Baotai Village, Qianshan Township is a remote mountainous village in the westernmost part of xx County. The township government The township unit is also located in our village. The whole village (including the adjacent Xinmin Village) has more than 600 households and more than 4,500 people. Our village is the political, economic, and cultural center of the township. It is also the starting point for mountaineering tours for tourists in the famous Wugong Mountain Scenic Tourist Area.
In 1995, farmers in our village used the form of collective investment and free combination to go to the mountains to use trickling mountain springs and built several small tap water diversion projects of less than 20 tons. In recent years, The water supply temporarily solved the problem of about 50% of the villagers' water supply. However, after the water from the small springs in the mountains was diverted, large areas of rice fields were deserted due to lack of water. At the same time, with the increase in users and the increase in the elevation of new buildings, those small pools It is simply unable to meet the water needs of the people, and the water flow is often cut off due to insufficient water sources. In recent years, most of the new buildings built by farmers have underground fertilizer tanks, and the groundwater has been seriously polluted. A considerable number of farmers in the village still use pumping wells to obtain groundwater. Drinking it will cause great harm to the physical and mental health of the people. Finding new water sources, building standardized and standard tap water plants, and ensuring clean and hygienic tap water for villagers are urgent problems that need to be solved in our village.
Recently, our village organized a group of technical backbones who understand water sources to go up the mountain to search for water sources. They discovered a large-flow, pure mountain spring water on Yanbei Mountain in the north of the village. Samples were taken and tested by superiors, proving that this spring water The water source fully meets drinking water standards. If this mountain spring is diverted and a new water plant is built, after the water plant is completed, the lift will reach 100 meters, and the daily water supply will be tens of thousands of tons. There will be enough water for tens of thousands of people in several nearby villages to drink. () Mountain Chong Thousands of acres of barren farmland can be restored to water supply and cultivated land can be restored.
However, our township is one of the six old areas in the county that is extremely impoverished, and our village is also a well-known extremely impoverished village. The economy in the village is weak. In recent years, activities have been carried out to build civilized villages and towns and new rural areas. Among them, the village's only little funds were used to sort out the drainage system in the village, build cement roads around the village, improve toilets and water supply, build embankments and protect rivers, and other projects. If you want to build a medium-sized water plant, you will have more than enough ambition but not enough energy. The comprehensive water plant to be built according to the preliminary budget, apart from the investment in labor and part of the financing, is still short of nearly one million yuan. "Ask where the canal can be so clear, only living water can come from the source." When the living water comes, all of us in the village must repay it with springs. We hope that your bureau can approve and approve the above report, and we hope to receive your strong support!
Baotai Village Committee of Qianshan Township, xx County
How to write a fund application report, fund application report 2
xx Provincial Immigration Office:
< p> Tangjia Village Group of Wuxi Village Committee, Dianxia Town, Zhangshu City is located in a remote mountainous area at the junction of Zhangshu City and Xingan County, 15 kilometers away from the market town. The whole village has a population of 128 people. In 1957, due to the construction of Zhongyu Reservoir, the villagers of this village group moved from their original residence to the current location. The current residence is located in a depression surrounded by mountains on three sides. The mountains are circuitous, traffic is blocked, and the only village road connected to the outside world is full of potholes. On rainy days, it becomes muddy, making it very inconvenient for villagers to travel, seriously affecting the production and life of local people. In order to solve the problem of travel difficulties in the village, after collective discussion by all the villagers in the village group, it was decided that the villagers would raise funds to build a cement road into the village. However, because the road mileage is 1.5 kilometers, public financing is very limited, and the village collective financial resources are also very weak and have no ability. To shoulder such a large sum of money, even with corresponding financial support at the town and town levels, there is still a considerable funding gap. Therefore, the road construction plan was shelved for a time. In order to realize the long-cherished wish of generations of people in the village and completely solve the problem of people’s travel difficulties, the People’s Government of Dianxia Town, Zhangshu City hereby applies to the Provincial Immigration Office, imploring the leaders of the Provincial Immigration Office to consider the actual situation of the village and help solve the problem of 300,000 yuan of funds to harden the village. Entering the village road, I hope the leaders will approve it!This is reported.
