Traditional Culture Encyclopedia - Hotel reservation - Traffic Control of Juzizhou Bridge Construction in June
Traffic Control of Juzizhou Bridge Construction in June
Because there will be traffic control during the construction of the Orange Island Bridge, friends must pay attention to detours when traveling. The duration of different sections is definitely different, so in order to save everyone's time, it is best to know the traffic control sections first. Traffic control on the east culvert of Juzizhou Bridge
According to the traffic police detachment of Changsha Public Security Bureau, traffic control will be implemented on the east culvert of Juzizhou Bridge from June 2th due to the construction needs of upgrading and reconstruction project in wuyi avenue.
Traffic control time
From June 2th, 22 to June 26th, 22, 24:
Traffic control on wuyi avenue orange section
. Traffic control of xiangfu road bridge
the motorway heading west to east Africa of xiangfu road bridge will be rectified, and the specific control time and road sections will be arranged as follows:
control time
from June 2, 22 to July 5, 22
from 9: 3 to 16: 3 and from 2: to 6: the next morning
.
during the construction period, the traffic organization will remain unchanged, but the location of the confluence of the main line and ramp on the west side of Xiangfu Road Bridge will move westward and backward, and the width of the opening will be narrowed to about 4 meters. The construction will affect the capacity of the ramp on Xiaoxiang South Road and the main road of Xiangfu Road Bridge to the east, which will aggravate the traffic congestion during peak hours. Water cut-off information
In order to cooperate with the construction of municipal pipe network supporting facilities, Changsha Water Supply Co., Ltd. will cut off water connection in some areas of Changsha from 22: to 23: on June 22nd
Xiangjiang Middle Road (kaifu temple Road-Xiangchun Road) will be cut off
Xiangjiang Middle Road (kaifu temple Road-Xiangchun Road) and Xiangya Road will be cut off at that time.
Key impact areas:
Including Yatai Garden, Fusheng Garden, Pilotage Jiangge, Fuxiang Garden, Kaiyue International City Phase I and Phase II, Golden Roof, Fule Xiangjiang Jincheng, Shangshang Meiyu, all the virtues Taiwan Community, Wood-based Panel Factory Dormitory, Youpu Street Community, Xiangjun Huatian Hotel, Science and Technology Publishing House Dormitory, Sanjiaotang Community, Huasheng New Bund, etc. The water pressure and water volume in the adjacent areas will be reduced. In some high and remote areas, it is possible to delay the arrival time of water, so please prepare for water storage.
From 21: on June 22nd to 7: on June 23rd
The water supply of the Environmental Protection Avenue (BYD Road-Zhendong Road) will be cut off
At that time, the hatchbacks along Zhendong Road (south of Environmental Protection Avenue) will be cut off.
key affected areas:
including Junhui Shangpin, Jinping Community, Kaisa Phase I and Phase II, Luma Town, and the water pressure and water volume in the adjacent areas will be reduced.
- Previous article:Requirements for Property Management Rooms of Zhuhai Hotel
- Next article:What is the function of hotel personalized service?
- Related articles
- How to apply for bulk liquor business license?
- Introduction of Tiantong Kangda Hotel Sanya
- How to get to Dalian discoveryland Theme Park? Recommend the fastest and least crowded classic amusement facilities.
- What about the surrounding facilities of Changxing Garden Community in Zhengzhou?
- How to choose a good toothbrush
- Catering service of Zigong Tanmulin City Celebrity Hotel
- Brief Introduction of Changzhou Xinbei wanda plaza Plaza
- Hunan Huaihua booking telephone
- What should I do if I find a case in an isolation hotel and go to a local hospital to refuse it?
- How much is the salary of One Thousand and One Nights in Yixian County?