Traditional Culture Encyclopedia - Photography major - How to write "Safety construction measures for construction projects of the construction unit" required for applying for a construction permit?
How to write "Safety construction measures for construction projects of the construction unit" required for applying for a construction permit?
I. Overview of the Project
Second, each unit engineering safety construction responsibility
Three, engineering safety construction measures and the construction unit project management system
Four, civilized construction and construction safety information and file management in the industry
I. Overview of the Project:
1, project name:
2, the construction unit:
3, the construction unit:
4. Design unit:
5. Construction scale: 20 million yuan.
6. Building area:10212.74m.
7. Number of floors: Total height of six floors: 22.5m.
8. Duration: 180 calendar days.
9. Building grade: the reasonable service life of the main structure is 50 years.
10. Classification of building fire protection: Class II multi-storey building.
1 1. Superstructure system: seismic fortification intensity: 7.5 degrees, and safety level is Grade II. The waterproof grade of the roof is Grade III, with frame structure.
12. Construction site: No.600, Science and Technology Road, jimei district, Xiamen.
Second, each unit engineering safety construction responsibility
In order to strengthen the supervision and management of construction safety production and ensure personal and property safety, this safety construction measure is formulated according to the provisions of People's Republic of China (PRC) Construction Law, People's Republic of China (PRC) Safety Production Law, Regulations on Construction Safety Production Management, Xiamen Building Regulations and other laws and regulations, combined with the actual situation of this project. All construction activities in this project and units and individuals related to this project must abide by this safety construction measure. Engineering construction shall abide by the provisions of laws, regulations and rules, and shall not harm public interests or the legitimate rights and interests of others. Safety production management of construction projects must adhere to the policy of safety first and prevention first, adhere to the principle that safety production must be managed and whoever is in charge is responsible, and establish and improve the responsibility system for safety production and the system of prevention and treatment by groups.
The construction unit of this project is responsible for the supervision and management of construction safety production of this project. At the same time, Xiamen Hedao Supervision Consulting Co., Ltd. was entrusted to implement the supervision and management of construction safety in construction projects. Any unit or individual has the right to stop and report violations of laws, regulations, rules and standards for the administration of production safety in construction projects. Safety warning signs should be set up around the land used in the project construction site according to regulations, and isolation measures should be taken in the dangerous places of the project. Temporary facilities, materials and equipment on the construction site of this project shall not occupy underground municipal pipelines.
Chapter I Responsibilities of Construction Safety Management of Construction Units
(a) the construction unit must carry out the project construction procedures, and shall not put forward requirements that do not conform to the laws, regulations and mandatory standards of construction project safety production to the survey, design, construction, project supervision and other units, set a reasonable construction period, and shall not shorten the construction period agreed in the contract.
(2) The contractor shall provide technical measures for safe production and civilized construction of the construction project according to relevant regulations.
(3) Before construction, it is necessary to provide relevant underground pipeline information and relevant safety protection conditions to the construction unit, and organize the survey, design, supervision and construction unit to carry out safety technical disclosure of survey and design documents.
(4) If the construction unit contracts the project separately or designates a professional subcontracting project, and the subcontracting unit disobeys the safety management of the general contractor, and a safety accident occurs, the subcontracting unit shall bear the main responsibility.
(5) The construction unit shall provide the construction unit with underground pipeline information such as water supply, drainage, power supply, gas supply, heating communication, radio and television, meteorological and hydrological observation data, and relevant information of adjacent buildings, structures and underground projects, and ensure the truthfulness, accuracy and completeness of the information.
(6) The construction unit shall not interfere with the normal construction activities of the construction unit, and shall not explicitly or implicitly purchase, lease or use safety protection appliances, machinery and equipment, construction machines and accessories, fire control facilities and equipment that do not meet the requirements of safe construction. And shall not force the construction unit to purchase or use building materials and safety protection articles that do not meet the technical standards.
