Traditional Culture Encyclopedia - Photography and portraiture - What is the construction process of office building decoration?
What is the construction process of office building decoration?
What is the construction process of office building decoration?
Prepare 1 in advance for field measurement.
This is what we often call measuring room. In the early design, we must make detailed measurements, mainly including: 1), and make clear the areas involved in the decoration process: functional areas, as well as the sizes and positions of windows and walls; 2) Determine the main dimensions: sewer pipes, vents, decorative walls, load-bearing walls, beams, etc.
2. Strategic design
After the evaluation, we need to make a comprehensive analysis with the owner. The new office environment will enhance the brand image, empower employees and change the way we work. Strategic design is mainly to understand the key difficulties, challenges and opportunities of the success or failure of the project. Focus on the following points: 1), overall planning; 2) program design; 3) Spatial planning; 4) Feasibility analysis; 5) Conceptual design. Designing an ideal modern office space should not only meet the future business development, let employees have the best feeling and performance, but also pay attention to the unique cultural experience of the enterprise.
Second, the scheme design 1, graphic design: the office graphic design includes the office functional division, spatial structure, office furniture location, etc. At this time, customers should communicate well with designers, express their ideas and finally reach a consensus.
2. Rendering design: Rendering is a form for designers to express their creativity, and it is a faithful presentation of many factors such as object shape, structure, color and texture. It truly reflects the creativity of designers, thus communicating the visual language between designers and viewers, and making people more clearly understand the relationship between various functions, structures, materials and combinations. After the renderings are designed, the graphic design is determined. Of course, the renderings don't have to be there, but the graphic design must be there.
3. Budget quotation: After designing the preliminary scheme, the designer gives a budget quotation and discusses the preliminary scheme with the customer; The customer reads the budget quotation under the guidance of the designer and puts forward suggestions for revision.
4. Architectural design: After the user reaches the basic intention of the design scheme, the designer designs and draws the later construction drawings, node details and renderings.
Three. Delivery of construction 1, delivery of construction
Construction site description and construction disclosure: generally, relevant matters should be done before the construction begins. At this time, designers, customers and project managers need to wait at the construction site and finally communicate design and construction matters.
2. Site supervision
As a professional public equipment company, construction is the top priority of the whole decoration project. The company must do a good job of supervision and grasp the progress and quality of the project in real time. Every day, professionals carry out engineering inspection to fully control the engineering quality. Find and solve problems in time to ensure that the project is completed on time and with good quality.
Four, after the completion of the project acceptance, to do a good job of project acceptance, to be qualified rear can be put into use.
The above is the whole process of office design and decoration, and perfect after-sales service is the most reassuring guarantee for company owners.
- Related articles
- What did the girl do with what you gave her after she broke up with you?
- Notes on the Red Marathon Around Lake Zhangze in Changzhi
- How about the Academy of Fine Arts of Langfang Normal University?
- Dreaming of my mother taking pictures of me.
- Eat small fish, the anti-swimming cat?
- 20 18 is Tomb-Sweeping Day suitable for going to Chengdu? Is Chengdu crowded, Tomb-Sweeping Day?
- How does the surveillance camera connect to the computer monitor?
- Guandu District Company Registration: 20 18 Fill in the matters needing attention in the business scope of the registered company.
- Junior high school students drop out of school. What skills should they learn?
- How to shoot with interval timing in time-lapse photography