With the deepening of people's understanding of the law, we use contracts more and more, and signing contracts is an important measure to reduce and prevent disputes. Do you know what the main contents of the contract are? The following is a sample of the 2022 project construction contract (7 copies selected) compiled by me for reference only. Let's have a look.
2022 Project Construction Contract 1 Employer: _ (hereinafter referred to as Party A)
Contractor: _ (hereinafter referred to as Party B)
In accordance with the Contract Law of People's Republic of China (PRC) and other relevant laws and regulations, and following the principles of equality, voluntariness, fairness, honesty and credibility, both parties reached an agreement on project contracting and signed this contract.
Article 1: Project Overview
The lakeside slope protection project is contracted to Party B, and the construction is contracted with materials. The total length of lakeside slope protection is calculated as _ _ _ meters.
Article 2: Construction Scheme
1, slope protection
(1), the base is _ _ m wide _ _ _ m thick, and _ _ m high gradually from bottom to top. Cold-drawn brick belt is needed for the stressed part, and the external wall needs sanding (cement grade 42.5, bricks should be of good quality).
(2) Demolition of three houses next to the toilet for access.
(3) The completed fence is about10m.
(4) The gap between the wall and the bank should be tamped with soil, and an appropriate amount of leaking pipes should be added to the wall.
Article 3: Term of Contract
1. The construction period is _ _ _ _ _ _ _ _ _ _ _ _ years, that is, _ _ _ _ _ _ _ _ years.
2. In case of force majeure during construction, or Party A requests Party B to stop work, the construction period will be postponed accordingly.
Article 4: Price and Payment Method
1, and the total contract price of the project is _ _ _ yuan.
2. The above-mentioned total contract price is lump sum price, including all work contents, labor and materials contracting and all other expenses (including house demolition and fence) of this contract, and Party A does not need to pay any more expenses to Party B. ..
3. Payment method: RMB yuan shall be paid after the completion acceptance, and the remaining amount shall be paid in addition to 5% of the total amount, and the quality deposit shall be paid one year later (the time shall be calculated from the date of acceptance).
Article 5: Obligations of Party A
1. Allocate the project payment to Party B according to the contract.
2. Assist in coordinating matters such as temporary water and electricity use on the construction site.
Article 6: Obligations of Party B
1. The contractor is responsible for supervising and inspecting the quality, progress and safety of the project, handling daily related matters and ensuring the safety and stability of the project construction.
2. The contractor must complete the contracted project and shall not subcontract it to others.
Article 7: Construction Safety
The contractor shall abide by the relevant provisions of the project construction safety production management, organize the construction in strict accordance with the safety standards, and take necessary safety protection measures to eliminate the hidden dangers of accidents. Party B shall bear all responsibilities and expenses caused by accidents in the construction process.
Article 8: Acceptance
The project completion acceptance shall be based on the construction scheme and quality acceptance standard. If the acceptance is unqualified, Party B shall be responsible for rework for free.
Article 9: Liability for breach of contract
1. Party A shall pay the project payment in time as agreed in this contract. In case of overdue, Party A shall pay liquidated damages to Party B (the interest shall be calculated according to the bank loan interest rate of the payable amount for the same period).
2. If Party B fails to complete the project on schedule due to reasons other than Party A's or force majeure, Party B shall pay liquidated damages of 1% of the total project amount to Party A for each day overdue; If the overdue period exceeds ten days, Party A has the right to unilaterally terminate the contract.
Article 10: Other
This contract was signed by both parties on.
Employer: _ (hereinafter referred to as Party A)
Contractor: _ (hereinafter referred to as Party B)
Date:
2022 Project Construction Contract 2 Employer: _ (hereinafter referred to as Party A)
Contractor: _ (hereinafter referred to as Party B)
In order to clarify the responsibilities, obligations and rights of both parties, as well as the contracting scope, unit price, settlement and payment method of the sub-project, and follow the principles of equality, voluntariness, fairness and good faith, so as to make this project safe, high-quality, efficient and completed on schedule, the following clauses are hereby formulated:
I. Overview of the Project
1. Structure type: frame structure
2. Approximate construction area: calculated according to the actual paved floor area after completion.
2. The contents of the contracted project are: contracting contracted materials (labor, main materials, auxiliary consumables, waterproof material paving, all construction tools, including all floors and walls turned 400mm, columns turned 400mm, and collecting well cleaning; All waterproof related work contents such as finished product protection, and all direct and indirect expenses), Party A will no longer bear any expenses.
