Luoyang Yongning Building, the construction start time is to be determined.

Tender Announcement for Luoning County Yongning Building Engineering Design Service Project

1. Bidding Conditions

Luoning County Yongning Building Engineering Design Service Project has been approved and implemented by relevant departments. The preliminary work is now ready and the bidding conditions are met. China Economic International Tendering Group Co., Ltd. was entrusted by Luoning Cultural Tourism Development Group Co., Ltd. to conduct a domestic public bidding for the project. The relevant bidding matters are now announced as follows:

II. Project Overview and Main Bidding Contents

1 Project name: Yongning Building Engineering Design Service Project

2 Bidding number: CEITCI-HA-ZCFW-161110

3 Project overview: Yongning Building, Luoning County Located in Luoning County, Luoyang City, Henan Province. It is adjacent to Xingning Road in the north and has existing construction land in the east, west and south directions. This project is the original site reconstruction project of Yongning Building, with a planned land area of ??10043.2_

4 Bidding scope: architectural scheme design, construction drawing design, civil air defense engineering design

5 Total project investment: 143 million Yuan

6 Source of funds: self-raised funds;

7 Bidding requirements: Bidders should provide a complete set of planning and individual building design plans (drawings, renderings, designs) in accordance with the requirements of the bidding documents Note), the depth of the plan and the content of the drawings should meet the approval requirements of the Luoning planning department. As an important part of the bidding document, the design plan participates in the bid evaluation together with the commercial quotation and other technical parts. There will be no compensation fee for unsuccessful bidders in this tender. The specific architectural design brief is attached.

8 Design cycle: Provide the planning department with the overall plan and architectural design plan modified in accordance with Party A’s opinions within fifteen calendar days from the effective date of the contract, and complete the construction drawing design and civil air defense within forty-five calendar days after the plan is approved. Engineering design. China Procurement and Recruitment Network

9 Design depth: Various economic and technical indicators should meet the requirements of Luoyang City’s urban construction planning management technical regulations and be determined in conjunction with the specific requirements of the Yongning Building project.

10 Bid Section Division: This project is divided into one bidding section.