Traditional Culture Encyclopedia - Hotel reservation - When will the Longgong Port Special Railway Line be completed?
When will the Longgong Port Special Railway Line be completed?
On September 16-17, the technical review meeting of the feasibility study of Longgong Port Special Railway Line was held in the beautiful hotel of the group company. At the meeting, I hope that China Railway Jinan Road Bureau will continue to give care, support and help, and the design unit will complete the revision and revision of the feasibility study as soon as possible.
Longgong Port Special Railway Line Project is the second hot metal combined transport project built by the group company after Liangshan Port Special Railway Line Project. It is a key wing of the integration and development of Longgong Port and Lingang Industry, and an important guarantee force for the expansion and upgrading of Jining West Railway Station.
- Previous article:When will Yunlai Yimeng come back?
- Next article:The specific location of Kunming Hengzhiyuan Hotel
- Related articles
- Is Zhengzhou Sunac Yin Ji International Tourism City Worth Buying?
- Do I have to pay for cleaning hotel sheets with blood stains?
- How far is it from Huizhou South to Gold Coast?
- Wendham or Aloha when going to Lingshui?
- How about Shaanxi slack Special Cleaning Equipment Co., Ltd.
- What about Handan Hanshan Yuetu Car Rental Co., Ltd.?
- Is it hot to travel to Beijing in summer vacation?
- Is Yingpan Hotel in Gulou District of Xuzhou an isolation point?
- How much is one or two pieces of silver equivalent to today in the Ming Dynasty?
- Is it easy to be a cashier in the supermarket? Tired?