Traditional Culture Encyclopedia - Travel guide - Where does the Jurong Station high-speed rail lead?

Where does the Jurong Station high-speed rail lead?

Jurong Station High-speed Railway leads to Anchang, Nanning, Nanjing, which can directly reach Maanshan, Wuhu, Anqing and other cities.

In addition, Jurong can also switch to Ning 'an Line in Anchang, Nanning, Nanjing by taking the high-speed railway along the Yangtze River in the south, and go directly to Maanshan, Wuhu and Anqing in the west. In addition, Nanjing Nanjing Shanghai Market can also go directly to the Beijing-Shanghai high-speed railway (in the direction of Chuzhou) and go directly to cities such as Bengbu, Xuzhou, Jinan, Tianjin and Beijing in the north. In a word, Jurong Station high-speed rail can easily go to Nanjing, Nanning, Hangzhou, Nanjing and Shanghai.

Jurong Station is the station under the jurisdiction of China Railway Shanghai Bureau Group Co., Ltd., and Jurong Station is the intermediate station of Shanghai-Nanjing high-speed railway along the Yangtze River. Located in the south of jurong city city, Jurong Station House, an inter-city railway along the south Yangtze River, is an off-line passenger station with a building area of 15, square meters, two floors above ground and one underground, and the scale of the station is 2 sets and 6 lines.

History:

In early October p>221, Jurong Station entered the site for construction. In February, 222, the supporting project of the North-South Plaza officially started construction, and the foundation of the field leveling and parking lot in the project area, the main structure of the underground passage of S6 Jurong Station No.3 exit and the main structure of the transfer center have been completed, the foundation construction of the South Plaza has been completed, and the overall design of the North-South Plaza has been completed by 4%.

on April 28th, Jurong Station station building became the first station building with concrete structure capped. On December 3rd, the main structure of the station building was completely completed, and the indoor ceiling decoration of the station building was 1%.

1% of the main structure, 1% of the roof construction, 8% of the structural column keel construction of the waiting room, 7% of the curtain wall construction, 4% of the dry hanging stone wall construction of the exit hall, and the external wall and indoor decoration construction are under way.

above content reference: Baidu Encyclopedia-Jurong Station