Third, the term of the contract.
The commencement date is May 20, 20 10. If the construction period is delayed for more than three days, Party A has the right to ask Party B to leave unconditionally.
Four. Payment of contract price
1. Contract price: the unit price (all related expenses) of 400g materials and labor for polyethylene polypropylene waterproofing membrane (SBC) is calculated according to the actually completed floor area per square meter of 38 yuan, including but not limited to (400mm wall, column foot cleaning and overturning labor, 100mm overlapping material labor, additional layer and strengthening layer labor; According to the drawing design and specification requirements, clean up the expansion joints and labor costs of expansion joints on the ground and walls; Material transportation fee, material inspection fee).
2. Party B shall submit the completed engineering quantity report and relevant acceptance materials to Party A ... All the work undertaken by Party B must meet the requirements of specifications and contracts, and if it does not meet the requirements, it shall be settled at 60% of the contract unit price. And bear the cost of materials for rework and the fine for delaying the construction period.
3. According to the actual completed quantities, all materials of Party B will enter the site, and Party A will pay 80,000 yuan, and 95% of the project cost of the working face will be paid within 1 month after the foundation ground waterproofing is completed and accepted by the supervisor; The remaining 5% shall be used as the quality guarantee for this project, and shall be paid within 1 month after the warranty period expires.
Verb (abbreviation of verb) quality and test
1. Quality standard of contracted projects: see the construction process plan.
2. Party B shall submit the construction qualification certificate, ex-factory material inspection certificate, raw material re-inspection certificate, construction plan, manufacturer's production license certificate and related documents to Party A when entering the site.
3. Party A shall provide technical disclosure and related matters to Party B..
4. The quality of contracted projects should meet the agreed quality standards, and the evaluation of quality standards should be based on the quality inspection and evaluation standards of the country or industry.
5. Party B shall strictly abide by the requirements of standards, specifications, design drawings and the instructions issued by Party A according to this contract, accept Party A's inspection at any time, and provide convenient conditions for inspection.
Six, project acceptance and settlement
1. The project meets the acceptance conditions. Party A will accept the project within three working days, and both parties will measure the project quantity together.
2. The project payment settlement will take effect within 15 working days after being audited by Party A. If it is overdue, it will be deemed as agreement and settlement of the project payment.
3. If Party B's construction quality, progress and material quality affect the overall project plan and cause direct economic losses, Party B shall bear all the responsibilities.
Seven. quality assurance
1. Party B shall, in accordance with laws, administrative regulations or relevant national regulations on project quality warranty, undertake the quality warranty responsibility for the sub-projects delivered to Party A during the quality warranty period, and bear all expenses (materials and labor costs) arising therefrom.
2. The quality guarantee period is
3. The quality warranty gold is agreed by both parties to be 5% of the total project price, and will be paid within one month after the quality warranty expires.
Eight, safety construction
1, Party B's construction personnel must obey the management and command of Party A and take care of themselves.
2, responsible for the safety of their own construction personnel, and bear all work-related injuries, medical expenses, etc.
3. Clean up leftovers after work, and Party B is responsible for cleaning and transporting all materials and garbage when they leave the site.
Nine. Default and dispute
Breach of contract and disputes arising during the performance of this contract shall be settled by both parties through consultation. If negotiation fails, a public prosecution may be brought to the local people's court according to law.
X. For other matters not covered, both parties can sign a supplementary contract through negotiation, and the supplementary contract has the same legal effect.
1 1. This contract is made in quadruplicate, three for Party A and one for Party B, and shall come into effect as of the date of signing. The original contract is invalid. After the quality warranty period expires and the balance of the contracted project is paid off, this contract shall be terminated and become invalid.
Party A (seal): _
Party B (seal):
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2022 Project Construction Contract 3 Employer (Party A):
Contractor (Party B):
Article 1 Contract Basis
The legal basis of this contract is the Contract Law of People's Republic of China (PRC) and the Construction and Installation Contract and Construction Regulations. The contents and quantities of this project are calculated and approved according to the construction drawing of the new electrical part of Qingzhen Hanpoling 1 10KV substation, Volume 1, Volume 6, Lighting and Volume 1, Volume 7, Lightning Protection and Grounding designed by Guizhou Nengda Electric Power Design Co., Ltd.
Article 2 Name, location, scope and content of the project
1. Project name: qingzhen city Hanpoling 1 10KV substation grounding and lighting installation project.
2. Project location: qingzhen city Hanpoling 1 10KV substation.
Three. Scope and content of the project:
1: lightning protection and grounding installation of Hanpoling 1 10KV substation in Qingzhen.
