Traditional Culture Encyclopedia - Hotel reservation - Introduction of Baoding Bridge in Tianjin?

Introduction of Baoding Bridge in Tianjin?

Tianjin Baoding Bridge spans the east and west banks of Tianjin Haihe River. Designed by Tianjin Municipal Engineering Design and Research Institute and undertaken by Tianjin Urban Construction Group Corporation. At the end of June 5438+October 2005 10, the 28-meter-wide approach bridge on the east bank of Baoding Bridge was basically completed. June 65438+1October 65438+April 2005, with the accurate positioning of the last 33-ton steel beam of the tower column, the 50-meter-high main tower of Baoding Bridge was finally capped, which indicated that the "sailing" of Baoding Bridge had been basically completed. On March 29th, 2006, all the stay cables of Baoding Bridge were installed, and the main project was declared completed. It was opened to traffic on September 25th.

comment

Connecting Heping District and Hedong District, it is a bridge that not only meets the traffic function but also has landscape effect. The Heping District of the bridge starts from Jiefang North Road, along Baoding Road to Taierzhuang Road, and crosses the Haihe River and the planned Haihe East Road (underground tunnel) in the form of single-tower cable-stayed bridge. One side of Hedong District was affected by the demolition of South Railway Station, and a temporary approach road was temporarily laid to bypass Haihe East Road.

compose

The bridge is a composite structure of steel and concrete, the main span is a steel box girder structure and the side span is a prestressed concrete box girder structure. The main tower of the sail bridge is a steel-concrete structure with a height of 50 meters. The total length of the bridge is 23 1m, and the total bridge area is 1 1.600 m2, of which the bridge area is 6,778 m2 and the road area is 4,822 m2.

geographical position

Baoding Bridge sinks across Taierzhuang Road on the west bank of Haihe River, lands on Jiefang North Road and connects Baoding Road in Heping District. The east bank passes through the business circle of South Station in Hedong District and ends at Liuwei Road in Hedong District. The main span of the bridge is 1.20 meters, with the roads on both sides of the bridge, the total length is 570 meters. The most striking thing about the whole bridge is the "sail"-shaped main tower at the bridgehead on the west bank, which symbolizes that Tianjin, an international port metropolis, is braving the wind and waves and becoming increasingly prosperous. The main tower is 50 meters high and leans 75 degrees to the west. The shape of the tower is simple. This bridge has no piers in Hanoi, but the deck is "pulled up" by the tension of cables. These stay cables incline downward from the top of the main tower to the center of the bridge deck in the form of sparse cables. Six stay cables are connected to the bridge deck of the main span, and the cable spacing is15m.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.