Traditional Culture Encyclopedia - Travel guide - Introduction to the construction of Jingcheng Expressway?

Introduction to the construction of Jingcheng Expressway?

Jing-Cheng Expressway has a total length of 29.1 kilometers, an investment of about 2 billion yuan, and a design speed of 8-1 kilometers per hour. It adopts two-way four-six lanes plus rescue lanes and local escape lanes. Zhongda Consulting made the following introduction to the construction of Jingcheng Expressway.

Stage

Jingcheng Expressway is divided into Beijing section and Hebei section. The Beijing section is divided into three sections and three phases.

Jingcheng Expressway Phase I: It was opened to traffic on October 26th, 22, with a total length of 21km. Starting from Wanghe Bridge on the Fourth Ring Road, it crosses the North River to the north, and intersects with the Fifth Ring Road via Laiyuangying. Cross-city railway, passing through Ruzifang, Huanggang and Shayingying, crossing Qinghe River and Wenyu River and crossing the Sixth Ring Road via Gao Liying;

Jingcheng Expressway Phase II: It was opened to traffic on September 28th, 26, with a total length of 46.7 kilometers. Starting from Gao Liying and ending at Shayugou section, it is designed as a two-way six-lane road with a roadbed width of 35 meters and a speed of 12 kilometers per hour. It passes through Shunyi, Changping, Huairou and Miyun, and intersects with 24 roads above township level, 14 local roads, 15 canals, 3 railways and 1 high-voltage lines.

Beijing-Chengde Expressway Phase III: It was opened to traffic on September 27th, 29. The third phase is connected to Beijing-Hebei border by Shayugou, with a total length of 64.26 kilometers. Connect to the Hebei section of G45 Daguang Expressway.

Hebei section of Jingcheng Expressway: It was completed at the end of 25 and has been opened to traffic, with a total length of 76.6 kilometers. The starting point is Simatai at the junction of Beijing and Hebei, and the end point is Baoshen Temple in Chengde City. It is a four-lane, fully enclosed and fully interchanged expressway. As a part of the national highway G45 Daguang Expressway, it has been renamed as G45 Daguang Expressway.

construction

Chengde is 225 kilometers away from Beijing. Due to the inconvenient transportation, the unique advantages of tourism resources can not be fully exerted. To this end, Chengde City has actively planned expressway projects. After many efforts, on March 26th, 24, the tender for the civil engineering of Beijing-Chengde Expressway was successfully completed, the construction units of 1 blocks were determined, and all the construction agreements, clean government contracts and safety production contracts were signed. After April 5th, various project management departments were set up one after another.

Difficulty

The third-phase project of Jingcheng Expressway, which took two years to build, is located in the northeastern mountainous area of Miyun County, this city, starting from Shayugou in Mujiayu Town, Miyun County, connecting with Jingcheng Phase II, ending at Simatai at the junction of Beijing and Hebei, and connecting with Chengde section of Jingcheng Expressway in Hebei Province, with a total length of 62.7 kilometers. Looking along the expressway, the newly built asphalt road is hidden in the mountains. Beautiful scenery often comes from danger. This winding and magnificent new "Great Wall" is the most difficult section of expressway for survey, design and construction in this city in the past 1 years, and it is also the longest mountain expressway in this city. There are 8 * * * interchanges, 18 bridges and 2 tunnels along the line, of which the tunnel passing through the scenic tourist area of Simatai Ancient Great Wall is 2.2 kilometers long. According to the introduction of Shoufa Group, the third phase of Jingcheng Expressway is a fully-interchanged, fully enclosed and two-way four-lane expressway, in which the subgrade from Shayugou to Simatai is 26 meters wide, with a design speed of 1 kilometers per hour, and the subgrade from Simatai to the city boundary is 24.5 meters wide, with a design speed of 8 kilometers per hour. There are 8 toll stations along the whole line, and each toll station has ETC lanes.

the above is the introduction of zhongda consulting on the construction of Jingcheng expressway. If you want to know more about highways, please pay attention to the architectural knowledge column of Zhongda Consulting.