In order to strengthen the fire safety management of construction sites in this city, prevent and reduce the occurrence of fire accidents in construction sites, and ensure personal and property safety, according to the Fire Protection Law of People's Republic of China (PRC), the Regulations on Fire Supervision and Management of Construction Projects (OrderNo. 106 of the Ministry of Public Security), the Regulations on Fire Supervision and Inspection (OrderNo. 107 of the Ministry of Public Security) and the Regulations on Fire Accident Investigation (.
This standard is applicable to the construction units engaged in construction projects within the administrative area of this Municipality, and the fire safety management of the construction site by the construction units during the construction.
The fire safety of the construction site should implement the working principle of "prevention first, combining prevention with fire", and take reliable fire prevention measures according to the characteristics of the construction process to be safe, applicable, economical and reasonable.
The fire safety management of the construction site of the construction project shall not only comply with the provisions of this standard, but also comply with the provisions of the current relevant national and provincial standards.
construction project
According to the interpretation of the provisions of the Fire Protection Law, it refers to housing construction, civil engineering, equipment installation, pipeline laying and other projects.
construction site
A warehouse or yard where various building materials and equipment are stacked on the construction site of a building project; Office, dormitory, canteen, dressing room and other temporary living buildings. On-site personnel at the construction site; Construction operation area and temporary substation (distribution box), acetylene generator room, painting room, carpentry room, electrician room, inflammable and explosive dangerous goods warehouse, etc.
Office living quarters
In the construction site of a construction project, an area where temporary activities such as office, living and accommodation are provided for the construction site staff.
Construction operation area
The activity area of a specific construction operation on the construction site of a construction project.
Warehouse area
The construction site of the construction project is an area where materials, construction tools and inflammable and explosive dangerous goods are stored centrally.
Fire safety responsibilities and obligations
general clause
The construction unit is responsible for the fire safety of the construction site. When concluding a contract, the construction unit and the construction unit shall specify their respective fire safety responsibilities at the construction site.
For the local reconstruction, expansion and decoration of buildings, the construction unit shall specify the fire safety responsibilities of all parties on the construction site in the contract signed with the construction unit.
The general contractor shall be fully responsible for the fire safety responsibility of the construction site where the general contract is implemented. The general contractor shall sign fire safety responsibility letters with subcontractors one by one according to the principle of "whoever constructs shall be responsible", and clarify the fire safety responsibility.
All responsible units in the construction site shall implement fire prevention measures and provide necessary fire safety budget when preparing production plans.
The general contractor shall supervise the fire safety work of the subcontractor's construction site. The subcontractor shall be responsible to the general contractor and obey the general contractor's fire safety management on the construction site.
Subcontractors shall, under the unified management of the general contractor, establish a responsibility system for fire safety on the construction site within the scope of subcontracting, and organize the implementation of fire safety management on the construction site.
Before the construction project starts, the construction unit and the construction unit shall take out fire public liability insurance.
Before the construction project starts, the construction unit and the construction unit shall file the following information for future reference:
1) construction site plan, and indicate the use nature of temporary buildings;
2) List of storage locations, varieties and quantities of inflammable and explosive dangerous goods;
3) List of construction personnel and accommodation personnel;
4) Construction progress plan;
5) Fire safety management organization system and various fire safety systems;
6) Layout of fire fighting equipment and fire extinguishing equipment;
7) Configuration list of fire fighting equipment and other fire fighting facilities;
8) Other materials that need to be filed.
4.2 Fire safety responsibilities of the construction unit
Coordinate the fire safety work in the construction site of the construction project without general contracting.
It is clear that an administrative leader is responsible for the fire safety management of the construction site and supervises the fire safety management of the construction unit.
Supervise the construction unit to rectify the fire hazards existing in the construction site.
Fire safety responsibility of the construction unit
The construction site shall implement the fire safety responsibility system step by step and the post fire safety responsibility system.
For general contracting construction projects, an administrative leader should be defined as the person in charge of fire safety at the construction site, and the fire safety administrator at the construction site should be fully responsible for fire safety at the construction site.