(7) The construction unit has demolished the buildings and structures where the project is located, removed the wastes, and provided the construction unit with a construction site with three links and one leveling.
Chapter II Construction Safety Management Responsibilities of Supervision Units
(a) Before construction, the chief supervision engineer is responsible for reviewing the construction organization design and coordinating the connection between the construction organization design and the construction safety technical measures of contractors and subcontractors; Be responsible for reviewing the construction safety conditions of construction projects.
(2) Timely coordinate the construction safety issues involved in the construction handover process or crossover operation between the general contractor and the subcontractor.
(3) Supervisors should strengthen the daily safety inspection and patrol on the construction site, urge the construction unit to implement the responsibility for production safety, find hidden dangers of safety accidents and violations of construction safety technical standards or safety operation procedures, and stop and correct them in time.
Chapter III Safety Management Responsibility of Construction Units
(1) The construction unit is responsible for the safety of the construction site. The general contractor is responsible for the construction of this project, and the subcontractors are responsible for the general contractor and obey the general contractor's management of safety production on the construction site. The general contractor shall complete the construction of the main structure of the building project by itself. If the general contractor subcontracts the construction project to other units according to law, it shall stipulate their respective rights and obligations in safety production in the subcontract. The general contractor and subcontractors shall bear joint and several responsibilities for the safety production of subcontracted projects. Subcontractors should obey the safety production management of the general contractor. Subcontractors do not obey the management, resulting in production safety accidents, the subcontractors shall bear the main responsibility.
(II) The construction unit shall establish and improve the responsibility system for production safety and the education and training system for production safety, formulate rules and regulations for production safety and operating procedures, ensure the capital investment required for the conditions of production safety of the unit, conduct regular and special production safety inspections on the construction projects undertaken, and make safety inspection records. Conduct regular and special safety inspections on the undertaken construction projects to guide the work; The project manager shall be a person with corresponding professional qualifications, who shall be specifically responsible for the construction safety of the construction project, be responsible for the safe construction of the construction project, implement the responsibility system for production safety, rules and regulations for production safety and operating procedures, ensure the effective use of production safety expenses, organize the formulation of safety construction measures according to the characteristics of the project, eliminate hidden dangers of safety accidents, and report production safety accidents in a timely and truthful manner.
(3) When compiling the construction organization design, the construction unit shall formulate and implement special technical measures for construction safety according to the nature, scale and characteristics of the construction project and the environmental conditions of the construction site, and make safety technical disclosure to all construction managers and operators. The construction unit shall hold at least one safety work meeting, and the project manager or the legal representative of the enterprise and its entrusted * * * person-in-charge shall call the relevant personnel of the project to attend, analyze the safety production situation of this project, and determine the implementation of various safety precautions. At the same time, the work conference on production safety shall form a written summary.
(4) The construction unit shall take special protective measures for the adjacent buildings, structures and underground pipelines that may be damaged due to the construction project. If the construction site conditions do not meet the relevant safety technical standards or do not meet the safety conditions required for construction, construction shall not be started.
(5) Before the start of construction, the construction unit shall, according to the nature, scale and characteristics of the construction project, set up a safety production management organization, equipped with full-time safety production management personnel, and the allocation method of full-time safety production management personnel shall conform to the provisions formulated by the construction administrative department of the State Council in conjunction with the relevant departments of the State Council. Full-time safety production management personnel shall specify the specific responsibilities of construction safety management and be responsible for on-site supervision and inspection of safety production. If hidden dangers of safety accidents are found, it shall report to the project leader and the safety production management institution in a timely manner; Illegal command and operation should be stopped immediately.
(6) Before the construction of a building project, the project management technicians of the construction unit shall explain the technical requirements for safe construction to the construction team and operators in detail, and both parties shall sign for confirmation. During the construction, the construction unit shall, according to the construction organization design and construction progress, make special safety technical disclosure to the operators of various types of work.
