Traditional Culture Encyclopedia - Photography and portraiture - Xi 'an Old House Renovation and Three-bedroom Decoration Steps

Xi 'an Old House Renovation and Three-bedroom Decoration Steps

First, the preliminary design is to make a detailed measurement of your room according to your living habits. Don't be lazy, you'd better measure yourself. The measurement mainly includes: defining the area involved in the decoration process.

Especially tile area, wall paint area, wallpaper area and floor area; Determine the main wall size.

Especially it is necessary to design the wall size of furniture in the future.

Second, the main demolition and reconstruction has entered the construction stage. The demolition and reconstruction of the main infilled wall is the first project, which mainly includes wall demolition, wall building, wall lifting, heating removal, plastic steel window replacement and so on.

To put it bluntly, the main body demolition is to put up the framework of the construction site first.

Third, hydropower transformation Before the water circuit transformation, the demolition of the main structure should be basically completed.

Between the hydropower transformation and the main body demolition, the first test of the cabinet should also be carried out.

The so-called initial measurement of cabinets has no actual content, because the walls and floors have not been treated, and it is impossible for cabinet designers to give specific design dimensions, but only put forward some relevant suggestions on the positions of water inlets and lampblack machine sockets reserved by developers.

It mainly includes: whether the position of the lampblack machine socket affects the installation of the lampblack machine in the future; See if the location of the water meter is appropriate; See if the location of the water inlet is convenient for installing the sink in the future.

The first measurement of cabinets can be done by experienced friends themselves.

After the waterway reconstruction is completed, it is best to waterproof the bathroom immediately.

The kitchen generally does not need to be waterproof, so it is recommended to be waterproof.

Woodworking, bricklayer and oiler are the "three brothers" in the construction process, and the basic order of appearance is: wood-tile-oil.

The basic entry principle is-whoever is dirty goes first.

"Who gets dirty first" is also one of the basic principles to determine the order of home improvement.

In fact, carpentry, such as vertical pipe, decorative ceiling and plaster line, can also be considered as the fine link of main demolition and reconstruction in a sense, which does not conflict with the water circuit reconstruction itself, and sometimes needs some cooperation.

5. The process of sticking bricks in the operation of "bricklayer's second child" also involves the installation of the following three links: the installation of the threshold and the installation of the marble windowsill.

The installation of the threshold can be completed together with the floor tile laying, or after the floor tile laying. Generally, after the window cover is completed, the marble installation union prepares glass glue and seals the marble and window cover with glass glue.

Install the floor drain.

Floor drain is the first hardware in home decoration, because it should be installed with floor tiles.

So when friends start shopping for building materials, they should buy a floor drain as soon as possible.

Installation of range hood.

The range hood is the first appearance of household appliances. After the kitchen walls and tiles are paved, you can consider installing a range hood.

"The second child of the bricklayer" left the scene. At this time, you can measure the cupboard for the second time. Accurately speaking, after the kitchen wall tiles are pasted and the range hood is installed, the second measurement of the cabinet can be carried out.

Sixth, painting the wall "The third oiler" comes into play, mainly completing the basic treatment of the wall, painting the wall and painting the furniture played by the "carpenter boss".

Students who are ready to paste wallpaper only need to let the "third oil worker" do basic treatment on the wall surface where wallpaper is planned.

As for whether to leave a coat for the last time, personally, I don't think it is necessary to be too serious. From my experience in decoration, it is not meaningful to leave the top coat, because there is nothing dirtier than paint.

7. The ceiling of the kitchen and bathroom cabinet is the first line in the installation process, or it is a continuation of the "packaging" of the home.

At the same time as the ceiling of the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (Yuba) of the kitchen and bathroom should have been bought.

Friends had better install the kitchen ceiling lamp and the exhaust fan (Yuba) at the same time, otherwise it will leave threads and holes.

Eight, after the installation of the kitchen cabinet ceiling, you can install the cabinet at home.

If it goes well, it can be finished in one day.

At the same time, there are sinks (excluding water fittings) and gas stoves. It is best to coordinate the property to turn on the gas before the cabinet is installed, because the gas stove needs to be tested after installation.

Nine, wooden doors installed on the second day of cabinet installation. As early as more than a month ago, after the wooden door was measured, it can be installed now.