Subcontractors shall set up a person in charge of fire safety at the construction site, who shall be responsible for the fire safety work within the scope of their responsibilities.
According to the scale of the construction project and the fire risk, full-time or part-time firefighters shall be provided to be responsible for daily fire safety inspection and assist the fire safety administrator to do a good job in fire safety at the construction site.
Organize the formulation of fire safety protection scheme and disposal measures on the construction site, study and implement the rectification measures for fire hazards, organize fire safety publicity, education and inspection, and summarize the inspection situation and report it step by step.
According to the scale and fire risk of construction projects, formulate various systems such as fire prevention, use of naked flame, management of inflammable and explosive dangerous goods, use of electrical appliances and management of fire-fighting equipment.
The construction site must establish a corresponding examination and approval system according to the scope, time and danger of using open flames, and strictly perform the examination and approval procedures for using open flames.
Personnel fire safety responsibilities
The person in charge of fire safety on the construction site shall be fully responsible for the fire safety of the construction project.
The construction site shall implement the fire safety responsibility system step by step and the post fire safety responsibility system, clarify the post responsibilities of the fire safety manager and the person responsible for fire safety, implement various fire safety measures, and set up a fire control organization chart at the entrance of the site to clarify the personnel and contact information.
For a construction project that meets the following conditions, the person in charge of fire control safety, the person in charge of fire control safety and the person in charge of fire control safety at the construction site shall report to the local public security fire control institution for the record. If the project is a general contract, the general contractor shall be responsible for reporting:
1) Construction works with a height exceeding 50 m;
2) Public construction projects with a single building area of more than 20,000m2 or commercial and residential construction projects with a shopping mall area of more than10000m2;
3) Industrial workshops such as Class A and Class B workshops, devices and storage tanks with a total investment of more than 50 million yuan (excluding land costs, the same below);
4) Class A and B warehouses with an area greater than 1500m2 and Class C warehouses and logistics centers with an area greater than1200m2;
5) Major municipal projects such as rail transit, tunnels, bridges and docks;
6) Gas stations, filling stations and filling stations;
7) The total project area exceeds 10 hectare;
8) Special projects designed or evaluated according to fire performance;
(nine) other projects issued by the fire control institutions of public security organs for fire control audit opinions of construction projects.
The person responsible for fire safety on the construction site shall perform the following fire safety duties:
1) Implement the fire control laws and regulations, master the fire control safety situation on the construction site, and ensure that the fire control safety on the construction site meets the requirements;
2) Determine the fire safety manager, implement the fire safety responsibility system, and organize the formulation of fire prevention plans in line with the actual situation of this project;
3) While preparing the construction production plan, implement fire prevention measures to provide necessary funds for the fire safety of the project;
4) Organize fire prevention inspection, supervise and urge the implementation of fire hazard rectification, and deal with major issues related to fire safety in time;
5) According to the engineering practice, organize the formulation of fire fighting and emergency evacuation plans and conduct drills.
4.4.5 The fire safety manager at the construction site shall perform the following fire safety duties:
1) According to the characteristics of the project, draw up the fire control scheme of the construction project, formulate the fire control safety system, determine the key fire control parts, and organize the implementation of daily fire control safety management;
2) Be responsible for reviewing the subcontractor's fire fighting qualification, determining the subcontractor's fire safety responsible person, and establishing the subcontractor's obligatory fire brigade;
3) Organize the construction site personnel and subcontracting teams to publicize, educate and train fire fighting knowledge and skills, and organize obligatory fire brigades to conduct fire drills in a planned way;
4) The construction site shall be equipped with fire-fighting facilities and equipment according to relevant regulations, set up fire safety signs and be responsible for maintenance;
5) Carry out daily fire safety inspection; Responsible for the rectification of hidden dangers of fire accidents;
6) Be responsible for the management of open flame operation, strictly implement the three-level hot work system, and check the implementation of preventive measures;
7) Be responsible for the fire prevention management of the subcontracting team;
8) Be responsible for the basic information of fire control, and establish and improve the fire safety files;
9) Other fire safety management work entrusted by the person in charge of fire safety of the project.