(seven) the construction unit shall establish and improve the daily safety education, technical training and assessment system for construction management personnel and operators, and seriously organize their implementation; The construction unit shall not arrange construction management personnel and operators who have not received safety education and technical training or passed the examination to work at their posts. The construction unit shall conduct safety education and training for managers and operators at least once a year, and record the education and training in personal work files. Personnel who fail to pass the safety production education and training examination shall not take up their posts. Before entering a new post or a new construction site, operators shall receive education and training in production safety. Without education and training or education and training examination unqualified personnel shall not work at their posts. When adopting new technologies, new processes, new equipment and new materials, the construction unit shall conduct corresponding safety education and training for the operators. The construction unit shall handle accidental injury insurance for personnel engaged in dangerous operations at the construction site.
(8) Operators of vertical transport machinery, installers and dismantlers, blasters, signal workers, climbers and other special operators must participate in professional training in accordance with the relevant provisions of the state, and hold relevant certificates after passing the examination; The construction unit shall not arrange personnel who have not obtained relevant certificates for special types of work to engage in special types of work.
(nine) the construction unit shall, in accordance with the relevant national standards, industry standards or local standards, set up safety protection facilities at the construction site, and meet the following requirements:
1, adjust and improve safety protection facilities in time according to different construction stages and progress of construction projects;
2. The construction unit shall set up obvious safety warning signs at the entrances and exits of the construction site, construction hoisting machinery, temporary electricity facilities, scaffolding, access points, stairs, elevator wellheads, holes, foundation pit edges, storage places for explosives and dangerous gases and liquids, and accident-prone areas of the construction site. Safety warning signs must meet national standards;
3. The construction unit shall take corresponding safety construction measures at the construction site according to the actual situation and the changes of surrounding environment, season and climate. Set up or adjust special safety protection facilities and conduct relevant safety inspections;
(10) The installation, use and disassembly of construction machinery and electrical equipment by the construction unit shall meet the following requirements:
1. Before installation, it shall be tested according to the specified safety technical standards, and it can be installed only after it is qualified;
2, before use, should be in accordance with the provisions of the safety technical standards for safety performance testing, qualified rear can use;
3, during use, should designate a person responsible for maintenance, maintenance, to ensure its safe use.
4. Installation and disassembly must be carried out in accordance with the provisions of the original factory, and safety operation measures shall be formulated, which shall be carried out by a professional team under the unified guidance of professional and technical personnel, and supervised by relevant technical and safety personnel.
(1 1) The construction unit shall prepare a special construction plan for dangerous sub-projects with a certain scale, such as temporary electricity consumption on the construction site, and attach the safety inspection results, which shall be implemented after being signed by the technical director of the construction unit and the chief supervision engineer, and supervised by full-time safety production management personnel on site. The installation and use of temporary power lines and facilities on the construction site of construction projects must conform to relevant technical standards, norms and safe operation procedures, and keep the power distribution facilities and lines in a safe and reliable state.
(twelve) hot work on the construction site should comply with the technical standards and norms of fire control. The construction unit shall establish a responsibility system for fire control safety on the construction site, determine the person responsible for fire control safety, formulate various fire control safety management systems and operating procedures such as fire, electricity, inflammable and explosive materials, set fire exits and fire water sources, equip with fire control facilities and fire fighting equipment, and set up obvious signs at the entrance of the construction site. The construction unit and supervision unit shall inspect and urge the construction unit to establish a fire safety system on the construction site and set up fire safety facilities according to the regulations.
(13) The construction unit shall promptly provide the construction management personnel and operators with safety protection articles and safety protection clothing necessary for construction safety, as well as labor protection articles that meet the prescribed standards, and inform them in writing of the operating procedures of dangerous posts and the hazards of illegal operations.
(14) The expenses for the safe working environment and safety construction measures included in the budgetary estimate of the construction project by the construction unit shall be used for the implementation of construction safety measures and the improvement of safety production conditions, and shall not be used for other purposes.
