Image data that should be done well in building engineering?

1, Foundation, main works: Take photos and videos to record the real situation of the construction site for concealed works such as upper and lower procedures, important structures and key parts, procedures and parts prone to quality problems, test processes of new technologies, new processes, new materials and new equipment, and major changes.

2. Thermal insulation wall: auxiliary base and its surface treatment, anchoring, steel mesh, thermal bridge treatment, insulation board bonding and fixing.

3. Curtain wall (omitted).

4. Door and window engineering: insulation and filling at the joint of frame and wall.

5. Roofing project: details such as base course, insulation layer laying, thickness, joint filling quality of plates, thermal bridge, etc.

6. Ground engineering: base course, thickness of thermal insulation materials, bonding and thermal bridge parts.

7. Heating: If necessary, take photos of the concealed construction and archive it.