Traditional Culture Encyclopedia - Hotel reservation - All-inclusive decoration company ranking house all-inclusive renovation contract model
All-inclusive decoration company ranking house all-inclusive renovation contract model
First, the ranking of all-inclusive decoration companies
1, Dongyirisheng decoration
Dongyi Risheng Home Decoration Group Co., Ltd., founded in 1997, is one of the top ten brands in China, a well-known brand in the field of home decoration in China, and a listed company specializing in providing "organic whole residential decoration" solutions for the elite in China. Form a unique development mode of the whole industrial chain covering residential decoration design, construction, main materials and self-operated wood products supporting system, and grow into a leading enterprise in China residential decoration industry!
2. Longfa Decorates Longfa
Established in 1997, Beijing longfa architectural decoration engineering co., ltd is a home integration service provider and one of the first AAA-level enterprises in China construction industry. Its business scope includes decoration, commercial trade, household products production, logistics distribution and other industrial modules, and has maintained a rapid and stable development trend for many years.
3. Xingyi Decoration
Guangdong Xingyi Decoration Group Co., Ltd., founded in 199 1, a trademark of Guangdong Province, specializes in the decoration of hotels, shopping malls, office buildings and other residential buildings and the design and construction of public spaces. It is a large-scale professional decoration group company focusing on the design and construction of indoor and outdoor decoration engineering, integrating landscape, soft decoration and furniture manufacturing, building decoration materials, craft ornaments, cultural media and art education.
Second, the housing all-inclusive renovation contract model
Customer (Party A):
Organizer (Party B):
Project: According to People's Republic of China (PRC) Contract Law, People's Republic of China (PRC) Consumer Rights Protection Law, People's Republic of China (PRC) Price Law, Trial Measures of the Ministry of Construction for the Decoration Management of Family Rooms and other relevant laws and regulations, Party A and Party B decided to entrust Party B to decorate the room through friendly negotiation. In order to ensure the smooth progress of the project, this contract (including its annexes and all supplementary contracts) is hereby signed for * * *.
Article: Project overview
1. The house decorated by Party A is legally inhabited.
Party B is an enterprise approved and registered by the administrative department for industry and commerce of this Municipality, and holds the qualification certificate of construction enterprise issued by the Municipal Construction Committee.
2. Project: QZ _ _ QZ _ _ QZ _ _ QZ _ _ QZ _ _ QZ _ _ QZ _ _
3. room specification: qz__qz__ roomqz _ _ roomqz _ _ hall qz _ _ suite with a building area of qz _ _ qz _ _ square meters.
(1) room, qz__qz__ square meters;
(2) QZ _ _ Hall, one square meter qz _ _ qz _ _
(3) QZ _ _ kitchen, QZ _ _ square meters;
(4) QZ _ _ bathroom, in square meters qz _ _ qz _ _
5] qz _ _ balcony, qz _ _ square meters;
[6] QZ _ _ _ corridor, QZ _ _ _ square meters;
(7) Other (indicate location) qz__qz__, in square meters qz__.
4. Project content: See Annex (1) List of Home Decoration Construction Contents and Construction Drawings for details.
5. Entrust QZ _ _ QZ _ _ QZ _ _ QZ _ _ QZ _ _ QZ _ _ _
6. Project Commencement Date: QZ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
7. Completion date: QZ _ _ qz__qz__ _ qzqz___ qzqz___ _ _ _ _
Total days of the project: qz__qzqz__ days
Article 2: Project Price
The project price (in words) is RMB. For details, please refer to Annex (II) Budget Table of Home Decoration Engineering Materials.
1, material qz____ _ _ yuan;
2, labor costs qzqz___ yuan;
3. The design fee is qzqz__ yuan;
4, the construction clearance fee qzqz___ yuan;
5. The handling fee is qzqz__ yuan;
6. Management fee qz__qz__ Yuan;
7. Tax (3.4 1%) QZ _ _ QZ _ _ yuan;
8. Other expenses (specify content) qz__qzqz__ yuan.
Article 3: Quality Requirements
1. The varieties, specifications and names of the main materials used in the project shall be approved by both parties. See Annex (III) List of Final Accounts of Home Decoration Engineering Materials for details.
2. Regarding the acceptance standard of this project, both parties agree to refer to the local municipal standard DB3 1/T30- 1999 Acceptance Standard for Residential Decoration.
3. In the process of construction, if Party A has special construction projects or special quality requirements, both parties shall sign a supplementary contract for the increased cost.
4. Quality supervision department: Home Decoration Professional Committee of City Interior Decoration Industry Association.
5. The quality of all materials and equipment purchased by Party A shall be borne by Party A; Party B shall be responsible for the quality of the project.
6. If Party A hires a project supervisor, it shall notify Party B before the project starts, so as to facilitate the work connection.