(15) The construction unit shall provide all kinds of living facilities at the construction site for employees, which shall meet the requirements of relevant state regulations. Temporary buildings on the construction site shall meet the requirements for safe use. Precast mobile homes used in the construction site should have product certificates. The construction unit shall separate the office area, living area and working area of the construction site and keep a safe distance; The locations of offices and living quarters shall meet the safety requirements. Workers' meals, drinking water, rest places, etc. Should meet the hygiene standards to prevent food poisoning and various epidemics. The construction unit shall not set up staff dormitory in the unfinished building. At the same time, the construction unit should do a good job of supervision and inspection.
(16) The construction unit shall have on-site safety, hygiene and medical first-aid measures at the construction site of this construction project, and be equipped with first-aid supplies.
(17) The safety management personnel of the construction unit and the person in charge of construction safety management shall strengthen the daily safety inspection and patrol on the construction site, urge the construction personnel to abide by the relevant safety regulations, and promptly stop and correct the hidden dangers of construction safety and the behaviors that violate the technical standards of construction safety or safety operation procedures.
(eighteen) the construction unit shall abide by the provisions of relevant laws and regulations on environmental protection and take measures at the construction site to prevent or reduce the harm and pollution of dust, waste gas, waste water, solid waste, noise, vibration and construction lighting to people and the environment. During the construction of this project, the construction unit shall set up safety warning signs around the construction site according to regulations, and take isolation measures in dangerous places of the project.
(nineteen) the safety protection appliances, machinery and equipment, construction machinery and accessories purchased and leased by the construction unit shall have the production (manufacturing) license and product certificate, and shall be inspected before entering the construction site. Safety protection articles on the construction site. Mechanical equipment, construction tools and accessories must be managed by special personnel, regularly inspected, maintained and maintained, corresponding data files should be established, and scrapped in time according to relevant state regulations.
(twenty) before the use of construction machinery and facilities, the construction unit shall organize relevant units for acceptance, and may also entrust inspection and testing institutions with corresponding qualifications for acceptance; The use of leased machinery and equipment, construction machines and accessories shall be accepted by the general contractor, subcontractors, leasing units and installation units. Only those who have passed the acceptance can use it. Construction hoisting machinery specified in the Regulations on Safety Supervision of Special Equipment shall be supervised and inspected by qualified inspection and testing institutions before acceptance. The construction unit shall, within 30 days from the date of acceptance of the construction machinery erection facilities, register with the construction administrative department or other relevant departments for the record. The registration mark should be placed or attached to the equipment in a prominent position.
Chapter IV Construction Safety Measures and Project Management System of Construction Units
1. A construction unit engaged in the new construction, expansion, reconstruction and demolition of a building project shall have the registered capital, professional technicians, technical equipment and safe production conditions stipulated by the state, obtain the qualification certificate of the corresponding level according to law, and undertake the project within the scope permitted by its qualification level.
2. The main person in charge of the construction unit shall be fully responsible for the safety production of the unit according to law. The construction unit shall establish and improve the safety production responsibility system and the safety production education and training system, formulate safety production rules and regulations and operating procedures, ensure the capital investment required for the safety production conditions of the unit, conduct regular and special safety inspections on the construction projects undertaken, and make safety inspection records. The person in charge of the project of the construction unit shall be a person with corresponding professional qualifications, responsible for the safe construction of the construction project, implementing the responsibility system for production safety, rules and regulations for production safety and operating procedures, ensuring the effective use of production safety expenses, organizing the formulation of safety construction measures according to the characteristics of the project, eliminating hidden dangers of safety accidents, and reporting production accidents in a timely and truthful manner.
3. The expenses for the safe working environment and safety construction measures included in the budgetary estimate of the construction project by the construction unit shall be used for the procurement and updating of construction safety protection appliances and facilities, the implementation of safety construction measures and the improvement of safety production conditions, and shall not be used for other purposes.
4, the construction unit should set up a safety management organization, equipped with full-time safety management personnel. Full-time safety production management personnel are responsible for on-site supervision and inspection of safety production. If hidden dangers of safety accidents are found, it shall report to the project leader and the safety production management institution in a timely manner; Should immediately stop illegal command and operation.
The measures for the allocation of full-time safety production management personnel shall be formulated by the administrative department of construction of the State Council in conjunction with other relevant departments of the State Council.
5, the construction project construction general contracting, the general contractor is responsible for the safety in production on the construction site.
6. Operators of vertical transport machinery, installers and dismantlers, blasters, signal workers, climbers and other special operators must receive special safety operation training in accordance with the relevant provisions of the state and obtain special operation qualification certificates before they can work at their posts.
7, the construction unit should be in the construction organization design of safety technical measures and construction site temporary electricity scheme, for the following to a certain scale and greater risk of partial project preparation of special construction scheme, and attach the safety inspection results, signed by the construction unit technical director, chief supervision engineer, by full-time safety production management personnel for on-site supervision.
8. Before the construction of a building project, the technical personnel in charge of project management of the construction unit shall explain in detail the technical requirements for safe construction to the construction team and operators, and both parties shall sign for confirmation.
9. The construction unit shall set up obvious safety warning signs at the entrance of the construction site, construction hoisting machinery, temporary electricity facilities, scaffolding, openings, holes, bridge opening, tunnel openings, foundation pit edges, storage places for explosives, dangerous gases and liquids, etc. Safety warning signs must meet the national air standards.
The construction unit shall take corresponding safety construction measures at the construction site according to the changes of different construction stages, surrounding environment, seasons and climate. If the construction site temporarily stops construction, the construction unit shall do a good job in site protection, and the expenses required shall be borne by the responsible party or executed in accordance with the contract.
10, the construction unit shall separate the office area, living area and working area of the construction site, and keep a safe distance; The locations of offices and living quarters shall meet the safety requirements. Workers' meals, drinking water, rest places, etc. Should meet the hygiene standards. The construction unit shall not set up staff dormitory in the unfinished building. Temporary buildings on the construction site shall meet the requirements for safe use. Precast mobile homes used in the construction site should have product certificates.
1 1. The construction unit shall take special protective measures for adjacent buildings, structures and underground pipelines that may be damaged due to construction projects.
12, the construction unit shall abide by the provisions of relevant environmental protection laws and regulations, and take measures at the construction site to prevent or reduce the harm and pollution of dust, waste gas, waste water, solid waste, noise, vibration and construction lighting to people and the environment.
13. For construction projects in urban areas, the construction unit shall implement a closed enclosure for the construction site.
14, the construction unit shall establish a responsibility system for fire control safety in the construction site, determine the person responsible for fire control safety, formulate various fire control safety management systems and operating procedures such as fire, electricity, inflammable and explosive materials, set up fire exits, fire water sources, equipped with fire control facilities and fire extinguishing equipment, and set up obvious signs at the entrance to the construction site.
15. The construction unit shall provide safety protective articles and safety protective clothing to the operators, and inform them in writing of the operation procedures of dangerous posts and the hazards of illegal operations.
16. Operators have the right to criticize, report and accuse the safety problems existing in the working conditions, procedures and methods on the construction site, and have the right to refuse illegal command and force risky operations.
17. When there is an emergency that endangers personal safety during the construction, the operators have the right to stop the operation immediately or evacuate the dangerous area after taking necessary emergency measures.
18. Operators shall abide by the mandatory standards, rules and regulations and operating procedures for safe construction, and use safety protection appliances and mechanical equipment correctly.
19. The safety protection appliances, mechanical equipment, construction machinery and accessories purchased and leased by the construction unit shall have production (manufacturing) licenses and product certificates, and shall be inspected before entering the construction site.
20. Safety protection appliances, machinery and equipment, construction machinery and accessories on the construction site must be managed by special personnel, regularly inspected, repaired and maintained, and corresponding data files shall be established, and scrapped in time in accordance with relevant state regulations.
2 1. Before the jack-up erection facilities such as construction hoisting machinery, integral lifting scaffolding and formwork are used, the construction unit shall organize relevant units for acceptance, or entrust inspection and testing institutions with corresponding qualifications for acceptance; The use of leased machinery and equipment, construction machines and accessories shall be accepted by the general contractor, subcontractors, leasing units and installation units. Only those who have passed the acceptance can use it.
22, "special equipment safety supervision regulations" provisions of the construction hoisting machinery, at the time of acceptance shall accept the supervision and inspection of inspection and testing institutions with corresponding qualifications.
23. The construction unit shall, within 30 days from the date of acceptance of jack-up erection facilities such as construction hoisting machinery, integral lifting scaffolding and formwork, register with the construction administrative department or other relevant departments. The registration mark should be placed or attached to the equipment in a prominent position.
24, the main person in charge of the construction unit, the project leader, full-time safety production management personnel shall be qualified by the construction administrative department or other relevant departments before taking office.
The construction unit shall conduct safety education and training for managers and operators at least once a year, and record the education and training in personal work files. Personnel who fail to pass the safety production education and training examination shall not take up their posts.
25, homework personnel before entering the new job new construction site, should accept the education and training of production safety. Without education and training or education and training examination unqualified personnel shall not work at their posts.
26, the construction unit in the use of new technologies, new processes, new equipment, new materials, to deal with the corresponding safety education and training for workers.
27, the construction unit should be engaged in dangerous operations in the construction site personnel for accidental injury insurance.
28, construction personnel in the construction process should meet the following requirements for safe operation:
(1) Carry out the construction work according to the technical standards for construction safety and the safety operation procedures of this type of work;
(2) Operators shall abide by the mandatory standards, rules and regulations and operating procedures for safe construction, and correctly use safety protection appliances and machinery and equipment in accordance with the relevant provisions of national labor protection;
(3) When there is an emergency that endangers personal safety during construction or an abnormal safety condition is found on the construction site, the operators have the right to immediately stop operation or evacuate the dangerous area after taking necessary emergency measures, and report to the safety administrator or construction management personnel. Construction workers have the right to refuse to carry out the operating instructions of managers who violate the technical standards of construction safety or safety operating rules, put forward suggestions for improvement of operating rules and operating conditions that may affect human health and personal safety, report to the person in charge of construction safety management and construction safety supervision institutions, and have the right to report and accuse the illegal instructions.
(4) The operators have the right to criticize, report and accuse the safety problems existing in the working conditions, procedures and methods on the construction site, and have the right to refuse illegal command and force risky operations.
29. It is an economic measure for an enterprise to carry out safety management on its subordinate engineering contractors and clarify their rights and obligations. In economic contracts and agreements, it is necessary to specify specific measures and methods linked to the economy, so that rewards and punishments are clearly defined, and there are safety production indicators in economic contracts and agreements. Economic contracts and agreements shall come into effect after being signed by both parties. The signed economic contracts and agreements (safety production indicators) shall be filed in the safety management data of the construction site for future reference.
30, formulate the real steps and measures to complete the safety management target compliance plan, as well as the assessment and reward and punishment methods, and decompose the target plan into every manager and all production teams in this project department. The decomposition and implementation of safety management target plan can be carried out in the form of safety production and civilized construction target liability form signed by the company and the project department, the project department and various managers and production teams, and the safety production target liability form can be filled in through regular assessment. Safety management objectives should be filed in the safety management data of the construction site for future reference.
The fifth chapter requires the construction unit to do a good job in civilized engineering construction and the management of office safety data and files.
Supervise and manage the construction site in strict accordance with the technical specifications and standards for construction safety, and check that the construction unit truthfully fills in the following information:
1, safety production responsibility system (centered on safety production responsibility system, civilized construction management regulations, methods, and safety technical operation procedures for each type of work. ).