2. Lighting installation of Hanpoling 1 10KV substation in Qingzhen.
Article 3 Method of Contract
In this project, Party A will contract out the project to Party B in the form of% settlement of contract and materials. (The settlement amount adopts the 20xx annual price list in Beijing; The budget price of installation materials is in accordance with the Notice of Guizhou Electric Power Company on Guizhou Electric Power Company (20xx annual price); The cost composition shall be in accordance with the Management System and Regulations for Capital Construction Budget of Electric Power Industry (20xx Edition); According to the power technology of Guizhou Electric Power Company [20xx year.
Article 4 Cooperation between the two parties
Party A is responsible for:
One: Party A is responsible for coordinating the contact between the project and relevant units to ensure the construction progress of the project.
2. Party A shall timely organize relevant departments to conduct intermediate acceptance according to Party B's construction progress and concealment.
Party B is responsible for:
1. If Party B finds any problems during the construction, it shall promptly report them to Party A..
2. Party B shall complete all the work in the project on time, and shall not affect other projects.
Three. Completion data shall be submitted to relevant departments for review.
Article 5 Liability for breach of contract
Investigate the other party's liability for breach of contract according to relevant national laws and regulations.
Article 6 Ways of handling economic disputes.
If there is any economic dispute, both parties shall settle it through consultation based on the principle of seeking truth from facts. If they can't achieve their goal, they can apply to the people's court for arbitration.
Article 7 Construction period
This project was completed before xx, xx, xx.
Article 8 Project contracting methods
The contract price of this project is the cost of labor, machinery, auxiliary materials and main materials.
Article 9 Safety responsibilities
Party B shall be responsible for the safety during the construction period and independently bear the corresponding responsibilities.
Article 10 Project cost
Project cost of this project: one hundred and twenty-nine thousand seven hundred and sixty Yuan only (129760.00), and the contract and materials of this project are settled according to the facts.
Article 11 number of contract copies
The original of this contract is in duplicate, each party holds 1 copy.
Article 12 This contract shall come into effect after being signed and sealed by the representatives of both parties.
Party A:
Party B:
Date:
2022 Project Construction Contract 4 Party A:
Party B:
In order to ensure the smooth completion of the project, Party A and Party B have reached the following agreement through full consultation:
1. Project: Repair of Jihe Bridge Service Road on s207 Line. The project contents include: environmental coordination, subgrade earthwork, simple pavement, steel temporary bridge, road safety signs, post-maintenance of old bridge and traffic control.
2. Total project price: RMB (in words).
3. Duration: from _ _ _ _ _ _ to _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
4. Project quality: Party B must carry out the construction according to the technical specifications and regulations of highway engineering-related projects, carefully select the construction scheme and construction technology, and the construction methods and technologies of key processes must be submitted to Party A or Party A's representative for approval before implementation. Party B shall take full responsibility for the project quality.
5, engineering safety and laws and regulations
(1) After the contract is signed, the person in charge of production safety of Party A shall be handed over to the construction site. Party B shall be responsible for the adaptability, stability and safety of all construction site operations and construction methods, and Party A shall not be responsible.
(2) During the execution of the contract, Party B shall actively protect all structures, materials, equipment and temporary works in the project. If economic losses are caused by poor management, Party B shall be responsible for it and bear relevant responsibilities.
(3) Party B shall strengthen the management of production safety to ensure safe production and civilized construction. Personal injury, mechanical equipment and other property loss accidents caused by poor management or the fault of migrant workers, or third-party reasons shall be handled by Party B, and the accident handling results shall be reported to the construction unit in writing. Party A does not assume any responsibility or pay any fees.
(4), blasting personnel must hold the blasting certificate issued by the competent department, the procurement of blasting equipment should have transportation certificate, storage certificate, storage should be classified, establish account, strictly implement the system of recipients and distribution, and never flow to other construction sites or others.
⑤ During the execution of this contract, Party B shall consciously abide by the laws, regulations and systems promulgated by the state, local governments and relevant departments, otherwise all consequences arising therefrom shall be borne by Party B, and Party B shall pay all taxes and fees it should bear in time according to the relevant regulations of the state and local governments.
6. Party B shall deal with the external environment during the construction by itself, and Party A shall provide assistance when necessary, and all expenses shall be borne by Party B. ..
6, project settlement and payment
(1), the loan amount in the middle of the project is 60% of the actual progress of last month and the price of qualified projects.
(2), the project price settlement formalities within one month after the completion of the project.
7. Others:
(1) This agreement is in lump sum contract, and the unit price will remain unchanged during the execution of the contract.
② This Agreement is made in quadruplicate, with each party holding two copies.
(3) This agreement shall come into effect as of the date of signing and shall be completed after the new bridge construction unit enters the site for delivery.
④ Other matters not covered shall be settled by both parties through consultation, and the supplementary terms shall prevail.
8. Accessories: construction drawings and material supply.
8. 1. After the contract is signed, the construction unit shall provide a copy of the drawings, and the drawings shall not be handed over to a third party without consent.
8.2. Party B shall be responsible for the procurement and acceptance of materials required for this contract project, and the transportation and storage of all materials. Party A shall not bear any expenses, and the incoming materials shall be sampled in batches according to the requirements of the specification, and can only be used after they are qualified. Party B shall transport the unqualified materials out of the construction site in time. The material test shall be sampled by the constructor on site, and all expenses shall be borne by Party B. ..
Party A:
Party B:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2022 Project Construction Contract 5 Party A: _ _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ _ _
Based on the principles of fairness, justice, equality and mutual benefit, Party A and Party B have reached the following cooperation agreement:
1. Party A will cooperate with Party B to carry out earthwork. Contributed by Party B, accounting for 70% of the total profit; Party A is responsible for management, project signing, collection and other work, and does not contribute, and Party A accounts for 30% of the profits.
2. During the cooperation agreement period, that is, when the earthwork construction contract expires, the final payment of the project will be fully recovered, and the agreement will automatically become invalid.
Three. During the cooperation between Party A and Party B, the profits or losses shall be distributed in proportion.
Four. During the cooperation, one party holds the card and the other party is responsible for keeping the password of the savings card to ensure the safety of project funds and the normal construction of the project. Any sum of money must be signed by both parties or informed by telephone, and the situation will be informed by SMS.
5. During the cooperation period, neither Party A nor Party B may borrow or temporarily use funds for any reason.
6. The project progress payment received by both parties during the project management and construction only meets the construction machinery cost and labor cost of migrant workers, or the cost related to the project. No capital expenditure unrelated to this project shall be spent, and part of the share shall be paid in proportion every month.
7. During the cooperation, the selection of teams and the pricing of subdivisional work shall be determined by both parties through consultation.
Party A (seal) _ _ _ _ _ _ _
Party B (signature) _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2022 Project Construction Contract 6 (hereinafter referred to as Party A) _ _ _ _ _ _ _ _ _ _ _ _
The Contractor (hereinafter referred to as Party B) _ _ _ _ _ _ _ _ _ _ _ _
According to the Economic Contract Law of the People's Republic of China, the Construction Law of People's Republic of China (PRC), the Regulations on the Quality Management of Construction Projects and other relevant laws and administrative regulations, as well as the relevant construction project quality standards, norms and regulations, and the laws and regulations promulgated by _ _ _.
I. Overview of the Project
1. Project name: _ _ _ _ _ _ _ _ _ _.
2. Project location: _ _ _ _ _ _ _ _ _ _ _.
Second, the scope of project contracting
Safety maintenance and rectification.
Third, the term of the contract.
_ _ _ _ _ days.
Fourth, the project cost
The project cost is: _ _ _ _ _ _ _ _ _ _ _ Yuan only.
Verb (abbreviation of verb) quality standard
1. quality standard: in line with the current national or industrial quality evaluation standards.
2. Use standards and specifications (including but not limited to the following)
(1) The technical standards and specifications of this project shall conform to the national, ministerial and local construction technology (acceptance) regulations and specifications.
(2) The local standards and regulations applicable to this project must conform to the provincial standards and regulations.
Six, the way of contracting
Contract work, materials, quality, time limit for a project and safety according to the work contents listed in the scope of contract in Article 2 of this contract.
Seven. Project valuation
1. Compilation principle of this project: according to _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
2. Determination of labor and material prices: Labor wages are calculated according to _ _ _ _ _ _ _ _ _ _ _ _ _.
3. The specific quantity shall be subject to the visa form of Party A. ..
Eight, time limit for a project
In any of the following circumstances, the construction period can be extended after the visa is verified.
