Traditional Culture Encyclopedia - Photography and portraiture - What is the procedure for the completion and acceptance of surveying and mapping projects?

What is the procedure for the completion and acceptance of surveying and mapping projects?

1. According to the scale and complexity of the construction project (project), the acceptance of the whole construction project (project) can be divided into two stages: preliminary acceptance and completion acceptance. Large and complex construction projects (projects) should be initially inspected, and then all construction projects (projects) should be completed and accepted. Smaller and simpler projects (projects) can be accepted at one time.

2. Before the completion and acceptance of the construction project (project), the construction unit shall organize the construction, design, use and other relevant units to conduct preliminary inspection. Before the preliminary inspection, the construction unit shall sort out the documents and technical data in accordance with state regulations and submit the completion report to the construction unit. After receiving the report, the construction unit shall organize the preliminary inspection in time.

3. All construction projects (projects) are completed, which meet the design requirements after the acceptance of each single project, and have the necessary documents such as completion drawings, final accounts and project summary. The competent department of the project (project) or the construction unit shall submit an application report for completion acceptance to the unit responsible for acceptance.