On-site safety management system of the first phase project of resort hotel?

1safety management system 1. Establish and improve the site safety management network and implement the safety responsibility system. This project implements the project manager responsibility system. The project manager is fully responsible for the site safety work, the deputy manager in charge of production presides over the daily safety management work, and the project engineer is responsible for the safety technical work. The Project Management Department is equipped with full-time security officers, and each team is equipped with part-time security officers. (See Figure 1-1 Safety Management Assurance System below for details.) Figure 1-1: Network of Safety Management Assurance System Figure 2. Incorporate the safety management system of each subcontractor into the general contracting management system. The general contractor and subcontractors shall sign safety production responsibility letters respectively. 2 Safety guarantee measures 1. Strictly implement the relevant regulations issued by the state, such as the Technical Operation Specification for Building Installation Safety, the Technical Specification for Working Safety at Height in Building Construction, and the Technical Specification for Temporary Electricity Use in Construction Site. Implement standardized management on the construction site. Focus on preventing falling from high altitude, object strike, electric shock and lightning strike. 2. Establish and improve the on-site safety management network and implement the safety responsibility system. Carry out the project manager responsibility system. The project manager is fully responsible for the site safety work, the deputy manager in charge of production presides over the daily safety management work, and the project engineer is responsible for the safety technical work. The Project Management Department is equipped with full-time security officers, and each team is equipped with part-time security officers. 3. Seriously implement the safety education system, safety meeting system and safety duty patrol system. 3.1 Workers must receive safety education before entering the site, and establish three-level (company, project department and team) safety education files (education card, green post certificate and safety production responsibility book). 3.2 Arrange production tasks and make safety disclosure at the same time. 3.3 The Project Department shall hold a safety meeting once a week to arrange and summarize the safety work. The team held a meeting before going to work, arranged tasks and explained safety precautions. 3.4 Set up a security attendant to patrol the site every day, and deal with the problems immediately. 3.5 Organize a monthly inspection of standardized management on the construction site to ensure that the score is not less than 8 points according to the ministerial standard, and achieve excellent standards. 4, strictly implement the system of special type of work related certificates, without training and license shall not work. 5. Personnel entering the site must wear safety helmets. Fasten your seat belt when climbing. All kinds of safety signs should be set up on site as required. 6, to coordinate the relationship between the excavation face and transportation road, to avoid mutual influence. 7. Strengthen the management of electricity consumption in site construction. 7.1 Installation, maintenance or dismantling of temporary electricity projects must be completed by electricians with work licenses. 7.2 TN-S neutral protection system is adopted for temporary power lines on the construction site. One motor, one brake and one safety shall be implemented for the electrical equipment, and all the electrical equipment shall be provided with safety shields, which shall be grounded and connected to zero. Machine operators should hold relevant certificates. All the equipment entering the site can only be transferred to the construction site after the company's warehouse has been debugged well. 7.3 All kinds of temporary wires and electrical equipment on the construction site should be strictly checked for safe use of electricity. Standard iron-clad electrical boxes should be used for electrical boxes, and rubber insulated wires should be erected overhead. And fixed with porcelain bottles. The distribution box and switch box must be protected from rain and dust. More than 7.45KW or more than 5 machines must be provided with electricity scheme measures. (Calculate the total capacity of construction machines and tools, lighting power consumption, total box incoming area, sub-box incoming area and power distribution, draw a single-line diagram of line direction and box position, and stipulate daily power consumption management measures and emergency fire prevention measures). 7.5 The road leading to the power distribution room (box) must be unblocked, the position of the electric box should be reasonable and stable, and the outgoing line should indicate the purpose. Construction lighting has special circuits and leakage protection measures. If conditions permit, we can consider using 36V lighting, and the iodine tungsten lamp must have a fixed base. 7.6 On-site electric tools must be provided with protective grounding or zero connection according to regulations, and electric shock protectors must be installed. The electric boxes, knife switches and contact protectors used on site must be numbered, and the electricity consumption should be strictly in accordance with the three-level protection, so as to achieve single machine, single brake and single contact protector to prevent electric shock accidents.

for more information about the engineering/service/procurement bidding, and to improve the winning rate, you can click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd