Traditional Culture Encyclopedia - Photography major - Building leveling problem
Building leveling problem
It takes two people to finish. The concrete steps are as follows: 1, set the elevation between the tower crane foundation and a wall mentioned by your master; 2. Find someone to take a ruler, mark the bottom of the ruler or mark it with a pen (1), and aim the bottom or mark at a meter point on the wall, which must be aligned and vertical; 3. Then look at your ruler with a level. Then take your ruler and walk to the four piles of the tower crane foundation, which should be vertical. By moving the ruler up and down, you can clearly see the red mark (No.2 mark) you marked on the level. Then don't move, look down, find the mark (No.1), and extend this mark 1 to your stake, which is the one-meter horizontal line your master wants. All right, it's done. Better check it again. Report to your master.
- Previous article:Method of finding fingerprint appearance
- Next article:Photographic works of black and white dormitory
- Related articles
- Looking up at the starry sky, every atom in me is missing my hometown.
- Is Beijing Film Academy difficult to take the exam?
- Where is there a special place to sell photographic equipment in Foshan?
- Introduction of Jiubujiang Scenic Spots
- How to describe a Chinese wedding with a composition
- Wang Xufeng's resume.
- What did Durant do to Rihanna in the competition?
- Take a photo in spring and send it to a friend (commonly used 60 sentences)
- Which driving company in Nanning has more orders?
- Looking for horror suspense movies