Traditional Culture Encyclopedia - Hotel reservation - What is the basic process of hotel decoration?

What is the basic process of hotel decoration?

The basic process of hotel decoration:

1, determine the construction scheme. Because hotel decoration is a big project, it is not easy to determine the hotel design scheme and construction project. Therefore, it is necessary to conduct a detailed interview with the decoration company in order to determine the construction drawings and samples of the main materials, and confirm whether they are the drawings required by the owner in the middle of the design.

2. Construction deployment. First of all, we need to choose excellent management personnel and on-site daily management team, and the post responsibility area of personnel must be clear. Secondly, there are enough decoration workers, including carpenters, oilers, bricklayers, electricians, hydraulic workers, wallpaper workers, coolies and security guards, who all need to try their best to meet the whole hotel decoration project.

3. Determine the construction process. Because the hotel has two different classifications: guest room part and public part, we should consider its difficulty, material supply and construction personnel's entry order according to its characteristics.

4. Basic decoration. Foundation decoration includes four projects: hydropower project, carpentry, bricklayer and oilman, among which hydropower project is the main stage of the whole hotel decoration project. As a hidden project in the whole hotel decoration, the owner must supervise whether the construction personnel are strictly in accordance with the construction drawings.

5. Acceptance stage. There are many items that need to be checked and accepted in hotel decoration, including fire protection, gas pipeline, environmental protection, water and electricity, etc. , and make a list of unqualified items, to the decoration company, inform the timely modification.

Extended data:

Problems existing in hotel decoration

1, out of line with social needs. Based on their own perceptual knowledge of hotels, some investors directly invest in new hotels without completing market research, hotel site selection, hotel positioning, hotel scale and grade determination, and project feasibility analysis. No design unit participated in the initial stage of hotel preparation.

2, simply consider aesthetics. Some hotels are beautiful in appearance, but their internal functional planning and decoration are in a mess, with unprofessional design, poor practicality and lack of artistry. As a result, the hotel needs secondary renovation after operation, resulting in "secondary investment", and some hotel designs even have no chance to make up for it, which has become a stumbling block to hotel operation.

References:

Baidu encyclopedia-hotel decoration and design