personnel are not qualified for the renovation work due to technical level, work attitude, personality and other reasons, Party A has the right to ask Party B to replace the construction personnel.
3. During the warranty period, if Party A informs the construction party that it needs maintenance, the construction party must arrive at the site within 24 hours. If Party A fails to propose a solution within 48 hours after applying for repair due to the quality problem of materials provided by Party B, Party A can solve it by itself, and all expenses incurred by Party A shall be borne by Party B. During the warranty period, if water, electricity, gas and other accidents endanger personal safety or other property safety due to engineering quality problems, Party A can deal with them first, and Party B will pay all reasonable expenses incurred by Party A afterwards. During the warranty period, if it is found that there is serious deformation or affects the overall appearance after repair, Party B shall bear the responsibility for replacement.
Fourteen supplementary terms
1. This contract is made in duplicate and shall come into effect after being signed by both parties.
2. After this contract is signed, the project shall not be subcontracted.
3. Both parties can modify or supplement this contract in written form. However, if the modification or supplement unreasonably relieves or exempts Party B from the responsibilities stipulated in this contract, this contract shall still prevail.
4. If the performance of the contract is affected or losses are caused due to reasons not attributable to both parties, both parties shall settle the matter through consultation based on the principle of fairness.
5. This contract will be automatically terminated after the performance.
Fifteen. additional clause
Party A: Party B:
Date of signing: Date of signing:
- Related articles
- What is the eighth floor of Shishi Tiandu Hotel for?
- Huludao lianshan district travel guide
- Does Lanzhou New District Vocational Education Park develop into a golden business city?
- Where is good morning tea in Shunde, Foshan? -Recommended
- Where is the Shanghai Jade Market? Where is the Shanghai Jade Market?
- Is Butch Hotel a chain hotel?
- What are the facilities around David Jiayuan Community in Weihai?
- What do the police need to collect hotel surveillance?
- Nan Shan Hot Springs An Introduction to Business Hours Nan Shan Hot Springs
- How about Wenzhou Amethyst Hotel Co., Ltd.?