Traditional Culture Encyclopedia - Hotel reservation - Hotel Woodworking renovation contract

Hotel Woodworking renovation contract

Hotel Woodworking renovation contract Model

In a society where people pay more and more attention to contracts, the status of contracts can not be ignored, and contracts coordinate the relationship between people and things. So what should we pay attention to when concluding a contract? The following is a sample of renovation contract, a hotel carpenter. Welcome to reading. I hope you will like it.

Hotel Carpenter renovation contract 1 (hereinafter referred to as Party A): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Decoration enterprise (hereinafter referred to as Party B): _ _ _ _ _ _ _ _ _ _ _

In accordance with the Contract Law of People's Republic of China (PRC), the Measures for the Administration of Residential Interior Decoration of People's Republic of China (PRC) and the Ministry of Construction and relevant regulations, Party A and Party B enter into this contract through consultation.

A, decoration construction projects

1. Decoration Project Location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. House structure: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _,

3, decoration construction content and requirements

______________________________________________________、

4. Project contracting mode: Both parties agree to adopt the following _ _ _ _ contracting mode:

(1) Party B's contractors and contractors;

(2) Party B's packaging and some packaging materials, and Party A provides some materials;

(3) The contractor of Party B and the contractor of Party A, namely the contractor.

Second, the project cycle

The construction period is _ _ _ _ _ days, and the commencement date is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

The following conditions are confirmed by the Employer, and the project will be postponed accordingly:

(1) engineering quantity change and design change;

(2) Force majeure;

(3) Other circumstances in which the Employer agrees to postpone.

If the project changes through negotiation between both parties, the project will be adjusted accordingly.

Third, the project cost and payment method

1. Total project cost: _ _ _ _ _, in which: design fee: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

2. Payment method: Three days before the commencement date agreed in the contract, Party A shall pay 40% of the total project price, totaling RMB, and the rest shall be paid in installments according to the construction progress plan;

(1) Before the carpenters enter the site, pay 40% of the total price, that is, _ _ _ _ _ _ yuan;

(2) The painter shall pay 17% of the total price before entering the site, that is, RMB _ _ _ _ _ _ _;

(3) The balance of 3% _ _ _ _ Yuan shall be paid in one lump sum after the project is accepted. Cleaning works should be paid in one lump sum before construction. If the project cost is adjusted due to the change of engineering quantity and design scheme, it shall be settled according to the final accounts of the project after the project acceptance. Both parties will issue invoices or official receipts for currency transactions.

Fourth, the supply of materials and equipment

1. Materials and equipment provided by Party A:

The materials and equipment purchased and supplied by Party A in this project must meet the national quality standards and environmental protection standards, otherwise, Party B will not be responsible for the quality problems and other problems caused by this. Materials supplied by Party A shall be delivered to the site according to the construction progress, accepted and signed by Party B, and kept by Party B. If losses are caused by improper storage, Party B shall be responsible for compensation.

2. Materials and equipment purchased by Party B:

All materials and equipment purchased by Party B must conform to the brand, specification, model and quality indicated in the quotation, and submit a test report to the owner, including environmental protection test data.

The materials and equipment purchased by Party B must meet the national standards, otherwise Party B shall be responsible for the losses caused to the project; If the materials and equipment purchased by Party B are designated by Party A, Party B will not be responsible for any quality problems.

Verb (short for verb) others

1. This contract shall come into effect as of the date of signature by both parties.

2. This contract is made in duplicate, one for each party.

Party A: _ _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Hotel Woodworker renovation contract II: (hereinafter referred to as Party A)

Contractor: (hereinafter referred to as Party B)

After friendly negotiation, Party A and Party B reached the following contract on the woodworking service contract for the renovation of the old office building of the Local Taxation Bureau on the principle of mutual benefit.

1. Name and address of the project: Woodworking service contract for the reconstruction of the old office building of Shiyan Local Taxation Bureau. Old office building of Shiyan Park Road Local Taxation Bureau.

Second, the project contracting scope: office building:

1, 300*300 flat-topped aluminum gusset ceiling bathroom; 600*600 office.

2. The middle part of the first-level ceiling of light steel keel gypsum board is formed, calculated according to the expanded area.

3, light steel keel gypsum board flat top.

4. Draw a V-shaped seam in the middle of the flat top of the aluminum-plastic plate: between 12-20, and seal the seam of the light steel keel at the bottom with nine calendar plates.

5. Aluminum-plastic plate wrapped column is calculated by area.

6, joinery plate beam, do unilateral, gypsum board.

7. The joinery board at the bottom of the edge mouth is covered with 30mm and 200 mm stainless steel. ..

8, back, modeling, with double-layer gypsum board skin hard bag modeling in the middle.

9. Dry-hung sound insulation film with gray perforated aluminum plate.

10, stainless steel beam.

3. Contract method, project cost and payment method: The contractor does not include materials.

1, 300*300 flat-topped aluminum gusset ceiling bathroom; 600*600 office, unit price 13 yuan /m2.

2. The middle part of the first-level ceiling of light steel keel gypsum board is formed, and the unit price of the expanded area is 34 yuan /m2.

3. Lightweight steel keel gypsum board with flat top, unit price 17 yuan /m2.

4. V-shaped seam in the middle of flat top of aluminum-plastic plate: between 12-20, and the bottom of Jiuli plate is sealed with light steel keel, and the unit price is 40 yuan /m2.

5. Aluminum-plastic plate wrapped column, calculated by area, with unit price of 40 yuan/m2.

6, joinery plate beam, do single-sided, gypsum board, the unit price of 30 yuan /m2.

7. The joinery board at the bottom of the edge mouth is covered with 30mm and 200 stainless steel, and the unit price is 20 yuan /m2.

