Traditional Culture Encyclopedia - Hotel reservation - How to write the Indian flying cake contract?
How to write the Indian flying cake contract?
Buyer:
Seller:
According to the Contract Law of People's Republic of China (PRC) and other relevant laws and regulations, on the basis of equality, voluntariness, fairness, honesty and credit, the Buyer and the Seller have reached the following costs for the sale of stone products:
Article 1 Product name, trademark, model, quantity, amount, delivery time and quantity:
Product name and brand
Trademark specification
Model measurement
Unit Quantity Unit Price Amount Delivery (Delivery) Time and Quantity
Total amount of RMB (in words):
(Note: If there is not enough space, you can connect separately. )
Article 2 Product quality requirements: the national standard for the limit of harmful substances in interior decoration materials shall be implemented. Stone is a natural product, and there may be differences in stone particles and colors. Product samples are attached to the contract.
Article 3 Packaging Standards, Supply and Recycling of Packaging Materials:
Article 4 Place and Method of Delivery (Delivery)
Article 5 Acceptance methods:
Article 6 Payment Method and Time: Both parties agree to pay the price by the 1 method.
(1) When signing this contract, the buyer shall pay (deposit/advance payment) yuan (the deposit shall not exceed 20% of the total price), and the balance shall be paid in one lump sum after the delivery (acceptance) of the goods.
(2).
Article 7 Liability for breach of contract:
(a) the seller's liability for breach of contract:
1. If the variety, model, specification and quality of the products delivered by the seller are not in conformity with the contract, and the buyer agrees to use them, the price shall be determined according to the quality; If the buyer can't use it, the seller shall unconditionally return it or compensate the buyer for the losses incurred.
2. If the seller delays the delivery, it shall pay the buyer a penalty of% of the delayed delivery price every day; If the delivery is overdue for more than days, the buyer has the right to terminate the contract in addition to paying the liquidated damages, and the deposit, advance payment or price collected by the seller shall be returned in full, but the buyer has the right to ask the seller to return the deposit twice without collecting the liquidated damages.
(2) the buyer's liability for breach of contract:
1. If the buyer delays the delivery, it shall pay the seller a penalty of% of the delayed delivery price every day.
2. If the buyer unilaterally terminates the contract without justifiable reasons, it shall compensate the seller for the economic losses suffered as a result, and the paid deposit has no right to demand the return.
(3) If either party proposes to increase or decrease the contract quantity or change the delivery time, it shall do so in advance.
Notify the other party and obtain the consent, otherwise it shall bear the liability for breach of contract.
Article 8 Ways to settle disputes over product sales contracts: Disputes arising under this contract shall be settled through negotiation between the buyer and the seller or by applying for mediation; If negotiation or mediation fails, it shall be settled in the following ways:
(a) submitted to the Arbitration Commission for arbitration.
(2) Bring a lawsuit to the people's court.
Article 9 Other agreed matters:
Article 10 The sample sales contract of this product shall come into effect as of the date of signature and seal by both parties, in duplicate, one for each party, with the same legal effect.
Buyer and seller
Company name (seal) Company name (seal):
Company address: Company address:
Legal representative:
Authorized Agent: Authorized Agent:
Bank of deposit: Bank of deposit:
Account number: Account number:
Tel: Tel:
Signing place: Signing time: year month day.
- Previous article:How to take the bus to Yihao Hotel, No.99 Huangshan Road, jianye district, Nanjing?
- Next article:How to use the toothbrush sterilizer?
- Related articles
- Take stock of the domestic animations that have made people excited in recent years?
- How to book a hotel on Railway 12306?
- I was born at 8 o'clock on April 20, 20982 in 65438 Gregorian calendar. Does my name Jin Chengxiao match the eight characters? Where is Jin Jian?
- How to get to Huang Du Xietong from Shanghai Hongqiao Railway Station?
- Hayes Hotel Zhongshan
- Can the hotel projector play songs?
- Tips on anti-terrorism and riot safety
- When using Guotai Junan¡¯s great wisdom 5 times.
It is preferred that the main site does not have a server
- Why is the telecom broadband in Longnan, Jiangxi so poor?
- How to charge Tesla when running long distances?