Traditional Culture Encyclopedia - Photography and portraiture - Model essay on electric shock emergency drill scheme and process for gas station personnel (5 selected articles)
Model essay on electric shock emergency drill scheme and process for gas station personnel (5 selected articles)
Model essay on electric shock emergency drill scheme and process for gas station personnel (select 5 articles) 1. Petroleum products in gas stations are flammable, explosive, easy to leak and easy to accumulate electrostatic charges. We must establish the idea of "safety first", implement the policy of "prevention first, combining prevention with elimination", and customize safety plans to ensure the safety of employees and customers. According to the prevention needs of gas stations, it is necessary to build a number of video collection points, covering import and export, refueling work areas, convenience stores, checkout counters, oil depot areas and other parts.
First, demand analysis.
1. Real-time understanding of gas station work and transactions;
2. It can monitor whether customers violate the regulations of gas stations in real time, such as smoking, filling gasoline into automobile carburetor and plastic bucket, not stopping to refuel, bringing dangerous goods into the station, etc.
3. The system should have an alarm interface, which can transmit the alarm signal to the general monitoring center in real time when the gas station alarms, and can set up various alarm linkage mechanisms to realize the combination of video monitoring and alarm.
Second, the system settings
1. Import and export
Gun-type network camera is used at the entrance and exit of gas station, which has the characteristics of high resolution, low illumination and wide dynamic, and can meet the requirements of import and export prevention. With white light, not only can the vehicle license plate and the facial features of people entering and leaving be clearly photographed at night, but it can also be used as a street lamp.
2. Refueling work area
The refueling work area is the main activity place for foreigners and refueling vehicles, and it is necessary to control each refueling point. The intelligent spherical network camera is used to cover a large area, which can be adjusted vertically by 60 degrees and horizontally by 355 degrees, and the details of the refueling area can be monitored in full HD.
3. Convenience store, cashier
In trading places, it is necessary to clearly record the characteristics of traders and the needs of trading situations. Because convenience stores and checkout counters are indoors, we use hemispherical webcams. Beautiful appearance and high resolution meet the requirements of monitoring points.
4. Oil depot area
The oil depot area is the focus of gas station prevention. Once an accident occurs, the consequences are unimaginable. Using automatic tracking intelligent high-speed ball camera and intelligent analysis technology, people and vehicles entering the oil depot can be tracked and captured clearly and completely. The ball machine should have the characteristics of automatic tracking, low illumination, wide dynamic and fast operation.
Third, the monitoring center
The monitoring center is the information collection center of the front camera, and the system uses DVR as the collection core equipment. The front-end video is encoded, stored and uploaded to the network by DVR hard disk recorder. At the same time, the front-end alarm signal is connected to realize alarm linkage and alarm upload. The monitoring center can be located not only in gas stations, but also in provincial sales management companies.
Fourth, the system platform
The system platform is a set of network video monitoring system located in the monitoring private network environment. The whole software platform is designed as a distributed system, and each component has its own function and is relatively independent, forming an organic whole. It consists of central service module, storage service module, streaming media service module, TV wall service module, alarm service module and client module. Install client software on the computer, according to the division of authority, use IE browser recording server to remotely control the setting, image browsing, video recording and playback of front-end equipment in the jurisdiction.
Model essay on electric shock emergency drill scheme and process for gas station personnel (selected 5 articles) Part 2 1: Analysis of accident types and hazard degree.
1, accident type.
(1) Casualties caused by fire accidents.
(2) Casualties caused by falling of ladder platform.
(3) Casualties caused by electric shock.
(4) Casualties caused by traffic accidents.
(5) Casualties caused by natural disasters.
(6) Casualties caused by robbery.
2. Hazard analysis.
Casualties and property losses. The emergency plan for casualty accidents can be started at the same time as other emergency plans that may involve casualties.
Second, the emergency organization personnel and responsibilities.
1, gas station manager: responsible for overall coordination and command on site.
2. Gas station accountant: responsible for communication and alarm contact.
3. The gas station front office supervisor is responsible for organizing personnel to conduct on-site disposal.
4. Other personnel on duty at the gas station are responsible for on-site command and deployment to complete the assigned tasks.
Third, prevention and early warning.
When danger is found, any manager above the front office supervisor on duty at the gas station will start the emergency handling procedure after confirming the danger. The gas station manager (or vestibular supervisor) shall order the gas station accountant to report to the superior leaders at all levels according to the on-site situation and developments.
