Traditional Culture Encyclopedia - Hotel reservation - Self-decoration filing for decoration filing
Self-decoration filing for decoration filing
1, house decoration declaration
(1) Residential decoration: Before indoor decoration, the registration shall be reported to the property management unit and the urban construction supervision squadron where the residence is located.
(2) Non-residential (business premises) decoration: Before decoration, you should bring relevant materials to the Urban Construction Supervision Squadron to apply for the house decoration permit.
(3) Decoration of houses with a project investment of more than 300,000 yuan and a building area of more than 300 square meters: the construction unit shall bring relevant materials to the Urban Construction Supervision Squadron to apply for the building construction permit before the start of construction.
2, housing repair application materials
(1) application form for house decoration;
(2) The certificate of ownership of the house, if the user of the house applies, shall also submit the certificate that the owner agrees to decorate;
(3) Copies of the applicant and the property owner;
(4) If the house is leased, submit the lease contract;
(five) the renovation of the house involves changing the structure of the house or obviously increasing the load, and the design drawings of the house design unit or the conclusions of the professional department on the overall safety of the house shall be submitted;
(6) The decoration of the fa? ade shall be approved by the planning department.
Li Zhe office building renovation filing process?
Archiving process:
1 Open your mobile phone and find the Zhejiang Office APP.
Tip: If you don't have Zhejiang Office APP, you can go to the mobile phone application market and search for "Zhejiang Office" to download. New users need to register first.
2
Open the Li Zhe Office APP, select your Chun 'an County, and enter "State-owned Land Renovation Record" in the search box.
three
Click "Online Handling" under "Renovation and Filing of Residential Buildings on State-owned Land".
4GPS positioning, choose Chun 'an County, Hangzhou.
five
Category of applicant: If the owner on the property right certificate applies by himself, select "Owner applies for decoration"; If the owner does not apply for decoration, select "Owner applies for decoration" (note that if the owner does not apply for decoration, the following materials need to be uploaded with the "Entrustment Application Form"), and then click OK.
six
Fill in online, according to the actual situation of the owner, the red one must be filled in correctly, and the house address should be filled in the room according to the address on the real estate license or contract.
Property: housing or non-housing.
Structure type: generally frame (possibly brick-concrete or brick-wood structure).
Description of changed original structure: There are two ways to fill in. One is to decorate the original apartment without changing. If the original structure has not changed, you can write "No change"; Second, there are changes. If the original drawing is modified by a professional design company, the expression here must be consistent with the expression on the modified drawing (for example, it says "kitchen filler wall removed", and the kitchen filler wall is also removed on the drawing).
eight
Continue to upload the materials as required, and the requirements are all electronic versions of the originals. Click "Next".
nine
Power of attorney: if the application is made by the property owner himself, a power of attorney is not needed. If the non-property owner applies, the power of attorney and the original electronic version of the agent's (non-property owner's) ID card shall be uploaded.
10
Original floor plan or revised floor plan for house decoration: If there is no change according to the original structure, please mark "no change" on the original floor plan and sign for confirmation. If there is any change, upload the original plan first, and then upload the drawings provided by the professional design company.
Note: During the filling process, you can click Save Draft. If it is wrong, you can find the information you filled in in my draft box for easy modification.
1 1
Generally speaking, the default pick-up method is electronic. If the application is successful, you can view the SMS reminder on your mobile phone.
12 Submit after confirming the information.
What's the difference between self-installation and commercial installation in property decoration?
For property filing, there is a slight difference between self-installation and commercial installation. Self-installation is generally decorated according to personal preferences. In the process of decoration, the owner is present to supervise the work. General decoration is more exquisite than commercial installation. Commercial installation is a unified decoration by the director, which is slightly rougher than self-installation. If the property company is the director's own property, then the commercial installation problem property should be handled, and the self-installed property is not responsible.
How to put on fire record for office building decoration?
1. Online filing: Fill in the form and declare it on the fire control network, and send the information to the fire control department for inspection within 5 working days if it is selected;
1, online application for approval; The compilation of all relevant design data, decoration design drawings, fire water supply, automatic fire extinguishing system, automatic fire alarm system, fire power supply system, smoke control system, emergency lighting and evacuation indication system and other relevant fire protection system design drawings shall be designed by formal qualification units and sealed documents shall be provided; At the same time, provide business license and qualification certificate; Obtain the decoration permission letter issued by the fire department;
2. Online application for approval is not selected: direct construction must be accepted (the information selected in online application must be perfect before it can be accepted);
Second, the decoration permit; Obtain the decoration permission letter issued by the fire department; Third, send for inspection; 1, material samples, building materials used in the process of fire protection decoration, take samples for inspection; Generally, the most frequently sampled fire-fighting coatings, fire doors, emergency lights, evacuation signs, fire extinguishers, and carpets are also decorated.
2. Preparation of materials and materials, copies of relevant qualification certificates of sample materials, inspection reports submitted by legal inspection institutions of fire protection products, and production licenses or filing certificates of fire protection products sold and used in our province;
3. Prepare enterprise information;
Fourth, acceptance; After the completion of the fire fighting project, you should apply for acceptance; There are two options for online declaration by lottery:
1, the fire department staff came to the site for acceptance; According to the actual situation, on-site acceptance is not required, and it is decided according to the particularity of the project;
2. If the acceptance is unsuccessful, all the above-mentioned relevant fire protection design materials must be provided, and the pictures and texts are consistent with the actual construction; 5. Unpacking inspection; The fire brigade will send staff to the site to check whether it is consistent with the information you submitted and whether it meets the specifications. You can't start business until you get a certificate;
6. on-the-job training; The staff went to the door to preach fire protection knowledge, explain the use of fire equipment, the implementation plan of emergency rescue drills for fire accidents such as escape, popularize relevant fire protection knowledge, master emergency rescue procedures and the operation and use of fire equipment, and improve the emergency handling ability of on-site management personnel.
Does the decoration company need to do decoration filing?
Yes, after the house was renovated, the owner signed a contract with the decoration company. The decoration company takes the property management company where the house is located for record. Ice is equipped with fire fighting equipment as required. Let the property management company handle the decoration formalities after the acceptance. After the decoration company starts construction, it must carry out the construction according to the requirements of the property management company without affecting the rest of other owners.
- Related articles
- How to complain about the hotel's personnel department
- Where is the Bund Peninsula Hotel in Harbin?
- Ten must-see attractions in Chaozhou.
- Auspicious Feng Shui ornaments and their placement positions
- What is the telephone number of Shengjing Sales Center in Shimaowan District, Zhongshan?
- List of places of residence of new cases in Shanghai on October 9 (where does the 1 new locally confirmed case in Shanghai live)
- The price of wedding wine in Zhongshan city
- Is Nelson art paint better or Gabrielle's?
- What places of interest are there in the world?
- Which police station is under the jurisdiction of New Mango Spring in Zhengzhou High-tech Zone?