Article 4: Supply of Materials
1. Party B shall clearly price the materials used in this contract in strict accordance with the relevant national price regulations. For details, please refer to Annex (II) Budget Table of Home Decoration Engineering Materials. The materials provided by Party A shall be used in the decoration project specified in this contract, and shall not be used for other purposes without Party A's consent ... If Party B uses them for other purposes, Party B shall compensate Party A at double the price of the misappropriated materials.
2. If the materials and equipment provided by Party B do not meet the quality requirements or have different specifications, they shall be prohibited from being used. If it has been used, all losses caused to the project shall be borne by Party B. ..
Article 5: Payment
1. After the contract is signed, Party A shall pay 50% of the engineering materials and engineering expenses; When the progress of the construction period is over half (year, month and day), Party A will pay 40% of the project payment for the second time. The remaining 10% shall be paid to Party A after the project is completed and accepted. (Note: Construction costs include labor costs)
The payment proportion shall be determined according to the payment schedule:
Payment Application Payment Time Payment Percentage Amount: Yuan
The content of the process is to sign a design contract with a budget of 1000 yuan.
Deducted when the payment is approved on the date of signing the intention.
Material element
The construction cost is 50%
total
The construction period is over half.
During the construction period, the construction cost is 40%.
Date, year and month
Completion acceptance 10%
Increase the number of engineering projects and sign project changes.
This form should be settled when the formalities are completed.
Party A shall pay off the project price, as shown in Annex VII of this contract, Settlement Table of Home Decoration Project, and Party B shall issue a unified handover warranty certificate of decoration project to Party A, as shown in Annex VIII of this contract, Quality Warranty Certificate of Home Decoration Project.
Party A's failure to pay on time is a breach of contract, and Party B has the right to stop the construction. If the project price is not settled after acceptance, it shall not be delivered for use.
2. If there are any additions, deletions or changes in the project construction, please refer to Annex V of this contract, Change Form of Home Decoration Project. Both parties sign a supplementary contract, and Party B is responsible for issuing a construction change order and notifying the person in charge of the construction site. Increase or decrease the project price and settle on the spot.
3. If Party A fails to prepay the project price within the time limit stipulated in the contract, Party A shall pay 1 of the unpaid project price to Party B for each overdue period.
4. If Party A mortgages the house decoration to the bank, it shall hand over the mortgage certificate and relevant documents (copies) to Party B. ..
Article 6: Construction Period
1. If the completion is delayed due to Party B's reasons, Party A shall pay the liquidated damages of 1 to Party A every day until the working expenses are deducted. If the construction period is delayed due to Party A's reasons, Party B shall be paid the labor cost 1 yuan in the decoration project price for each day of delay.
2. If the unqualified materials and equipment selected by Party A affect the project quality and time limit for a project, Party A shall bear the cost of rework, and Party B shall bear the cost of rework for quality accidents caused by Party B's construction, and the time limit for a project remains unchanged.
3. During the construction, due to the quality problems of the project, both parties disagree, resulting in the suspension of work, failure to act as punishment for delaying the work or the construction period. Both parties should take the initiative to ask the relevant departments to mediate or the arbitration department to coordinate and deal with the dispute as soon as possible, so as to continue the construction.
4. If rework is required due to Party A's reasons or the construction period is delayed due to Party A's change of construction contents, a visa is required, and Party A shall bear all the construction costs. If rework is caused by Party B, Party B shall bear the responsibility, and the construction period will remain unchanged.
5. During the construction process, Party A shall be responsible for the quality problems and time delay caused by notifying the construction personnel to change the construction content without Party B's consent.
Article 7: Project Acceptance
1. See Annex (VI) Home Decoration Engineering Quality Acceptance Form for the project quality acceptance. Party B shall organize Party A to carry out the completion acceptance after the project is completed, except that the concealed works need to be accepted by sections. Both parties shall handle the project settlement and handover procedures.
2. After Party B notifies Party A to carry out process acceptance and completion acceptance, Party A shall come for acceptance within three days. Failing to do so within the time limit, Party A shall be deemed to have voluntarily waived its rights and passed the acceptance. If there is any problem, Party A shall be responsible for it. Party A's own occupancy is deemed as qualified.
3. If Party A fails to come for acceptance within the time specified by Party B, it shall notify Party B in time and set another date. However, Party A shall acknowledge the completion date of the process or project, and bear Party B's storage fee and related expenses.
Article 8: Other matters
1, Party A
(1) The house plan and water, electricity and gas circuit diagram approved by the property management department must be provided, or Party A shall provide the house plan and water, electricity and gas circuit diagram, and make on-site disclosure to Party B. ..
(2) For the second decoration project, all or part of the house shall be vacated, and the obstacles affecting the construction shall be removed. Necessary protective measures shall be taken for furniture and furnishings that can only be partially vacated in the house, and all formalities shall be handled with Party B, and the expenses shall be borne by Party B..
(3) If it is really necessary to dismantle or change the original building structure or equipment and pipelines, it shall go through the formalities with the local housing management department and bear the relevant expenses. If you need to use public parts temporarily during construction, you should say hello to the neighborhood.
