Traditional Culture Encyclopedia - Hotel reservation - May I ask some questions about water supply and drainage in hotel design?
May I ask some questions about water supply and drainage in hotel design?
If the first floor of the hotel is the lobby, and the second or third floors are standard-floor guest rooms, the pipe well should be arranged at the top of the first floor. At this time, the pipes along the top need to be redirected to horizontal horizontal pipes, and then Vertical is what you call "bending". Through interior decoration of hotels, the first-floor halls are generally decorated with suspended flat ceilings. The pipes in the suspended flat ceiling (but whether they are horizontal pipes, vertical pipes or "bent", such as water pipes, water pipes, fire pipes, air conditioning pipes, strong and weak wires, etc.) are invisible, so they do not affect the appearance. .
- Related articles
- What about Zhengzhou Goldfinger Sculpture Design Co., Ltd.?
- A month after divorcing his ex-wife, he wants to remarry. What did he say after meeting his ex-mother-in-law at the hotel?
- Be sure to go to the beauty shop in Tokyo. Where is it convenient to live in Tokyo?
- It is not easy to find a suitable hotel in Xiangyang. Are there any girls who have no place to sleep? Come and compete with me for a house.
- How to determine the long-term rental price of Meituan B&B?
- Which office furniture company to look for in Shanghai?
- "Death Illusion": Do you feel lonely now?
- What if the cash in the hotel bag is less than 10 thousand
- How to get to Fuchi Business Hotel from Yiwu Railway Station?
- Can Jin Bai Han pay with flowers?