1. Work stoppage caused by force majeure factors, including: national policy adjustment, war, unrest, flying objects falling or other explosions and fires not discovered by Party A and Party B, floods, earthquakes and other natural disasters, with an hourly rainfall of more than 200mm (subject to the report of _ _ _ _ _ _ _ _ _ _ _ _), and water supply and power failure once.
2. If the construction period of key working procedures of Party B is delayed due to reasons other than Party B, the construction period may be extended according to the actual situation.
3. If the construction period is delayed due to Party B, the contract construction period cannot be postponed, and the expenses shall be borne by Party B. ..
4. If the project is delayed due to Party A's reasons, the contract period will be postponed and the expenses will be borne by Party A. ..
Nine. Payment of project funds
1. After the project is completed, Party A shall pay 80% of the project budget price to Party B within 10.
2. After the project settlement is completed, Party A shall pay 97% of the total settlement price and reserve 3% of the total settlement price as the project warranty fund. If there is no quality problem within one year 15 days after the acceptance of the project, the warranty money will be returned in full without interest.
X. liability for breach of contract
1. Default scheme: Party B shall bear the liability for breach of contract in the form agreed in this contract. If there is no agreement in the contract, the case contract law and relevant laws and regulations shall prevail.
2. If the breaching party's breach of contract causes losses to the other party, if the breaching party's liability for breach of contract is still insufficient to make up for the other party's losses, it shall also be liable for compensation.
XI。 Safe production and civilized construction
Conscientiously implement the national and local laws and regulations on construction safety production and the relevant management requirements of the construction unit, do a good job in safety management, put an end to major safety accidents, and do a good job in comprehensive social management.
Twelve. Settlement of disputes
Disputes arising from the performance of this contract shall be settled by both parties through consultation or mediated by the local construction administrative department. If mediation fails, both parties agree to settle it by the people's court where the plaintiff is located, but the construction shall not be interrupted during the litigation.
Thirteen. others
Party B shall pay the wages of migrant workers in time according to relevant national regulations. If the project undertaken by Party B is delayed in the construction process, it will be handled by the government, and Party A has the right to pay the wages of migrant workers directly from the project funds. This contract is signed in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party A (official seal) _ _ _ _ _ _ _ _ _ _ _ _
Party B (official seal) _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2022 Project Construction Contract 7 Party A:
Party B:
In accordance with the Contract Law of People's Republic of China (PRC) and the relevant provisions of architectural decoration engineering, combined with the specific conditions of this project, Party A and Party B have reached an agreement on the relevant matters of this project through full consultation, and hereby sign this contract for compliance.
1. Project name: maintenance and reconstruction project of the front hall of Yuehua Building.
Second, the project scope:
1. Part of the wall of the hall, expansion of the top of the hall, service desk, canteen, business center and staircase treatment, restaurant door, elevator door, court maintenance and renovation.
2. All 6 1 rooms (including 4 large suites) from the second floor to the seventh floor have been renovated.
3. Doors and windows of corridors and exits on each floor shall be set, doors and windows of public toilets on the second floor, balconies on the third and fourth floors shall be set, and doors of conference rooms, staircases, elevator doors in halls and courts shall be repaired and reconstructed.
4. Paint the external wall of the external building facing west.
III. Project contracting mode: Both parties agree that Party B will contract the construction by contracting for work and materials.
Fourth, the construction period:
1, agreed to be seventy-five days (calendar period).
Commencement date: July 20xx 12
Completion date: September 26th, 20xx
2. Three days before the commencement, the contractor shall send a notice of commencement to Party A. ..
3. In case of any of the following circumstances, the construction period shall be postponed accordingly after being verified by the on-site representative of Party A:
(1), the preparation for entering the site within the scope of Party A's responsibility (such as vacating the site, water supply and power failure) does not affect the normal construction in time.
(2) Both parties agree on major design changes.
(3) Continuous water and power cuts affect normal construction for more than 24 hours.
(4) For concealed works, after receiving the notice from Party B, Party A failed to arrive at the site for the visa within 24 hours, which affected the construction of the next working procedure.
(5) Failing to allocate the project progress payment as stipulated in the contract, which affects the construction of material preparation.
(6) Other force majeure factors delay the construction period.
Five, the project quality:
1. Party B must carry out the construction in strict accordance with the construction drawings and ministerial standards (GGG73-9 1) and accept the supervision of Party A's on-site representative. ..
2. The main raw materials, equipment, components and semi-finished products provided by Party B must be the products designated by Party A, and can only be used for engineering construction after Party A's acceptance. ..