If it goes well, it will be a day. At the same time, hinges, door locks and floor drains should be installed.

Related hardware should be prepared in advance.

If you want the wooden door manufacturer to install the window cover and pass it, you should also measure it when the wooden door manufacturer measures it, and install it at the same time on the day when the wooden door is installed. At the same time, you should consider putting the installation time of marble windowsill backward after the window cover is installed.

Remarks: The period of wooden doors is generally one month. Therefore, in order to make the construction period closely connected, after the main body is demolished and rebuilt, the wooden door manufacturer should come to the door to measure the size of the door opening as soon as possible.

Regarding the treatment of the doorway, it should be noted that if the height of the doorway at home is inconsistent, workers need to treat it at the same height-beautiful.

X. Floor installation The floor can be installed the next day after the wooden door is installed. If all goes well, it will take a day.

Pay attention to the following problems when installing the floor: 1. Before installing the floor, it is best for the manufacturer to visit the house to investigate whether the floor needs leveling or partial leveling. Some decoration companies or decoration teams will suggest leveling or partial leveling, which will be subject to the actual survey of floor manufacturers; 2. Before the floor is installed, the floor paved at home should be cleaned to ensure the floor is dry, so do not use water during the cleaning process.

3. When installing the floor, if possible, the floor must be cut in the corridor.

Clean it up after you finish.

Cutting the floor indoors has serious pollution to the wall, and cutting the artificial stone countertops of cabinets.

Eleven, the second day after the floor wallpaper, home clean, you can spread wallpaper. If it goes well, it's also a day.

If possible, the floor should be protected on the day of wallpaper pasting; It doesn't matter if there are no conditions, and it's no problem to give the wallpaper glue left on the floor to the cleaner.

Before pasting the wallpaper, try to make the wall "nothing".

Twelve, install the radiator the day after wallpaper. If the radiator is replaced or removed, the radiator can be hung on the wall in a down-to-earth manner.

It's also a day.

Wooden door-floor-wallpaper-radiator, which is recognized as the correct installation sequence. Install the wooden door first to ensure that the skirting line of the floor can be closely connected with the door cover of the wooden door; After the wallpaper was installed, it was mainly because the floor was dirty and dusty, which seriously polluted the wallpaper.

Here I use the principle of "whoever is dirty first" again.

Finally, install the radiator, because the radiator can only be installed after the wallpaper is laid on the wall.

Thirteen, switch socket installation should have a detailed understanding or record of the number and location of switch sockets in various natural rooms at home, especially the wallpaper, sometimes wallpaper workers are irresponsible, and the wallpaper is laid at once, and it is not necessary for wallpaper knife to mark the location of your switch socket.

So, you still need to know for yourself.

Fourteen, lamps and lanterns installation, there is nothing to say.

After the lights were installed, the house lit up, saying goodbye to the dazzling light of 100 watt incandescent bulbs during decoration-it felt really good.

15. All pipe fittings, bathroom fittings, toilets, clothes hangers, etc. All the hardware and sanitary wares bought before installation have been installed.

After the "big things" in front are installed, the home is still very "cold". When the lamps and hardware sanitary ware are installed, the home will be "alive", really "alive".

It is no exaggeration to say that it will be beautiful to open the dragon water for the first time and watch the water flow out. Convenient, the newly installed toilet at home for the first time will have a great sense of accomplishment.

Sixteen. Installation of curtain rod The installation of curtain rod marks the basic end of home improvement.

17. Don't install curtains before cleaning. When cleaning, don't have furniture and unnecessary household appliances at home. Leave as many "planes" as possible, so that the cleaning can be thorough.

18. The earliest time for furniture to enter the market should be after the water circuit transformation is completed, so that you can get a general understanding of the basic size range of furniture.

Therefore, some friends have been eager to book all the furniture before the renovation, and personally feel that it is not necessary.

Nineteen, home appliances enter the market at this time, home appliances should enter the market, the installation of the installation, ready to move in! Twenty, home accessories Home accessories, the last step of home improvement, and have changed from decoration to decoration, including the installation of curtains are home accessories.

As for buying curtains, it is best to book furniture first to avoid style conflict.

Home accessories also include buying some green plants, hanging murals and decorating handicrafts.