Traditional Culture Encyclopedia - Photography and portraiture - Six steps of home improvement+precautions

Six steps of home improvement+precautions

The necessity of being familiar with the decoration process.

1, understand the decoration process and prevent the negligence of some important links.

2. Under the condition of being familiar with the decoration process, related decoration matters can be carried out in an orderly manner, and no one will delay the construction period and fail to deliver on time.

3. Reduce unnecessary expenses.

Six steps in the decoration process

I. Planning and design stage

1 Field measurement is a crucial step in decoration.

2 compass for planning and designing new home decoration: effect drawing, construction drawing (including plan drawing, demolition drawing, light bitmap, elevation drawing, hydropower drawing, section drawing and cut-off drawing).

3. Determine the contractor's comprehensive comparison of products, prices, construction and services, and choose one.

Second, the demolition and hydropower transformation

Remember not to move the load-bearing wall when tearing it down.

5 The wall masonry joints between the old and new walls must be hung with steel wires.

6 hydropower positioning determine the location of sockets, faucets, toilets, floor drains, shower partitions, washing machines and air conditioners.

7 Pay-off slotting 720 degrees 3D Pay-off.

8 wiring, conduit and box lighting circuit 1.5 square meters, electrical socket 4 square meters, high-power electrical appliances 6 square meters.

It is the first choice to lay PPR antibacterial nanotubes in water pipes.

10 water pipe pressure test.

1 1 Take a picture of the water circuit diagram or take a picture to record the location of the water and electricity connection.

Third, the mason construction stage

12 waterproof 48 hours closed water test.

13 tile placement is a chore, and you need to find a good master.

14 when laying walls and tiles, or after leveling, contact the main material merchants such as doors and wardrobes to re-measure. After the kitchen wall is tiled, contact the cabinet merchant to re-measure.

15 Pay attention to the installation of floor drain. Floor drains can be divided into ordinary floor drains and washing machine floor drains.

16 threshold installation toilet door cover pressing threshold technology.

17 floor leveling, you must know the thickness of the floor plus the damp-proof pad, and measure the drop of each room.

Fourth, the woodworking construction stage

18 On-site woodworking disclosure Complex woodworking modeling needs to be determined on site.

19 ceiling gypsum board The ceiling should have two layers of gypsum board.

The 20 cabinet boards shall be EO grade on site.

Five, paint construction stage

2 1 brush the wall to fix the cement wool wall or the original wall completely eradicated, and brush the wall to fix it.

Twenty-two batches of gypsum were preliminarily treated with the angle of yin and yang and the leveling of the top surface.

23 The first putty can only be plastered after the gypsum is dry.

24 the second time putty leveling metope.

The sand wall needs to be polished to a level.

Close the doors and windows 48 hours after wallpaper construction.

27 latex paint construction remember, putty engineering acceptance before brushing.

Six, the completion settlement stage

It is very important to standardize the installation of lamps and ceilings.

29 cabinets are installed with three-point products and seven-point products.

For floor installation, it is recommended to enter the site independently for floor construction, which is convenient for cleaning.

3 1 Hardware for wooden door installation must be purchased before wooden door installation.

After the toilet is installed, the water pipe is pressed again for testing.

Switch sockets should be arranged reasonably according to the plane layout.

34 Hardware Installation The installation of curtain rod involves punching holes, and hardware installation, including towel rack and mirror, should be completed before cleaning.

Pay attention to check the jointing of doors and windows, drawers and cabinets.

36 furniture comes into play. Soft furniture can be installed.

The control of formaldehyde in ventilation should start with the selection of materials.

The answer comes from Mouton Design Office, a user with a good life. For more decoration strategies and home experience, welcome to visit the good living APP.