2. Safety target management.
Coordination table: safety responsibility target assessment record table (table).
3. Construction organization design (construction scheme) and special safety construction organization design.
4, safety technical disclosure.
Cooperation Table: Safety Technical Disclosure (Table)
5. Security check.
Coordination table: safety inspection record table (table-1), accident hidden danger rectification notice (table -2) and accident hidden danger rectification feedback report (table -3).
6. Safety education.
Coordination table: safety education record table (table-1), three-level safety education registration card (table -2), safety education registration form for workers who change jobs (table -3) and safety training registration form for construction site management personnel (table -4).
7. security team activities.
Cooperation form: Pre-shift safety activity record form (form)
8, special operations related certificates.
Cooperation Form: List of Special Operators (Form)
9. Industrial accidents.
Coordination table: industrial accident quick report (table-1) and industrial accident monthly report (table -2)
10, safety sign.
Cooperation Table: List of Safety Signs on the Construction Site (Table)
1 1, acceptance and testing of various equipment and facilities.
Matching table:
Acceptance forms of foundation pit support, scaffolding, formwork engineering, hole and limb protection facilities, dense mesh safety net hanging, temporary electricity consumption, material hoist, external elevator, tower crane, construction machines and tools, civilized construction, etc. (table-1 to table-1 1), test records of grounding resistance, leakage protector, insulation resistance, etc. (table-1 to table -3), and Registration Form for Use of Safety Protective Equipment on Construction Site (attached table).
12, the application for three-level hot work on the construction site is approved.
Form of cooperation: application form (form) for three-level hot work on the construction site.
Construction site safety management data should be classified and filed according to the above twelve items.
When an accident occurs at the construction site of a construction project, the construction unit shall take emergency measures to reduce casualties and property losses, and immediately report to the municipal construction administrative department and the municipal construction safety supervision institution. The investigation and handling of casualty accidents in construction projects shall be carried out in accordance with the relevant provisions of the state, and the safety training plan for project managers, technicians and operators of special types of work shall be formulated for major expenses, and the implementation shall be organized. Casualty accidents in construction enterprises should be counted, analyzed and reported regularly.
The supervision unit shall conduct regular or irregular supervision and inspection according to the construction unit and the implementation of the relevant provisions of these Measures.
During the supervision and inspection, if the supervision unit and safety supervisor find that the responsible unit violates the laws, regulations, rules, technical standards and norms of the state on building safety management and these Provisions, and find that there are potential safety hazards on the construction site or the construction operation does not meet the specified requirements, they can take the following administrative measures; For those who fail to perform the duties of construction safety management, have potential safety hazards in the construction site, have construction safety accidents and violate the law in construction safety management, they will be issued the Notice of Rectification of Accident Potential, the Notice of Rectification of Ordering to Suspend or Partially Suspend Construction, and the Notice of Ordering to Stop Illegal Acts respectively, and will be given administrative punishment according to relevant regulations.
When the construction project is completed, the construction unit shall evaluate the construction safety management of the construction project. Entrusted by the owner, the supervision unit shall supervise and manage the implementation of the safety education system in construction enterprises.
Construction unit:
Signature of representative:
- Previous article:Ruili photography school
- Next article:What exactly do you do in operation?
- Related articles
- What flowers do Dalian grow?
- What's the difference between Carlo photography and Daguerre photography?
- What are balloons and hot air balloons saying?
- What do you think of Anglenala's wedding scene exposure, dancing in a wedding dress and Zheng Yonghua singing?
- Glory 50 configuration parameters
- Song Qin, in a leisurely mood, revisited the first place with the goddess.
- Please ask professional photographers to "detail the wedding follow-up process and what photographers need to do, how to communicate with the couple and what they need to communicate"
- The actor who plays the role of Lieutenant Li in the Rainy Rain
- Did Mu Xin write it or did Fan Xiaochun lend it to me?
- What's the telephone number of Wuhan Fanqi Zhubao Jewelry Co., Ltd.?