Traditional Culture Encyclopedia - Photography major - How to check the house when the blank house is closed?

How to check the house when the blank house is closed?

1. For the inspection of rough houses, first of all, the documents, regulations and all rules and regulations in the purchase contract must be carefully checked, and the indoor and public supporting equipment must be inspected, and the practices must be completely consistent with the contract. This is the complete realization of the developer's commitment.

2. The net area of the house needs to be measured, and the measurement of the net area needs to be carried out by a special house inspector. After home inspector carries out the measurement, a measurement statement will be issued, and this result can be used as the basis for negotiation with the developer.

3. Check whether there are hollows and cracks inside and outside. If there is a crack, we should see where it is now. If there is a serious crack at the top of the beam, it should be recorded. Any problems found during the house inspection must be recorded with photos.

4. The owner of all indoor door and window devices must also carefully check whether the doors and windows are fully engaged with the door frame and whether the door and window handle devices are firm.

5. Check whether the kitchen and bathroom are saturated. Toilets and kitchens are places that use more water. First, turn on the faucets in the bathroom and kitchen and turn them to the maximum. Look at the water pressure effect. If there is about two centimeters of water, turn off the tap and wait for 24 hours to see if there is any water seepage.

6, and then check the circuit, check all the indoor wires, check whether there is a dummy line, open the master brake to see if all the indoor power supply has electricity.

What should we pay attention to when closing a blank house?

1. At the beginning of repossession, the developer is first required to prepare "two books and one table". Without these three things, the owner may refuse to repossess the building and may hold the developer liable for breach of contract for delaying the delivery of the house.

2. The developer should also show the measured area table. The error between the measured area and the temporarily measured area during pre-sale is within 3%, which is a useful error. According to the house price in the purchase contract, it is necessary to refund more and make up less. If there is an error between the actual area and the purchase contract, the owner can ask the developer to provide the measured table of the housing area to protect the increased rights and interests. If it cannot be provided, the owner has the right to refuse to accept the house.

3. Nowadays, many people pay the public maintenance fund when they repossess their buildings. It should be noted that the developer has no right to collect this fee, which is handled by the government department on the spot and entrusted to the bank for collection.

4. The real estate license can be handled by yourself or by the developer.

5. After the house inspection, the parts of the house with quality problems that need to be repaired should be clearly filled in the house inspection form according to the specific location/area/latest solution time, and signed by both the property and the owner for confirmation, in duplicate.