4.4.6 The person in charge of fire safety on the construction site shall perform the following fire safety duties:
1) Be responsible for the management of fire safety in the subcontract construction site, and consciously abide by various fire safety regulations in the construction site;
2) Obey the fire safety requirements of the fire safety manager on the construction site, and assist the fire safety manager to do a good job in the fire safety of the subcontracting site;
3) Conduct daily inspection on key fire prevention parts;
4) Conduct regular or irregular fire inspection to check whether there is any violation of the regulations on the use of fire and electricity, whether the fire control facilities, equipment and fire safety signs are in place, complete, effective and smooth, and the knowledge of fire control of special type of work personnel and other personnel.
Fire safety responsibility of engineering supervision unit
Implement project supervision in accordance with the national technical standards for fire protection in engineering construction and the fire protection design documents audited or filed by the fire protection design.
Responsible for the fire protection design and construction quality of construction projects.
Before the construction and installation of fire-fighting products and building components, building materials and interior decoration materials with fire-fighting performance requirements, check the product quality certification documents, and do not agree to use or install unqualified fire-fighting products and building components, building materials and interior decoration materials with fire-fighting performance requirements.
Shall not collude with the construction unit or construction enterprise, resort to deceit, reduce the quality of fire control construction.
Participate in the completion acceptance of the construction project organized by the construction unit, and sign the fire control construction quality of the construction project for confirmation.
5 fire safety in the construction site
general clause
The layout of the construction site should focus on the project under construction, and clearly divide the hot work area, material stacking area, warehouse area, temporary living office area, garbage collection station and other areas.
The distance between the construction site areas shall meet the following requirements:
L) Boiler room, kitchen and other fixed fire working areas should be set 25 meters away from the combustible material storage yard or warehouse of the project under construction.
2 oxygen, acetylene bottles, paint thinner and other inflammable and explosive dangerous goods warehouses should be stored separately, so that one thing can be stored in one warehouse, and they should be set 25 meters away from the construction work area and living and office area.
3. A fire truck passage should be set up on the construction site with a width of not less than 4m to ensure that the fire truck can stop and rescue in case of emergency.
When the building height exceeds 24 meters, the construction unit shall implement the temporary water source, set up a high-rise temporary water supply pipe network and a high-pressure pump with sufficient lift, and add a temporary fire water tank when the fire water source cannot meet the fire fighting needs. The power supply of the fire pump should be set separately.
It is forbidden to use the project under construction as the accommodation for construction and other personnel.
6 Power lines and lighting lines on the construction site must be set separately and equipped with corresponding power safety devices. It is forbidden to pull and connect wires indiscriminately.
7 The construction site should be equipped with night lighting to ensure the construction safety requirements.
8 The construction site shall be equipped with necessary fire-fighting equipment, and each group shall have at least two 8kg fire extinguishers, which shall be set in an eye-catching and easily accessible place.
9 When the waterproof layer is made in the building and the roof of the building on the construction site, corresponding fire-fighting equipment should be equipped and supervised by special personnel.
10 the construction unit shall clean up the flammable and combustible substances such as shavings, sawdust, linoleum, wood and so on generated in the construction process, and it is strictly prohibited to burn them at the construction site. Paint and thinner left over from construction should be stored in a safe place.
1 1 Smoking is prohibited in all parts of the construction site. Smoking areas can be set up in every area except the warehouse area, and cigarette butts should be thrown into the ashtray with water.
12 obvious fire safety signs should be set up in the office and living area, construction work area, warehouse area and other parts with fire danger.
Fire safety in offices and living quarters
1 Rooms using open flames such as kitchens in the living quarters of the construction site shall not be mixed with office and accommodation. Non-combustible materials or flame retardant materials with a fire resistance limit of not less than 2h should be adopted, and they should be built independently in a safe place, with no more than 2 floors, and special personnel should be responsible for the use of fire, electricity and gas.
