Traditional Culture Encyclopedia - Hotel reservation - How to install the upper and lower pots?
How to install the upper and lower pots?
When installing a basin on the table, a drainage baffle should be installed around the sink first. When finished, wrap the glass glue around the rubber ring for re-draining, and then put the sink into the groove with an opening on the desktop. After the sink is put away, hang the sink with a hook and fasten it, and then use it after the glue in the sink dries (generally after 24 hours). But when opening a hole in the table, it must be opened according to the size of the hole, otherwise it will not seal the water well and cause the table to leak.
Installation method of the pool under the platform:
1. First, prepare the countertop of the basin under the platform. At present, quartz stone countertops are commonly used, and then holes suitable for water basins are dug under the countertops in advance.
2. Fix the basin under the table and the countertop on the back. We can block the edge of the basin with many stones and stick it with special marble glue. It only works well between stones.
3. In order to ensure that the basin under the platform is relatively small, we can also make a bracket under the basin under the platform to support it.
4. After all the installation is completed, we will fill the gap with glue, and then after the glue is dry, we will do a water closing test to see if there is any water leakage.
Extended content:
Installation method of hanging basin:
1. Mark the installation height and center line on the finished wall by measurement. The recommended installation height is 82cm2. Move the basin along the center line to the installation position, adjust it to the horizontal center, and fix the installation hole position on the wall.
2. Carefully open the basin, drill bolt holes at a proper distance from the anchor hole on the wall, install the bolt on the wall, keep each bolt exposed for about 45MM4 to adjust the basin, put the washer and tighten the nut until it is appropriate, cover the decorative cap 5 to lean the bracket against the wall and correct its position, then anchor the hole, install the bracket on the wall, and connect the basin with the bracket with four pieces of rubber particles. 6 Install the faucet and drain assembly and connect them according to the instructions of the purchased water parts.
- Related articles
- Which is the best art school in Changsha?
- How about Huizhou Fubang Hotel Management Co., Ltd.?
- How many kilometers from Gaoping North Bus Station to Jincheng
- How to manage the company after the epidemic is released
- Is Northern Holiland only in Xinxiang?
- Tujia hotel aromatherapy
- Where is Pingtan in Huizhou?
- Is there a charge for cleaning the Atour Hotel?
- How to turn on Haier TV in Xi 'an County International Hotel?
- Seek the self-driving route from Shenzhen to Xiamen! Fun attractions, accommodation, eating and so on! Thank you very much.