Call the police at the same time 1 10, 1 19, 120. If the situation expands and the situation is urgent, you should contact nearby enterprises and street offices in time, inform the gas station of the emergency and ask for assistance in evacuation and rescue.
(1) emergency types (fire, natural gas leakage, oil spill, personal injury, etc. ).
(2) The name and address of the gas station.
(3) the name and telephone number of the alarm person.
Fourth, emergency measures.
(1) When the wounded are slightly injured, they can be treated by the temporary medical team on the spot; Deadly or seriously injured, the accountant should call 120 for help, and the on-site staff should assist the medical staff to send the injured to the nearest hospital for treatment.
(2) Stop business when necessary, and report relevant information to the superior in time.
Fifth, the emergency is over.
After confirming that the casualties have been properly placed, the stationmaster shall report to the superior leader and terminate the emergency handling procedure after obtaining the consent.
Sixth, emergency supplies and equipment support.
Wan gas station is equipped with fire-fighting equipment and materials according to the management norms of gas stations to ensure the effectiveness of emergency materials. At the same time, relying on local social resources and joint defense organizations.
Seven. Supplementary provisions.
1, drill requirements.
(1) At the beginning of each year, Southwest Company is responsible for conducting a special emergency plan training for all station employees. Training plans, teaching materials and test papers should be reported to the higher authorities for approval and filing.
(2) New employees must receive safety training at Wan Gas Station before taking up their posts.
(3) The cumulative safety training time shall not be less than 40 hours, and there shall be training records. The examination takes the form of closed book and is presided over by the stationmaster. Those who fail the exam should be retrained.
2. Modify and improve the scheme.
The emergency group of Wan Gas Station organized the revision of the special emergency plan. Without special reasons, the special emergency plan shall be revised once a year. Due to the following reasons, the emergency plan should be revised in time:
(1) Promulgate and implement new relevant laws and regulations or revise and implement relevant laws and regulations;
(2) through emergency plan drills or emergency inspections, it is found that there are defects or loopholes in the emergency plan;
(3) organizational changes in the emergency plan or other reasons.
The modification of the plan must be approved by the superior company or re-evaluated by the professional department before implementation.
3. Implementation of the plan.
Model essay on the scheme and process of electric shock emergency drill for gas station personnel (selected 5 articles) Part III Electric shock accident is a common accident in highway bridge construction. It is also the main type of personal injury and death accidents in enterprises. Judging from the final injury degree of the electric shock victim, if the electric shock victim is rescued in time and in the right way, it is very likely to be rescued. The purpose of preparing the emergency plan for electric shock accident is to try our best to rescue the injured from the death line and reduce the casualties of the accident to a minimum.
I. Scope of application of the plan
This emergency plan is applicable to all employees involved in the production of this project. When there is an electric shock accident in the workplace, they should be responsible for the emergency rescue of others. In case of electric shock accident in other places, undertake the obligation of emergency rescue for foreigners.
Second, simulate the exercise situation
It is assumed that the electric shock accident occurred in K2 1+080 mixing plant of the project department in this contract period. Because the migrant workers' company connected the wires privately, the workers were electrocuted and fell to the ground, which was very critical.
Third, the time of the exercise.
The exercise time is scheduled for July 20th, 20XX/morning of KLOC-0/8th 10: 00.
Iv. Planning organization and responsibilities:
1, electric shock accident organization (commander in chief)
The main responsibilities of Commander-in-Chief Tang Chao:
First, be fully responsible for on-site emergency work;
B, decided to start the emergency plan;
C, command emergency work.
Deputy Commanders: Ding Baijun and Wang Haibin.
Main responsibilities:
First, organize emergency work;
B, coordinate the unified scheduling of all departments;
C, responsible for investigation, monitoring and the determination of the first aid plan.
On-site conductor: Tang Zhang Kai, Ma Chengwu and Sheng Hui.
Main responsibilities:
A, communicate and contact the drill personnel of various departments, and be responsible for the smooth flow of rescue lines and on-site alert;
B, assist the commander-in-chief to do a good job in various logistics affairs and preparation of drill materials and other related matters;
C, coordinate communication with local hospitals and public security, and be responsible for the collection and arrangement of drill data.
2. The responsibilities of each group:
(1) Accident handling group: The main task is to determine the rescue plan, and organize personnel and vehicles to rescue electric shock personnel;
(2) Medical rescue team: The main task is to rush to the scene of the accident in time to rescue the electric shock personnel, and decide to give first aid at the scene or the nearest hospital according to the injury to ensure the safety of personnel.