8. The back and modeling, with double-layer plasterboard skin hard package modeling in the middle, with unit price of 40 yuan /m2.

9. Gray perforated dry-hung aluminum plate with sound insulation film, with unit price of 25 yuan /m2.

10, stainless steel beam, unit price 30 yuan /m2.

1 1, and the above unit prices all include painting fire retardant paint.

12. At ordinary times, 70% of the completed engineering quantity is paid, 25% of the total price is paid after the project is completed and accepted, and 5% of the quality deposit is paid one year after the completion and acceptance.

Four. Duration and quality: commencement date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ The layering shall be straight, uniform in width, tight in joint and free from pan-alkali. After the construction is completed, Party A will conduct quality acceptance.

Verb (short for verb) Responsibility of both parties:

1. Party A shall provide Party B with gantry crane, construction power supply and water supply. After the construction waste is eradicated, Party B will transport it away. ..

2. Party B's concealed works shall be notified to Party A for acceptance and signature, otherwise it shall be deemed as unqualified. Party B shall obey the management of Party A during the construction period.

3. After the signing of this contract, Party B shall pay the performance bond and quality bond RMB to Party A, which will be returned after the project is completed and accepted.

4. If the person in charge of Party B fails to arrive at the construction site on time every day, 500 yuan will be fined every time, and Party A's project safety management measures will be strictly implemented. Project safety management measures are effective annexes to this contract. Party B shall take full responsibility for the safety of its construction personnel.

5. This contract is made in triplicate, with each party holding one copy. Matters not covered in this contract shall be settled by both parties through consultation.

Employer: Contractor:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Hotel Woodworking Decoration Customer (Party A) Contract 3:

Organizer (Party B):

After friendly negotiation between Party A and Party B, Party A decided to entrust the carpentry part of the room decoration to Party B.. In order to ensure the smooth progress of the project, this contract is hereby signed in accordance with relevant national laws and regulations for * * * * to abide by.

Article 1: Project Overview

1 project address:

2. Living room specifications: The room has two rooms and two halls, with a total construction area of 78 square meters.

3. Construction content: interior decoration woodworking part, including (two wardrobes, two desks with bookshelves and chairs, shoe cabinet screen, wine cabinet, bar, porch door cover, kitchen door cover, living room balcony door cover, washing machine cabinet, kitchen hanging cabinet, living room, dining room and aisle ceiling).

4. Entrusting method: The contract work does not include materials.

5. Commencement date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 2: Project Price

Project Price (amount in words)

Article 3: Quality Requirements

1. During the construction, if Party A has special construction projects or special quality requirements, both parties shall confirm and sign a supplementary contract for the increased costs.

2. After the construction materials are inspected by Party B, Party B shall be responsible for the construction quality, and shall not change the construction personnel at will.

3. Party B shall fully consider the overall use of the project during the construction process. If other decoration parts need to be modified or redone, Party B shall rework them in time without compensation, and the cost of reworked materials shall be shared equally by both parties.

4. If the construction affects the use or is obviously unsightly, Party B shall rework it in time and bear the cost of reworked materials, and the construction period will remain unchanged.

5. If the construction does not affect the use, but it is slightly unsightly, Party B shall be responsible for the remedy or compensation, and the construction period will remain unchanged.

Article 4: Supply of Materials

1. If the decoration materials provided by Party A do not meet the quality requirements or have different specifications, Party B shall not use them and notify Party A to replace them in time. If it has been used, all losses caused to the project shall be borne by Party B. ..

2. The materials that Party A is responsible for purchasing and supplying shall be supplied to the site on time. Delayed arrival will postpone the construction period. After the materials are accepted by Party B, Party B shall be responsible for keeping them, and Party B shall be responsible for compensating the losses caused by improper keeping.

Article 5: Method of Payment

1. When the construction period is over half (_ _ _ _ _ _ _ _ _ _ _), Party A will pay the project payment for the first time. After the woodworking project is completed, Party A will pay the second project payment. The rest will be settled after Party A completes all interior decoration works. ..

2. Party A's failure to pay on time is a breach of contract, and Party B has the right to stop the construction.

Article 6: Construction Period

1. If the completion is delayed due to Party B's reasons, Party A will pay a fine of 100 yuan per day as liquidated damages until the work expenses are deducted.

2, in the construction, due to engineering quality problems, the two sides disagree and cause work stoppage, which should be punished as delayed work or delayed construction period. Both parties should actively coordinate and deal with the dispute as soon as possible, so as to continue the construction.

Article 7: Other matters

1. Party A's responsibilities: Party A provides the floor plan of the house, supplies materials on time, and makes on-site disclosure to Party B. ..

2. Party B's responsibility: be responsible for the safety, fire prevention, work with certificates and civilized construction on the construction site, and prevent accidents such as pipeline blockage, water leakage, power failure and damage to articles caused by construction from affecting others. If it happens, it must be repaired or compensated as soon as possible.

Article 8: Modification and Termination of the Contract

1. After this contract comes into effect after being signed by both parties, both parties must strictly abide by it. If either party needs to change the contents of the contract, it shall sign a supplementary agreement after both parties reach an agreement through consultation. If it is necessary to terminate the contract, the party who proposes to terminate the contract shall do so in writing and go through the termination procedures.

2. The party that terminates the contract without authorization shall pay 5% of the total contract amount to the other party as liquidated damages. If the actual loss caused to the other party by the unauthorized termination of the contract exceeds the liquidated damages, it shall be compensated.

Article 9: Entry into force of the contract

1. This contract shall come into effect after being sealed or signed by both parties.

This contract is made in duplicate, one for each party.

Party A: Party B:

Signature: signature:

Date of signing: Date of signing:

;