2 The fire resistance rating of temporary office buildings and dormitories shall not be lower than Grade III, and shall not exceed 2 floors. It is forbidden to build wooden houses.
No office space or temporary residence shall be built in the project under construction. If it is really difficult, the office space and temporary accommodation space set up in the project under construction shall be effectively separated from the construction work area by fire prevention, with safe evacuation passages and fire-fighting facilities such as emergency lighting.
4 It is forbidden to build temporary buildings and pile up inflammable and explosive articles under high-voltage power overhead lines.
5.2.5 The fire safety distance between temporary buildings and existing buildings shall meet the requirements of current fire protection codes. Temporary buildings arranged in groups shall not exceed 10 buildings in each group, and the fire prevention distance between groups shall not be less than 10 meters.
5.2.6 When the building area of the dormitory room in the temporary building is more than 50 square meters and the number of people is more than 20, two safe people should be set up; The windows of the temporary dormitory shall not be blocked with hard objects.
5.2.7 The temporary dormitory is located in the room between two stairs, and the distance from the door to the evacuation stairs should not exceed 25m;; For rooms located on both sides or at the end of the bag-shaped walkway, the distance from the door to the nearest evacuation staircase should not exceed 12m.
5.2.8 Temporary dormitories shall ensure standardized electricity consumption, and high-power electrical appliances or wires shall not be used. Every dormitory should take certain safety measures to limit current.
5.2.9 The offices and dormitories in the temporary living quarters shall be equipped with two fire extinguishers with a fire extinguishing level of not less than 3A per 100 m2.
5.3 Fire safety in construction work area
5.3. 1 The "three-level" hot work approval system and the "one point, one certificate and one supervision" hot work measures shall be implemented in the active operation area of the construction site.
5.3.2 Before using an open flame, the operator shall remove the combustible materials around the open flame point, implement the monitoring personnel and monitoring measures, and configure the necessary fire-fighting equipment.
5.3.3 Before the main structure of a high-rise building is welded and cut by fire, a water supply system should be installed on the fire operation floor to ensure normal water inflow.
5.3.4 In any of the following circumstances, naked flame is strictly prohibited:
1) The on-site operator has no operation certificate;
(two) the use of open fire within the scope of examination and approval does not perform the examination and approval procedures;
3) The operator does not know the surrounding conditions of the open flame operation site;
4) Where combustible materials are used for heat preservation, cooling, sound insulation and heat insulation, and where sparks may splash, no effective safety measures are taken;
5) Flammable and explosive dangerous goods are piled up near the job site, which are not thoroughly cleaned or effective safety measures are not taken;
6) There is an explosive mixture of combustible gas, combustible liquid vapor and air at the job site;
7) In cross-construction operations, the use of open flames poses a threat to the safety of other construction equipment and personnel;
8) Scattering Mars endangers the safety of adjacent or adjacent buildings (structures);
9) There are pressure or closed pipes and containers, and the on-site operators don't know whether the inside of the weldment is safe;
10) It is forbidden to use naked light according to relevant regulations.
5.3.5 Electric (gas) welding and cutting operation points should be far away from inflammable, explosive and combustible goods. Fire prevention measures should be implemented around and below the welding and cutting points, and special personnel should be appointed for on-site monitoring.
5.3.6 Acetylene generator and oxygen cylinder shall meet the following requirements in storage and use:
1) Don't share a car or a library. Gas cylinders should have shock-absorbing rings and protective caps. When it is used, it should be equipped with intact instruments and trachea. When stored or used, they are not allowed to lie flat.
2) The storage time interval is not less than 2m, the service time interval is not less than 5m, and the distance from naked flame is not less than 10m.
5.3.7 The construction site where organic solvents and other materials are used and combustible gas is generated should be well ventilated. The construction site with poor natural ventilation conditions should be equipped with mechanical ventilation equipment before construction.