(3) Alert Liaison Group: The main tasks are to upload and issue leadership instructions, clear traffic routes, communicate with the outside world about the scene of the electric shock accident, and send people to meet at the intersection to record the whole process of the exercise.
(4) Logistics Support Group: The main task is to obey the instructions of the leaders of the headquarters, arrange the dispatch of rescue drill vehicles and timely supply of emergency funds.
Verb (abbreviation for verb) practice program:
(1) On the morning of July 8th, 20xx 10: 00, Tang Chao, the commander-in-chief at the scene of the accident drill, received a call that "someone in the mixing station was electrocuted and there was no heartbeat". After receiving the report, the commander-in-chief immediately evaluates the site safety accidents and emergencies, and then starts the emergency plan for emergencies.
(2) The personnel of each group form an accident handling group: Ding Baijun, Wang Haibin, Tang and Ma Weiqiang; the medical rescue group:, Zhang Fengxiang,, the alert liaison group:,, Kai He; and the logistics support group: Huang Cheng and Wu.
(iii) Specific implementation steps
(1) 10:0 1, the electric shock accident handling team led by Ding Baijun rushed to the scene of the accident at the first time, and telephoned the site electrician to cut off the power supply quickly, so that the electric shock personnel could be completely separated from the current and the accident harm could be prevented from expanding.
② 10:02, Xie Yu, the captain of the medical rescue team, called the emergency number 120, and at the same time, he took the methods of "mouth-to-mouth resuscitation" and "chest compression" to give first aid to the electric shock.
(3) 10:03, Tong Qiang, the leader of the alert liaison group, led the alert liaison group to quickly pull up the cordon, guiding the surrounding employees to evacuate to a safe area and evacuate the onlookers, which not only ruled out the possibility of secondary electric shock, but also provided enough space for on-site rescue.
(4) If the heartbeat and breathing of the wounded have recovered after the rescue, the CPR operation can be suspended. After the ambulance arrives, Xie Yu and Zhu Xia will send the electric shock personnel to the hospital for physical examination and after-treatment treatment. However, the heartbeat and breathing may stop again in the early stage of resuscitation, so it is necessary to closely monitor and not be paralyzed, and be prepared to rescue again at any time.
⑤. 10: 04, if the heartbeat and breathing of the electric shock personnel have no obvious effect after first aid, and at the same time, under the condition that the hospital ambulance has not arrived, the ambulance team leader Xie Yuli will send the project ambulance to the hospital ambulance in the shortest time, and all the ambulance crew will start with the car. At this time, Tong Qiang, the leader of the alert liaison group, got in touch with the hospital ambulance as quickly as possible and immediately notified Xie Yu. The rest of the alert liaison team cooperated with the public security traffic police to ensure smooth traffic. The nearest handover place is determined by Xie Yu according to the actual situation.
⑥. 10: 10 Deputy Commander Ding Baijun reported the end of the exercise to Commander Tang Chao, who made a brief summary of the exercise.
Six, rescue equipment and materials
An ambulance, a stretcher, two medical hemostatic bandages, an oxygen bottle and a medicine box (including first-aid medicine and cotton swabs). ).
Seven, matters needing attention
1, the alert liaison group should carefully record the drill time, report time, personnel injuries and on-site personnel.
2. On the day of the drill, the logistics support team must ensure that all drill personnel and materials are transported to the mixing station before 10, and emergency funds and logistics-related materials are arranged in place.
Rescuers should arrive at the scene in the shortest time. After the rescuers arrive at the scene of the accident, they should obey the command of the headquarters and carry out first aid work. After the rescue, evacuate all personnel from the scene of the accident and to a safe area.
4. Commander-in-Chief Tang Chao summarized the drill and announced that after the drill, all the drill personnel would leave the drill site to restore the construction order. Through this drill, all our construction workers will be more clear about the rescue procedures of the emergency rescue plan. In order to deal with emergencies, the orderly implementation of emergency plans was ensured, time was gained for rescue, and the purpose of drills was achieved.
Electric shock emergency drill scheme and process model for gas station personnel (selected 5 articles) 4 Electric shock accident is a common accident in highway bridge construction. It is also the main type of personal injury and death accidents in enterprises. Judging from the final injury degree of the electric shock victim, if the electric shock victim is rescued in time and in the right way, it is very likely to be rescued. The purpose of preparing the emergency plan for electric shock accident is to try our best to rescue the injured from the death line and reduce the casualties of the accident to a minimum.
