Traditional Culture Encyclopedia - Photography and portraiture - The planning scheme of the latest popular company spring outing
The planning scheme of the latest popular company spring outing
The latest popular company spring outing planning scheme? The sun is shining and spring is blooming. In order to enrich employees' spare time life, enjoy their body and mind, at the same time, enhance communication between departments and strengthen team cohesion, the company specially organized this spring outing. The relevant matters are hereby notified as follows:
? First, the theme of the event: into the spring, embrace green; Get close to nature and feel life!
? 2. Location: xx Mountain Natural Scenic Area (the junction of xx District and xx District)
? Three. Activity time: 20xx year x month x day (Saturday)
? Four. Participants: all employees
? V. Forms of activities
? 1. This activity is divided into mountaineering group and photography group. After arriving at the activity scenic spot, the mountaineering team climbed to the top from the east side of the scenic spot, and the photography team climbed to the top by bus from the west side of the scenic spot. After the two groups met at the top of the mountain, they drove down the mountain.
? 2. During the activity, everyone can pick up the shooting equipment in their hands, record the beautiful scenery they enjoy at any time, seize the unforgettable moment, and send it to the mailbox of * * * within one week after the activity. We will select excellent works for display.
? Sixth, the registration method
? Please register at * * before going to work on Wednesday (April 8, 20xx) and choose the activity group.
? Seven. Activity arrangement
? From 08: 00 to 09: 00, meet at the main entrance and take a bus to the scenic spot.
? At 09:00- 12:00, the mountaineering team got off from the east side of the scenic spot to reach the summit, and the photography team continued to drive to the west side of the scenic spot.
? 12: 30 ——13: 00 All personnel gather at the stone tablet of the Rose Garden in Miaofeng Mountain on the top of the mountain, and take a bus down from the west side of the scenic spot.
? 13: 00- 15: 00 lunch
? 15:00— 16:00, and return afterwards.
? Eight. cost budgeting
? Nine, warm tips
? 1.xx The elevation of the main peak is1276m, and the whole climbing process takes about 2-3 hours. Please choose a mountaineering team or a photography team according to your physical condition.
? 2. Please meet at the main entrance of the company at 08:00 am on April 1 1 Saturday.
? To ensure the safety of activities, please wear sports shoes and casual clothes. When the temperature at the top of the mountain is low, please add clothes as appropriate.
? 4. During the activity, we must pay attention to forest fire prevention, prohibit smoking and littering, and pay attention to protecting the ecological environment of the scenic spot.
? The planning scheme of the latest popular company spring outing
? April is a good time to travel, in order to enrich employees' spare time, relieve work pressure, enhance communication between departments and enhance cohesion. The general manager's office and the administrative logistics department jointly organize a spring outing, and the specific notice is as follows:
? I time: 20xx year x month x day (tentative)
? 2. Location: xxxx Scenic Area (4a level)
? Three. Organizer: General Manager's Office
? Undertaking department: trade union, administrative logistics department and marketing department.
? Fourth, the registration method
? 1. Activity target: all employees of xx.
? 2. Registration method: Please send the information of participants to the office of General Manager xx by department before going to work.
? V. Organization of activities
? (A), the activity process
? Meet at the company at eight.
? At 8: 30, count the people, prepare the materials, and start on time.
? 9:00- 12:00, arrange activities according to the scheduled route and time.
? 12:00- 13:00 Chinese food
? 13:00- 17:30 to carry out activities according to the scheduled route and time.
? 17:30, the event is over and the counting staff returns.
? (2), organizational arrangements
? 1, general coordinator: xx, responsible for the overall coordination and liaison of all groups.
? 2. Logistics Service Group: xx, responsible for on-site service and logistics.
? 3. Publicity: xx, responsible for making posters, taking photos and making company flags.
? 4. On-site coordination: xx, responsible for assisting and coordinating on-site work and maintaining order.
? 5. Activity organization: xx, responsible for assisting in organizing collective activities.
? 6. Pre-inspection: xx, responsible for determining the tour route and catering arrangements.
? (3) Preparation before the activity
? 1. Publicity materials: posters, company flags, cameras, etc.
? 2. Prepare some bottled water, snacks and fruits.
? 3. Prepare simple medical emergency supplies: band-aid, gauze, hydrogen peroxide, cotton swabs, etc.
? 4, on-site inspection tour route, determine the catering arrangements and venues.
? (4) Route arrangement: to be determined.