5.3.8 The woodworking workshop on the construction site must be set up according to regulations, and it is forbidden to store cutting machines in the woodworking room.
5.3.9 The erection of temporary lines on the construction site and the installation and maintenance of electrical equipment must be carried out by electricians and conform to the safety technical specifications.
5.3. 10 temporary wires are not allowed to be connected privately in the construction site, bare wires are not allowed to be erected, conductive materials are not allowed to be directly tied to metal supports, and copper wires or other metal materials are not allowed to replace fuses.
5.3. 1 1 For the high-power pickaxe lamp (solar lamp) used in the construction site, the rectifier must be equipped with a protective cover, and the installation position is safe and reliable, so as to avoid direct contact with flammable items. It is forbidden to bake clothes and keep warm with lights.
5.3. 12 Electric furnaces, kerosene stoves and rapid heating are prohibited in the construction site. Strictly control the non-production use of electric heaters.
5.3. 13 The construction site shall ensure the smooth passage of fire engines, set obvious fire signs at key fire prevention parts, and implement strict management.
5.3. 14 During the commercial interior decoration of large public buildings, professional safety officers should be set up for patrol management and closed management, the decoration floor and some pipeline wells should be closed with non-combustible materials, and special safety evacuation passages should be set up.
5.3. 15 The fire-retardant safety net must be used in the construction site.
5.3. The construction of16 external thermal insulation system shall meet the following requirements:
1) After the thermal insulation material enters the site, it should be far away from the fire source. When stored in the open air, it should be completely covered with incombustible materials.
2) For external thermal insulation materials with fire prevention measures, the construction of fire isolation belt should be carried out simultaneously with the construction of thermal insulation materials.
3) The construction of combustible, flame-retardant and heat-insulating materials should be carried out in sections, and each section should keep enough fire-proof spacing. When fixing the heat-insulating materials, protective layers should be applied. The height of external thermal insulation material without protective coating should not exceed 3 layers.
4) The supporting members of curtain wall and air conditioning facilities shall be welded before laying thermal insulation materials. If it really needs to be done after laying thermal insulation materials, fire prevention measures such as fire blankets should be laid around and at the bottom of the welding parts.
5) Hot-melt and hot-bonding construction of waterproof materials shall not be directly carried out on combustible thermal insulation materials.
6) Reliable fire prevention measures should be taken when high-temperature equipment such as lighting for construction is close to combustible thermal insulation materials.
7) When polyurethane and other thermal insulation materials are foamed on site, high temperature environment should be avoided. Anti-static measures should be taken for construction technology, tools and clothing.
8) Temporary indoor and outdoor fire hydrant systems shall be set up on the construction site to meet the requirements of fire fighting and water supply on the construction site.
9) The construction workstation of external thermal insulation project shall be equipped with sufficient fire-fighting equipment.
5.3. 17 The daily use of the external thermal insulation system of the building shall meet the following requirements:
1) axis, groove, platform, etc. Combustible materials shall not be piled up adjacent to external walls and roofs.
2) Fire hazards such as fire source and heat source should keep a safe distance from the external wall and roof, and strengthen the management of fire source and heat source.
3) It is not suitable for welding, drilling and other construction operations on walls and roofs with external thermal insulation materials. If construction work is really necessary, reliable fire prevention measures should be taken, and the exposed external thermal insulation materials should be protected in time after the construction is completed.
4) Electrical lines should not pass through combustible external thermal insulation materials. When crossing is really necessary, fire control measures such as pipeline crossing should be taken.
5.4 Fire safety in warehouse area
5.4. 1 It is forbidden to set up inflammable and explosive dangerous goods warehouses and use liquefied petroleum gas in projects under construction.
5.4.2 In the construction site where a large number of flammable and explosive gases or liquids are used, a safe and suitable place should be selected to set up a warehouse for flammable and explosive dangerous goods.
5.4.3 A small amount of inflammable and explosive dangerous goods with storage capacity not exceeding 65,438+000 kg required for construction can be located above the ground of the project under construction, but separation measures should be taken to separate them from other parts through fire prevention, and obvious signs and signs prohibiting open flames should be set up.