I. Scope of application of the plan
This emergency plan is applicable to all employees involved in the production of this project. When there is an electric shock accident in the workplace, they should be responsible for the emergency rescue of others. In case of electric shock accident in other places, undertake the obligation of emergency rescue for foreigners.
Second, simulate the exercise situation
Suppose that the electric shock accident occurred in the residence of the project department in this contract section, and the staff of a project department accidentally touched the exposed wires, resulting in electric shock and falling to the ground, which is very important.
Third, the time of the exercise.
The exercise time is scheduled for July 9th at 20XX. 10: 00 am.
Iv. Planning organization and responsibilities:
1, organize emergency drills for electric shock accidents (commander in chief)
Commander in chief: xxx
Main responsibilities:
First, be fully responsible for on-site emergency work;
B, decided to start the emergency plan;
C, command emergency work.
Deputy commander: xx, xxx
Main responsibilities:
First, organize emergency work;
B, coordinate the unified scheduling of all departments;
C, responsible for investigation, monitoring and the determination of the first aid plan.
2, each group of personnel:
Accident investigation team: xx
Medical rescue group: xx
Alarm contact group: xx
Logistics Support Group: xx
Field operation group: xx
Responsibilities of each group:
(1) Accident investigation team: protect the site and investigate the accident.
(2) Medical rescue team: The main task is to rush to the scene of the accident in time to rescue the electric shock personnel, and decide to give first aid at the scene or the nearest hospital according to the injury to ensure the safety of personnel.
(3) Alert Liaison Group: The main task is to upload and issue leadership instructions, divert traffic routes, and send people to meet at intersections.
(4) Logistics Support Group: The main task is to obey the instructions of the commanding leader, arrange the dispatch of rescue vehicles and timely supply of emergency funds.
(5) On-site operation group: conduct on-site emergency rescue, understand the cause of the accident, and report the on-site situation to the project manager at the first time.
Verb (abbreviation for verb) practice program:
1, 10:00, the staff of a project department accidentally stepped on the exposed wire, resulting in electric shock. Zhang Wei, a colleague passing by, immediately found a dry wooden stick to pull the wire away from the injured and called for help. Li Enmin, the foreman, rushed to the scene immediately after hearing the cry for help, and immediately reported to the project manager after a preliminary understanding of the situation and injury. Immediately after receiving the call, xxx started the emergency plan and rushed to the scene.
2. 10:03xxx arrived at the scene of the accident, knew the situation, immediately called the electrician to disconnect the master brake, and to prevent the damage from expanding, informed the surrounding onlookers to evacuate the scene.
3. 10:05, the medical rescue team arrived at the scene and immediately inspected the injured. When the injured person is found to be seriously injured, "mouth-to-mouth artificial respiration" and "chest compression" should be taken immediately to give first aid to the electric shock personnel.
4. 10:07, the alert liaison team arrived at the scene and immediately set up warning lines and warning signs at the main intersections to ensure the smooth rescue passage.
5. 10:09, the accident investigation team arrived at the scene, and the accident investigation team protected and obtained evidence at the scene of the accident and directed the rescue;
6. 10: 10 The injuries of the injured were initially controlled, and xxx sent a warning liaison team to the intersection to meet the emergency ambulance.
7. 10: 15 the logistics support team led the emergency ambulance to the scene to take the injured to the hospital. Xxx sent xx to the hospital to contact the family members to do a good job of appeasement, leaving the accident investigation team to see if there are other hidden dangers at the scene. The alert personnel should do a good job of site protection and wait for the accident investigation.
8. After the rescue, xxx reports the accident to the resident office, the director's office and the headquarters.
Sixth, the end.
Xx announced the end of the drill.
Seven. comment
The leaders of the General Director's Office, the headquarters and the quality supervision station gave instructions and comments on the shortcomings and missing links in the exercise.
Eight. abstract
Through this drill, all our construction workers will be more clear about the rescue procedures of the emergency rescue plan. In order to deal with emergencies, the orderly implementation of emergency plans was ensured, time was gained for rescue, and the purpose of drills was achieved.
Model essay on the scheme and process of electric shock emergency drill for gas station personnel (select 5 articles) Chapter 5 is specially formulated to improve the emergency rescue capability of the project department, effectively handle unexpected accidents, establish and improve a scientific, effective and well-functioning emergency rescue system, test the actual combat effect of emergency departments, and organize emergency rescue drills for electric shock accidents in the project department.