? (5) Group activities (to be determined)
? Six, the cost budget (omitted)
? Seven, matters needing attention
? 1, pay attention to protecting the environment and not littering.
? The group is holding a photo contest, and interested colleagues can bring their cameras.
? Remind everyone that it is best to wear clothes and shoes suitable for outdoor activities when participating in activities.
? Please obey the command, pay attention to safety, watch and play according to the designated route, and don't leave the team without authorization.
? In case of rain or other emergency, the activity will be postponed until next weekend.
? General Manager's Office
? Xx year xx month xx day
The latest popular company spring outing planning scheme? I. Activity time: March 27th and 28th, 20xx (the time will be adjusted according to the weather).
? 2. Location: xx Ecological Farm and xx (choose one of the two places).
? Third, personnel arrangement: two groups of personnel, take the initiative to register and choose the land first, and then adjust the personnel.
? Fourth, the person in charge of the spring outing: xx, xx, xx and the store managers and field directors.
? Xx leads the team, mainly responsible for the spring outing route, rest and meal time, and boat arrangement to ensure the safety, order and fun of the spring outing;
? Xx, xx presided over the coordination, mainly responsible for personnel's goods ordering, vehicle reservation, food arrangement, photo games, etc.
? V. Activity preparation: 1, one bus; 2. Banner: Spring outing for outstanding employees of basket carriers (and placards of basket carriers); 3. Drinking water; 4. Speakers; 5. camera.
? Activity arrangement of intransitive verbs:
? (1) Spring outing on March 27th, xx:
? At 8: 30 in the morning, people who signed up for xx spring outing gathered at Ginza Store in Xi Du, ready to take the bus-
? Set off at 8: 40 a.m. on time for Tangxi, xx.
? At about 10: 00 in the morning, go to Xutangxi scenic spot in xx and take a boat trip to one of Xutangxi scenic spots.
? Visit xx surrender workshop at 1 1: 30 in the morning.
? At noon 12: 00, eat at the roadside special xx duck restaurant (or arrange to eat at Fengyuqiao).
? In the afternoon 14: 00, we took photos of Jiangyou Yufeng Bridge, Drum Tower and Tianhou Palace.
? In the afternoon 16: 00, Jihe returned to the company by bus.
? (II) Spring outing arrangement for xx Minzhuang on March 28th:
? At 9: 00 a.m., the people who signed up for the xx Ping Spring Tour will gather at Xinmin Restaurant, ready to take the shuttle bus that leaves for the farm spring tour at 9: 00 a.m.10 on time.
? Arrive at the farm at 10: 00 in the morning and organize a visit to the farm and the farm.
? 65438+ After 02: 30 am, organize barbecue and outward bound training (treasure hunt in groups).
? Visit Jingping Ancient Village at 0/4: 00 pm/KLOC-.
? In the afternoon 16: 00, Jihe returned to the company by bus.
? Seven, spring outing personnel matters needing attention:
? 1. The list of participants shall be arranged by the person in charge of each store as a whole (personnel from the headquarters office, farm and Xincai R&D base shall register themselves), and shall be submitted in writing to the Marketing Planning Department of the headquarters office before March 20th.
? 2. Those who take part in the spring outing can bring friends, and the cost is aa. The number of friends they bring should be reported to the planning department before March 25th.
? 3. All spring outing personnel should try to wear work clothes, travel shoes or shoes that are easy to climb mountains, and wear sun protection caps to participate in activities according to the weather conditions.
? 4. People who feel unwell or carsick in hot weather should inform the person in charge in advance.
? 5, spring outing personnel in the tour activities should be divided into (breeding group, Baoshan group, mixed group) to carry out activities, the team leader by the manager or foreman. Pay attention to personnel safety during the tour. In case of emergency, please call the relevant staff.
- Previous article:What do you recommend for ps4 game ranking?
- Next article:What kinds of light are commonly used in portrait photography?
- Related articles
- Does the photography club need to buy its own camera?
- Insect feed platform infringement was shut down?
- There are several grasslands on Bashang. Where are they?
- What about Shaoxing Shangyu Yida Photography Equipment Co., Ltd.?
- Which platform is good for renting Leica cameras?
- Crystal's daughter made a thorough attack and won public appreciation for drawing for the Winter Olympics. What kind of environment did she grow up in?
- Address of all universities for the aged in Tianjin.
- The Lost World Photographer
- Yinren artistic photography
- What is the full focus shooting method? How to realize D90?