Traditional Culture Encyclopedia - Travel guide - Which district is Guiyang North Railway Station?

Which district is Guiyang North Railway Station?

Guiyang North Railway Station is located in Guanshan Lake District.

Guiyang North Railway Station is located on the east side of Jiaxiu North Road, Guanshanhu District, Guiyang City, Guizhou Province. Guiyang North Railway Station has a total construction area of ??255,000 square meters; the station has 15 platforms and 28 platform areas. 32 lines.

Guiyang North Railway Station is under the jurisdiction of China Railway Chengdu Bureau Group Co., Ltd. It is a comprehensive transportation hub integrating railway, subway, bus and other transportation modes. It is also the main passenger transportation distribution center in the southwest region. ** *Introducing five intercity lines: Guizhou-Guangzhou, Changzhou-Kunming, Chongqing-Guizhou, Chengdu-Guizhou and Guikai.

Building Scale of Guiyang North Railway Station

As the gateway to the southwest region and the landmark building of Guiyang City, the design of Guiyang North Railway Station uses modern architectural techniques to reflect the theme of "tourist paradise, Guizhou impression" The concept and shape extract the "double eaves" element from Guizhou's unique residential forms, drum towers and flower bridges, and combine it with the "cascading" lines of local landscapes: terraces and waterfalls to outline "Guizhou" with combinations and changes of horizontal lines. impression".

The total construction area of ??the comprehensive project of Guiyang North Railway Station is 255,000 square meters. The station building is 418 meters long, 236 meters wide, and has 3 floors. The projection area of ??the column-free canopy is 82,160 square meters. , the elevated and drop-off platform has a projected area of ??36,172 square meters.

The station building adopts a bridge-building structure. The platform layer carries the rail-bearing structure of the train track, and the elevated waiting layer frame has a standard span length of 24 meters and a width of 21 meters. The commercial mezzanine and the elevated waiting layer column network are not aligned up and down; the entire platform layer uses platform columns without platform, is tall and spacious, and has There are 41 elevators and 75 escalators. There are also barrier-free passages, elevators, toilets, etc. The subway passes below the outbound passage level, and the columns above the tunnel are underpinned by foundation beams.