Applicant unit:
Application date:
How to write a fund application report, fund application report 3
County Finance Bureau:
p>
XXX County Yinhewan Agricultural Professional Plantation is located in Changjingtou and Beixianquan Village, our township. The project is planned to cover an area of ??1.47 square kilometers. The plantation plans to build a sustainable agricultural industrialization circular economy project. The project focuses on urban and rural integrated construction such as a green seedling base, high-quality dry and fresh fruit planting demonstrations, characteristic breeding demonstrations, facility agriculture, agricultural vacation, leisure and sightseeing, and comprehensive energy development and utilization. , is planned to be completed in three to five years. The construction of the project will be characterized by efficient use of resources and environmental friendliness, with the goal of a circular agricultural industry project with green and ecological sustainable development.
The construction of the project will also link the primary, secondary and tertiary industrialization chains, thereby creating a harmonious agricultural ecological system, promoting the development of agricultural industrialization in the region, increasing farmers' income and building a new socialist economy. Rural areas play a very good leading role and have far-reaching social significance.
In this year’s farmland water conservancy construction, the professional plantation has transferred 2,200 acres of land in Changjingtou, Beixianquan and Shuiquanzhuang villages through the transfer of land contract management rights, and built 2 new reservoirs and paved roads. The water diversion pipeline is 4,000 meters long, 100 solar greenhouses have been built, the supporting pipe network is more than 8,000 meters, and the depth of the newly drilled well has reached 380 meters. So far, the total investment in the project has reached more than 5 million yuan. The company has raised more than 3 million yuan of self-funded funds, and there are still 2 million yuan left. There is a funding gap of RMB 1,000, and we sincerely request the superior departments to provide financial support.
How to write a fund application report, fund application report 4
Leader of Haixing County Water Conservancy Bureau:
In order to completely solve the poor drainage in Gaomiao Village, Zhaomaotao Town, To change the backwardness of farmland water conservancy facilities, at the request of all villagers, our village party branch and village committee decided to make great efforts to solve this problem. Dredge pits and ponds and dig drainage ditches. Due to the large amount of work, our village has very difficult financial resources and lacks construction funds. We sincerely request the higher authorities to provide financial support.
1. Necessity of project construction
Gaomiao Village, Zhaomaotao Town, currently has more than 2,400 acres of farmland. The overall terrain of the village is low-lying. There is a lack of pits and ponds in the village. The ditches outside the village are blocked and farmland drainage is poor. For a long time, agricultural production has relied on the weather, causing waterlogging when it rains and no harvests during drought. It has seriously affected the production and life of the masses and wasted land resources. It is imperative to make great efforts to strengthen the construction of farmland water conservancy facilities and completely solve this constraint on production development. In addition, one village is connected and every village is connected. The success of the project construction will undoubtedly lead the surrounding people to change their thinking, increase their enthusiasm for production, and jointly develop production.
2. Content and scale of project construction
The ditch to be excavated is 3,500 meters long from north to south, with an upper opening of 10 meters, a lower opening of 3 meters, and a depth of 2.7 meters. The total amount of earthwork 61,425 cubic meters; the small ditch on the west side of the highway is 495 meters long, with an upper opening of 7 meters, a lower opening of 2 meters, and a depth of 2 meters, with a total earth volume of 4,455 cubic meters; the ditch on the east side of the highway is 1,800 meters long, with an upper opening of 8 meters and a lower opening of 3 meters. It is 2.5 meters deep, with a total earthwork volume of 24,750 cubic meters; the ditch west of Cunbei Road is 900 meters long, with an upper opening of 5 meters, a lower opening of 1.5 meters, and a depth of 1.5 meters, with a total earthwork volume of 4,387 cubic meters; the unit price of the above earthwork volume is 2.5 yuan per cubic meter ; Another reservoir will be excavated, with an area of ??100 meters × 100 meters × 3.5 meters, a total earthwork volume of 35,000 cubic meters, and a unit price of 6.5 yuan per cubic meter.