5.4.4 Flammable and explosive dangerous goods warehouse, combustible material storage yard, waste collection station and construction work area should have obvious no-smoking signs.
5.4.5 Temporary paint room, inflammable and explosive dangerous goods warehouse, etc. Every 30m2 should be equipped with two fire extinguishers with a fire extinguishing level of not less than 4B.
6 fire hazard rectification
6. 1 General provisions
6. 1. 1 Fire hazards existing in the construction site shall be eliminated in time. The person responsible for fire safety is the first person responsible for the rectification of fire hazards, providing resources such as personnel, venues and funds. The fire safety manager is responsible for organizing personnel and implementing corrective measures for fire hazards. After the rectification is completed, the department or personnel responsible for rectification shall report to the person in charge of fire safety step by step. If an individual or department fails to rectify the fire hazard in time, the construction unit shall punish the responsible person according to the relevant reward and punishment measures.
6. 1.2 If it is ordered by the fire department of the public security organ to correct or stop the construction and use, it shall report to the fire department of the public security organ after the rectification, and the construction and use can be resumed only after the fire department of the public security organ has passed the inspection.
6. 1.3 During the rectification of fire hazards, measures shall be taken to ensure fire safety and prevent fire.
6.2 rectification measures
6.2. 1 When the following fire hazards are found, the person in charge of fire control shall instruct relevant personnel to immediately rectify and make records:
1) Illegal use and storage of inflammable and explosive articles;
2) illegal use of high-power electric heating appliances with fire danger;
3) Smoking, throwing cigarette butts and fire sources at the construction site in violation of regulations;
4) Illegal use of naked flame and electric (gas) welding;
5) Failing to operate according to the safety operation procedures in the construction process;
6) Occupy the fire safety passage.
6.2.2 For fire hazards that cannot be rectified immediately, a rectification plan shall be made, and the rectification measures, time limit and personnel shall be defined, and reported to the superior competent department. For hidden dangers or major fire hazards that may cause fire at any time, the dangerous parts should be stopped immediately for rectification, and safety precautions should be implemented during rectification.
6.3 Fire Prevention
After the rectification of fire hazards is completed, the department or personnel responsible for rectification shall formulate corresponding preventive measures according to the causes of fire hazards and submit them to the fire safety manager to prevent similar hazards from happening again.
7. Fire prevention publicity, education and training
7. 1 General provisions
7. 1. 1 The person in charge of fire control, fire safety and fire safety on the construction site must hold relevant certificates.
7. 1.2 The construction site can carry out regular fire safety publicity and education according to local conditions by posting pictures, fire propaganda boards, setting fire corners and fire columns, and make records.
7. 1.3 The construction site shall provide fire safety training for workers in key fire prevention positions before taking up their posts.
7. 1.4 The requirements of different levels and posts should be considered in the procedures and contents of fire fighting training.
7.2 Training content
7.2. 1 The fire safety training on the construction site shall include the following contents:
1) Relevant fire laws and regulations, fire safety management system and operating procedures for ensuring fire safety;
2) Fire risk, key fire prevention parts and protective measures in this place;
3) The performance of basic fire-fighting facilities (fire pumps) and the use of fire-fighting equipment;
4) Knowledge and skills of reporting fire, fighting initial fire and self-help and escape;
5) Be familiar with the fire control scheme of this site.
7.2.2 Construction site training scope:
1) fire safety supervisor, fire safety manager and fire safety supervisor;
2) personnel in key positions of on-site fire prevention;
3) Engineering maintenance personnel of fire control facilities;
4) Special type of work post personnel.
8 fire fighting and emergency plan
8. 1 General provisions
8. 1. 1 The construction site shall formulate fire fighting and emergency evacuation plans, and conduct drills regularly to reduce fire hazards.