3. Room maintenance, construction quality shall not be lower than the quality requirements of completed model houses. Where Party A requires the model room to be improved (such as living picture frame, bathroom picture frame, bathroom craft glass specification, bed back frame modeling, bathroom mirror lamp, power switch of exhaust fan for moving the bathroom, etc.). ), all kinds of electrical lines must be transformed through pipes and buried walls, and Party B must make improvements according to Party A's requirements, and ensure the quality and process effect.
4. For concealed works, Party B shall notify Party A 24 hours in advance, and the next working procedure can only be started after being appraised and signed by Party A's representative.
5. After Party A receives Party B's notice of completion acceptance, Party B shall submit the project completion data to Party A at the same time, and the project completion acceptance can only be carried out after Party A has passed the inspection. Party A fails to organize the acceptance within 15 days after receiving the notice without justifiable reasons or refuses to accept it within one month after acceptance, and does not put forward any modification opinions, which shall be deemed that the completion acceptance report has been approved.
6. After the project is completed, Party B shall guarantee the project according to regulations. The warranty period is one year from the date when the project is completed and accepted.
Payment and settlement of the project price with intransitive verbs;
1. The project budget is approved by Party A and Party B and the superior competent department of Party A, and the total budget price is 1057500 yuan. If the engineering quantity changes, it will not be adjusted within 5%, and the ex-factory price exceeds 5%, both parties will negotiate to adjust.
2. After the signing of this contract, Party A shall pay Party B 654.38+ten thousand yuan for the preparation of materials first, then Party A shall pay 85% of the progress payment according to the progress of the project every month, and then pay 5% of the total amount after the project is accepted.
3. The project warranty payment shall be withheld by Party A according to 10% of the project settlement amount, and the warranty period shall be one year, and shall be paid to Party B in one lump sum after the expiration of the warranty period. If there is any engineering quality problem during the warranty period, Party B must go to the site to deal with it on the day of receiving Party A's notice, otherwise Party A can handle it by itself, and Party B shall be responsible for the required materials, maintenance and management expenses, and Party A shall deduct the warranty money.
4. Remittance method: Party A only remits money according to the designated bank account provided in this contract.
Seven. Responsibility of both parties
1. Party A guarantees that the site within its responsibility will be vacated, and power and water will be cut off.
2. Party B must organize the construction in strict accordance with the quality requirements of this contract, ensure the quality, construction period and safety, and strive for high-quality projects.
3. Party B's construction team must strictly abide by Party A's rules and regulations, abide by the law and conduct civilized construction.
4. It is forbidden for non-Party B's construction team to enter the construction site.
5. During the construction period, Party B shall not damage facilities, equipment and articles other than decoration, otherwise Party B shall be responsible for compensation.
Eight. Party B shall take safety protection measures according to regulations. For safety accidents and quality accidents caused by Party B, Party B shall be responsible for the investigation and handling, and bear all losses caused by the accidents, and Party A shall not be responsible.
9. If Party B's construction quality is inferior, Party B shall be responsible for the losses caused. Party A also has the right to punish at 10% of the total cost of inferior projects. If Party A fails to pay the project progress payment to Party B according to the regulations, which affects Party B's construction progress, Party A shall be responsible for it.
Ten, according to the provisions of the construction contract, on the premise of ensuring excellent engineering, reward 1000 yuan one day in advance, and fine 1000 yuan every day in advance.
Eleven, any party violates the provisions of the contract, the two sides can not negotiate, resulting in disputes, according to the "People's Republic of China (PRC) contract law".
12. Other matters not covered and other problems in the construction shall be solved through negotiation and communication between both parties.
Thirteen. This contract is made in octuplicate, with each party holding four copies, all of which have the same legal effect. This agreement shall come into effect as of the date of signing and shall be terminated after all obligations of both parties are fulfilled.
Party A:
Party B:
Date:
;
- Previous article:What ring does Panjiayuan belong to?
- Next article:What brand of bag is Kstyle?
- Related articles
- The host speech of the Spring Festival Gala
- Fan Fei wedding photography poster
- Without a good media team, how can we make a vlog video that everyone likes?
- Where is the building site of Liaocheng Anxin Shuxiang Courtyard?
- Will underwater photography have color distortion?
- How many colors of photosensitive layers are used in color photographic negatives now?
- Wuzui photography media
- Chu Ci's Answer to the Reading Question of The Old House
- How long does it take from Xiamen North Station to Xiamen International Conference Center Hotel?
- Hideaki Anno's major works