2. Party B
(1) should take the initiative to show business license, membership card or construction qualification; If it is a subordinate branch, it must also have a certificate issued by the superior company; The handling salesman must have a certificate of entrustment from the legal representative.
(2) Assign (name) as the on-site representative of Party B, be responsible for the performance of the contract, organize the construction according to the requirements of the contract, and complete the construction task on time with good quality and quantity.
(3) Be responsible for the safety of the construction site, guard against fire, hold relevant certificates, and conduct civilized construction to prevent accidents such as pipeline blockage, water leakage, power failure and damage to articles caused by construction from affecting others. If it happens, it must be repaired or compensated as soon as possible.
(4) Strictly perform the contract and implement the credit period. If the completion is delayed, such as divestiture, slowdown or excuses to induce Party A to advance funds, it will be considered as a breach of contract after investigation.
(5) undertake the warranty responsibility within the scope of decoration construction, and the warranty period is 12 months, counting from the date when the project is completed and accepted by Party A. ..
Article 9: Liability for breach of contract
After the contract comes into effect, during the performance of the contract, the party that terminates the contract without authorization shall pay the other party 5% of the total contract amount as liquidated damages. If the actual loss caused to the other party by the unauthorized termination of the contract exceeds the liquidated damages, it shall be compensated.
Article 10: dispute settlement
1. In case of any dispute during the performance of this contract, both parties shall settle it through negotiation without affecting the project progress. Or, according to the Contract and the unification issued by Party B, lodge a complaint with the Home Improvement Professional Committee of the Municipal Interior Decoration Industry Association, and demand settlement.
2. The parties are unwilling to settle the dispute through negotiation or mediation, or if negotiation or mediation fails, they may apply to the Arbitration Commission for arbitration according to this contract; -the people's court brought a lawsuit.
Article 11: Modification and Termination of the Contract
1. After this contract comes into effect after being signed by both parties, both parties must strictly abide by it. If either party needs to change the contents of the contract, it shall sign a supplementary agreement after both parties reach an agreement through consultation. If it is necessary to terminate the contract, the party who proposes to terminate the contract shall do so in writing, and pay a penalty of 65,438+00% of the total contract price, and go through the termination procedures.
2. In the process of construction, if either party proposes to terminate the contract, it shall submit it to the other party in written form. After both parties agree to go through liquidation procedures and conclude an agreement to terminate the contract, the contract shall be deemed to be terminated.
Article 12: Contract comes into effect
1. This contract and its annexes shall be sealed by both parties and come into force after being signed.
2. The supplementary contract has the same legal effect as this contract.
3. This contract (including annexes and supplementary contracts) is made in duplicate, with each party holding one copy.
Party A (Owner): (Signature) Party B: (Signature)
Address: Enterprise:
Postal code:
Work Unit: Legal Representative:
Third, the all-inclusive renovation budget list
1, spare part
There are many basic decoration projects of the house, which are also more important. Usually this budget is quoted by the decoration company and calculated by area. If a house of 1 10 square meter is decorated into a three-bedroom apartment, the price of accessories is about1.5-20,000 yuan.
2. Hydropower transformation
Hydropower transformation is a concealed project, and the quotation depends on how the waterways and circuits are planned. Usually, the approximate price of hydropower transformation is around 6000 yuan.
3. Price of main materials
The main material cost accounts for a large part of the whole decoration cost, including many contents, such as tiles, wooden doors, toilets, cabinets, paints, ceilings and so on. The budget of ceramic tile is about 8,000 yuan, pure paint is about 2,000 yuan, excluding some art paint, and the cost of wooden door is controlled at about 6,000 yuan. The main material decoration cost is generally around 30,000-50,000.
4. Equipment
The prices of different grades of furniture vary greatly. The price of solid wood furniture is high, and the board is relatively cheap. It is conservatively estimated that the furniture will cost about 30 thousand.
5. Home appliances
Household appliances include: air conditioner, refrigerator, washing machine, water heater, water dispenser, computer, TV, etc. This part of the cost is difficult to calculate, and different brands and grades have a great impact on the budget.
6. Architecture
The total cost of decoration is determined by the decoration area, construction price, construction difficulty and engineering quantity, and the total cost of decoration construction also accounts for a part of the proportion. 1 10 flat housing construction price is about 20,000-50,000 yuan.
Note: The above prices come from the Internet and are for reference only!
- Related articles
- Three-day tour in Wuhan
- Tourists suddenly vomited after drinking mineral water from Sanya Hotel. Who should be responsible for this?
- How to get to Shanghai Vienna Hotel from Shanghai South Railway Station
- If He Chun Jingming is from September? . This is a story of arrogance and prejudice.
- Huayu Hot Spring Who knows the price?
- ? Li Duohai, the "king of hotels", was saved by her sweet makeup.
- What bus should I take from Huangjiang to Xuan Ying Business Hotel?
- How many five-star hotels are there in Ningbo? What are their names?
- Where is the real estate address of Chengdu Global Sunac Shifangtang?
- How about wheel brand butter stir-fry