8. 1.2 The fire fighting and evacuation plan shall include the organization, alarm and alarm handling procedures, emergency evacuation procedures and measures, procedures and measures for fighting the initial fire, communication, safety protection and rescue.
8. 1.3 Conduct drills at least once every six months, and constantly improve the plan according to the actual situation.
8. 1.4 notify all personnel on the construction site before the drill to prevent accidental confusion; At the end of the drill, the problems should be summarized and recorded, and the contents of the plan should be revised according to the existing problems.
8.2 Specific content
8.2. 1 Fire fighting and emergency evacuation organizations shall include the following organizations:
1) commander: direct fire fighting and emergency evacuation before the arrival of the public security fire brigade;
2) Fire fighting action group: according to the requirements of the plan, arrive at the scene to put out the fire in time;
3) Communication liaison group: report the fire, greet the fire-fighting vehicles, contact relevant departments and convey the commander's orders;
4) evacuation guidance group: maintain fire control order and guide workers to evacuate;
5) Safety protection and rescue team: rescue the injured and prepare necessary medical supplies;
6) Other necessary organizations.
8.2.2 Alarm key points and alarm handling procedures: If a fire is found, notify the nearby staff to evacuate and report to "119" immediately; At the same time, report to the fire safety supervisors at all levels on site.
8.2.3 Organizational procedures and key points of emergency evacuation measures: rapid and orderly evacuation from evacuation stairs: try not to use elevators for evacuation.
8.2.4 Key points of procedures and measures for extinguishing the initial fire: The fire commander should organize personnel to use fire-fighting equipment to extinguish the fire quickly according to the spread range of the fire, and use nearby water sources to assist firefighters in the fire fighting work.
8.2.5 Key points of procedures and measures for communication and safety protection: Ensure smooth communication according to the predetermined communication mode. Prepare necessary medical supplies, carry out necessary rescue, and promptly notify medical staff to rescue the wounded.
8.2.6 Key points of aftermath procedure: After the fire is put out, look for people who may be trapped, protect the fire scene, and cooperate with public security fire control institutions to carry out investigations.
9 fire accident treatment
9.0. 1 When a fire breaks out at the construction site, the construction unit or the construction unit shall immediately report to the fire control institution of the public security organ, and timely organize the evacuation personnel to rescue materials and put out the fire according to the fire fighting and evacuation plan.
9.0.2 The construction unit and the construction unit shall provide convenient conditions for rescue workers and fire fighting according to the requirements of public security fire control institutions.
9.0.3 After the fire is put out, it shall protect the scene, accept the accident investigation, truthfully provide relevant information about the fire, and assist the fire control institution of the public security organ to verify the fire loss and find out the cause of the fire.
9.0.4 Without the consent of the fire department of the public security organ, the fire scene shall not be cleaned without authorization.
9.0.5 After the fire broke out, the factors causing the accident should be comprehensively analyzed, and the rectification countermeasures should be studied and formulated. Those responsible should be traced and handled, and all workers should be educated.
10 legal liability
10.0. 1 If the fire department of the public security organ orders it to make corrections, the relevant units shall make corrections immediately.
10.0.2 if the fire department of the public security organ orders it to make corrections within a time limit, stop construction or use, it shall report the rectification to the fire department of the public security organ in writing after the rectification, and the rectification shall be stamped with the official seal of the unit and signed by the person in charge of fire safety.
10.0.3 in violation of this standard, the fire department of the public security organ and the administrative department of construction shall be punished according to law.
- Related articles
- What is the music chart of Aauto faster on 20 19?
- How to adjust the blur of Huawei p30 camera
- Recommendation of Xiaohegou scenic spots where you can play with water in Chongqing
- Complete collection of tourist attractions in Dongyang
- How did the color photos of the late Qing Dynasty come from? Is this a stupid way for photographers to win the market?
- What are the eight scenic spots in Tsinghua University?
- Classic books: Making old books into 3D works of art, her amazing works are amazing.
- Are there any interesting tourist attractions nearby?
- Which camera has better color matching, log2 or log3?
- Youxiake’s products and services