What photos should be included in the architectural image data, and what necessary photos are there, which will affect the audit ability of the data and make it difficult to pass?

You'd better find a professional company to do it for you. 0.5 yuan approved per square meter. If you do it yourself, you should start with the original landform. There is no need to take a board to write down the axis of the parts when you take pictures. Details are as follows:

Contents and requirements of construction project filing in audio-visual archives.

A, the construction project audio-visual archives archive content.

The original appearance, foundation, concealment, main body, roof, quality accident and new appearance after completion of the project are the necessary contents of audio-visual archives data archiving. According to the actual situation of the project, the shooting content can be increased by itself.

Second, the construction project audio-visual archives filing requirements

1. audio-visual archives (including engineering photos, audio-visual materials, etc. ) If it is generally required to be handed over for filing, it should be able to truly and comprehensively reflect the project appearance and construction situation, and the necessary contents should be complete with explanations.

2, photo file filing requirements

(1) The photos should have a clear theme, a clear and complete picture, accurate color reproduction and no obvious distortion of the subject;

(2) The photos should be developed into 4R or 4D color photos;

(3) Digital photos should be submitted to the electronic version at the same time, and digital cameras with no less than 4 million pixels should be used as far as possible;

(4) When sorting out each photo, it should indicate: shooting content, time, place, person, photographer, etc.

Audio-visual archives's archive contents of the construction project.

A, construction engineering

(a) the bidding activities of the project (including survey and design, construction, supervision bidding, project legal person bidding, bidding agency); Signing ceremony of important contracts (including survey and design, construction, supervision bidding, project legal person bidding, bidding agent).

(2) The original appearance of the site before commencement

1, the original buildings and structures shall be demolished before foundation trench excavation.

2, the surrounding environment of the construction site, engineering model, sand table and renderings.

3. Foundation laying ceremony and leadership inspection.

4. Engineering and hydrogeological exploration.

5. Important meetings related to the project.

(3) Foundation and Foundation Division Project

1, foundation positioning and setting-out, and line inspection by planning department.

2. Foundation treatment.

3. Foundation excavation, support and trench inspection.

4, pile foundation construction and acceptance.

5. Construction and acceptance of foundation cushion.

6, underground waterproof construction and acceptance.

7. Construction and acceptance of protective layer.

8, steel bar, template construction and acceptance.

9, foundation masonry construction and acceptance.

10, concrete construction.

(1) witness sampling, block making and maintenance, slump detection, vibrating, leveling and plastering of on-site mixing concrete.

(2) The visual quality of concrete molding.

(3) Manufacture and retention of test blocks under the same conditions.

(4) Temperature measurement of mass concrete.

1 1. Construction and acceptance of backfill soil inside and outside the foundation.

12, acceptance of foundation division project.

(4) the main branch project

1. Check the positioning and inspection of the first floor, standard floor, equipment floor and conversion floor according to the drawings.

2, the overall construction progress of the construction site.

3. Construction and acceptance of concealed works.

4. Installation, acceptance and visa of tie rods for the main project.

5, each column, shear wall, floor reinforcement acceptance.

6. Construction and acceptance of electrical embedded pipelines in various parts of each floor.

7. For concrete construction, refer to Article 9 of Foundation and Foundation Division Project.

8, each layer of wall brick construction and acceptance.

9, indoor ground construction waterproof requirements, water storage test and acceptance.

(5) Roof Division Project

1, roof leveling layer construction and acceptance.

2, roof insulation construction and acceptance.

3. Waterproof and water storage test and acceptance of roof center.

(six) building water supply, drainage and other pipeline projects

1, valve (cleaning) test flow and acceptance.

2, water supply pipeline pressure test, cleaning test process and acceptance.

3, indoor drainage pipeline test and acceptance.

4, outdoor drainage pipeline test and acceptance.

5, heating pipe water, pressure test records and acceptance.

6, indoor fire pipeline water, pressure test and acceptance.

(7) Building electrical engineering

1, conduit threading and distribution box (panel) construction.

2, electrical engineering insulation resistance, grounding resistance test and acceptance.

3, electrical lighting and equipment debugging and acceptance.

4. Construction, test and acceptance of lightning protection system (shooting in the middle of foundation and main body construction).

(eight) air conditioning and ventilation pipeline engineering

1, air conditioning, ventilation, computer room equipment and related equipment enter the site for unpacking acceptance.

2, air conditioning engineering pipeline slope detection, water pressure test.

3, air conditioning engineering system debugging and acceptance.

4, ventilation pipe installation and acceptance.

5, ventilation pipes, wind speed, wind pressure detection and acceptance.

(9) Construction and acceptance of elevator and equipment engineering and installation engineering.

(10) Decoration project

1, external wall insulation construction and acceptance.

2, external wall construction and acceptance.

3, indoor construction and acceptance.

4. Installation, construction and acceptance of doors and windows.

(1 1) outdoor pipeline

1, outdoor general layout.

2. Outdoor water supply, drainage and fire fighting.

3. Outdoor heating and gas.

4. Outdoor electricity, telecommunications and television.

(12) project completion stage

1, project completion acceptance ceremony.

2, the whole picture after the completion of the project "

3, the use of new materials, new technologies, new processes and other applications.

4, the construction site accidents and treatment.

Second, the steel structure engineering

(1) refers to items (1) and (2) of the construction project in the project preparation stage.

(2) Construction stage

1. Foundation construction: steel structure anchor bolts are embedded.

2. Installation of steel structure columns and beams: connection between steel structure beams, columns and beams.

3. Installation of steel structure maintenance system: connection between enclosure structure and main structure.

4, steel structure coating (rust removal, anti-corrosion), waterproof and fireproof materials.

5. On-site weld flaw detection of steel structure.

6. Concrete pouring in steel structure columns.

7. Roof waterproofing system.

(3) Refer to item (12) at the completion stage of construction in progress.