1. The guiding ideology and purpose of the drill is to implement the policy of "safety first, prevention first and comprehensive treatment", establish and improve the emergency management system of the project department, form an emergency system with unified leadership, timely response, scientific decision-making and orderly disposal, and comprehensively improve the ability of the project department to deal with emergencies and risks. By setting up emergency drills for accidents, the feasibility and operability of the emergency rescue plan of our project department are tested, the actual ability of emergency rescue and disaster relief is improved, the overall level of emergency rescue work of our company is continuously improved, and the life and property safety of employees in the project department is effectively guaranteed.
Second, the exercise time, place and participating units
(1) The drill time is scheduled for June 29th, 20XX.
(2) The drill site is the construction site of Fangjiashan Project Department.
(3) Units and personnel participating in the exercise
1. Project department leaders: general manager, quality assurance manager, HSE department manager, and managers of various construction teams.
2, safety personnel, team members, ambulance drivers, nurses.
Three. Accident setting Accident setting: At 9: 30am on June 29th, 20XX, employee XXX was cutting, and the third-level distribution box was electrified due to insulation aging of power cord. At that time, another employee XXX got an electric shock when he opened the door of the distribution box, and the employee was in a coma after getting an electric shock. The situation is very critical. Employees who are engaged in cutting operations should take immediate measures to give first aid and report to the HSE Department.
IV. Exercise Procedures and Division of Tasks
(1) Personnel arrangement
1, Chief Commander: Project General Manager, Deputy Chief Commander: Quality Assurance Manager
2. Team members: other leaders of the management department, managers of various departments, and heads of construction teams/factories of various disciplines.
3. Participants: safety officials, team members, ambulance drivers, nurses, ambulance personnel and general office personnel.
4. Recording and photographing: HSE management office staff and comprehensive office staff.
(2) Exercise: Electric shock rescue
(3), preliminary preparation:
1, building safety knowledge and common sense of preventing electric shock; (HSE Department and General Office are responsible)
2. Inspect the temporary electricity facilities on site; (The electrician class of the engineering department is responsible)
3. The site layout of the field exercise. (HSE Department and each construction team are responsible)
(4) Specific arrangements for electric shock rescue:
1, assemble the participants of the exercise;
2. Clean up the site and prepare tools;
3. Listen to the opinions of safety management personnel.
4. Start practicing. When employee XXX was cutting, the third-level distribution box was electrified due to the aging insulation of the power cord, which caused another employee XXX to get an electric shock when opening the door of the distribution box. After the accident, all participating units should carry out rescue according to the following procedures and assigned tasks.
1) At 9: 30, the employee got an electric shock. After discovering the accident, the cutting personnel immediately went to the gate to pull down the switch, and quickly carried out on-site first aid, and telephoned HSE department personnel and superior leaders. After receiving the report; the HSE department shall immediately organize personnel for rescue and report of the superior.
2) At 9: 38, the rescue vehicles and ambulance personnel of HSE Department arrived at the scene for first aid treatment;
3) At 9: 40, the project general manager or quality assurance manager rushed to the scene of the accident after receiving the report, and simulated and informed the county safety production supervision and management bureau and the competent department of the county construction bureau;
4) At 9: 45, carry the electric shock personnel to the ambulance and send them to the hospital for examination and treatment.
5. Main exercises:
1) The on-site construction team switches the switch while reporting;
2) Rescue by cardiopulmonary resuscitation and other methods at the scene;
3) Send the wounded to the hospital for examination and treatment;
6. End of the exercise (announced);
7. Clean up the scene.
Five, exercise command and rescue operation organization system and responsibilities
According to the Emergency Preparedness and Response Control Procedure, the organizational system and responsibilities of emergency rescue command and rescue operation for major accidents are as follows:
Commander-in-Chief: the general manager of the project, responsible for overall command.
Deputy Chief Commander (on-site command): Quality assurance manager, responsible for the command of the construction site.
(1) medical rescue team: responsible for the safe evacuation of field personnel, transporting the injured to the hospital for treatment, and guarding the accident area.
(2) Information Liaison Group: responsible for the communication and external contact at the scene of the accident.
- Related articles
- Who is the director of the Winter Olympics?
- Photography beginner course
- How to write the planning scheme of short video production?
- What are the famous African lion parks and the location of Wolf Warriors 2?
- The cast and crew of Cangzhou Good Man
- Proof of where to shoot silence-introduction of location
- What are the characteristics of the shape of a swan?
- What special skills can I add to my resume?
- What are the rape bases in Wangcheng, Changsha in 2022?
- What are the jobs of a photography assistant? What are the general requirements for recruiting photographic assistants in a studio?