Traditional Culture Encyclopedia - Tourist attractions - Unscramble center fishing port center fishing port

Unscramble center fishing port center fishing port

The fishing port project in the center of the scope is located in the former site of Gaojiabao Village, Yingcheng Town, Hangu District, with Kim Expressway in the north, Central Avenue in the west and Haibin Avenue passing through the port. The planned area is 18 km2, and it is planned as "one port, one city". The planned area of "one city" on land is 10 square kilometer, mainly for industrial areas and residential areas. The planned area of "one port" in the sea area is 8 square kilometers, which is divided into working port area and leisure port area. Among them, there are four planned berths 14 in the offshore operation port area, with an annual throughput of170,000 tons; The leisure port area can accommodate 1000 yachts.

focus

1, North Aquatic Products Processing and Distribution Center

Based on Beijing and Tianjin, radiating northwest, relying on the supporting advantages of the central fishing port and the rear land park, we will build an integrated logistics supply chain from the entry of refrigerated ships to the consumption terminal, introduce strategic partners, and build an aquatic product logistics platform. The investment promotion work establishes the investment promotion direction with Guangdong, Fujian, Jiangsu, Zhejiang and Taiwanese businessmen as incremental logistics; In order to attract aquatic products traders in Beijing, Tianjin and the hinterland of northwest China, the existing aquatic products supply chain should be integrated.

2. Northern Yacht Industry Center

The center makes full use of the leisure harbor area 1000 yacht berths, provides necessary water conditions for yacht launching, sea trial, berthing and transportation, cultivates the yacht consumption market radiating Beijing-Tianjin-Hebei, and forms a yacht industry cluster with yacht manufacturing, yacht exhibition and yacht club developing simultaneously.

3. "2+4" industrial system

Focusing on the industrial orientation of the "two centers", the central fishing port project will vigorously develop the "port logistics industry", upgrade the "tourism destination industry", develop the "entrepreneur club industry", yacht training and the tertiary industry of 4S shops, and comprehensively build a "2+4" industrial system.

target

The central fishing port project closely focuses on the industrial positioning of "Northern Aquatic Products Processing and Distribution Center" and "Northern Yacht Industry Center", and conducts in-depth research on related formats in conjunction with top consulting institutions at home and abroad, and makes industrial zoning layout for the whole park. It will develop into a modern theme economic zone with aquatic products processing and distribution, yacht industry as the mainstay, and port logistics and leisure tourism related industries competing for development.

progress

The central fishing port project officially started in July 2007. At the beginning of the construction, the construction goal of "reclamation in one year, reclamation in two years, port in three years and taking shape in early August" was established. In 2007, it took six months to complete the construction of 10 km breakwater, and land reclamation was realized that year. By the end of 2008, the dredging of the harbor basin180,000 cubic meters and land reclamation of 3.5 square kilometers were completed as planned, and the "two-year land reclamation" plan was realized. In the year when the port was built, the channel dredging was completed, six 5,000-ton wharves were built, and the soft foundation of 3.5 square kilometers was all reinforced. The total length of the main road was about 2 1.7 kilometers, the total length of the drainage pipe network was 55.2 kilometers, and the earthwork was 9 million cubic meters. After land and sea traffic is opened, the central fishing port will take shape according to the plan.