3. Construction location and implementation progress
Construction location: See the project plan for details
Implementation progress: It is expected to be completed before September
< p> 4. Funding estimate and fund raising(1) Total project investment estimate (see attached table)
Total project investment estimate: 4650.425 million yuan.
(2) Funding plan
In order to ensure the smooth implementation of the project, we sincerely request the superior departments to support the raising of 400,000 yuan in funds. The remaining shortfall will be financed by our village's own loans. We strive to successfully complete this project that benefits the people before the flood season.
How to write a fund application report, fund application report 5
Banner Education Bureau:
In order to effectively implement the superior's instructions on running local teacher training institutions and promote the grassroots The spirit of instruction to comprehensively improve teachers’ professional abilities and comprehensive qualities. It is also for our Keyou Zhongqi Teacher Training School to meet the new regulations and new requirements put forward by the training work in the new era. Then strengthen the training of principals and teachers, improve the effectiveness of principal training and teacher training, and promote the overall improvement of the comprehensive quality of the principals and teachers of primary and secondary schools in our banner. At the same time, it is also to prepare for the evaluation activities of the Inner Mongolia Autonomous Region on the running conditions of banner and county-level teacher training institutions. Our Keyou Zhongqi Teacher Training School has really conducted a comprehensive and careful review and verification of various software and hardware facilities in our school.
After self-evaluation, we believe that our school, from the leadership team to the majority of employees, has a high enthusiasm for work, a correct work attitude, and a harmonious relationship between cadres and the masses. Able to work hard to complete their work under the existing school conditions and achieve certain results. In other words, our software construction requirements are not much different from those of our superiors. As long as we continue to work hard, we can reach excellent standards in this software construction evaluation. However, there is a big gap between the hardware construction of our school and the evaluation standards. According to the instructions from our superiors and the standards of this evaluation, we now need to strengthen the construction of school hardware.
Dear leader, practical school facilities are a necessary condition for implementing training. We may have passion and courage, but if we lack the necessary hardware facilities, we will not be able to achieve the ideal training goals, nor will we be able to successfully complete the training tasks, let alone enter the ranks of qualified educational institutions. In order to enable our school to successfully pass the assessment and acceptance of the autonomous region, to promote the vigorous development of basic education in the entire banner, to enhance the status and visibility of Keyou Middle Banner in Xing'an League and even Inner Mongolia as a whole, and to effectively implement the superior's instructions on strengthening the banner and county In the spirit of the instructions for the construction of superior teacher training institutions, we specially submit the above application to the superior leaders and hope that the superior leaders will approve it.
xx Zhongqi Teacher Training School
December 21, 20xx
How to write a fund application report, fund application report 6
xx Municipal Transportation Bureau:
The x town management committee currently has 4 villages, 1 neighborhood committee, and 82 kilometers of village-level roads. However, the village-level roads have not yet formed a loop, and the quality of the roads is not high. It is not smooth and has been restricting rural economic and social development, affecting the pace of new rural construction and the tourism development of xx town.
According to the overall agricultural development plan of xx City, a kiwi fruit base of 30,000 acres will be built in xx Town, and Yanzi Village and Toudao Village will be built as key kiwi fruit development areas. In order to speed up the construction process of the 30,000 acres of kiwi fruit project, completely solve farmers’ travel difficulties, promote local people to increase their income and become rich, and lay a solid foundation for the country’s next round of rural road “smooth projects”.
According to the construction plan, it is planned to reconstruct the ring road from Toudaohe-Huanglianba-Xujiazui-Shizhuba, with a total length of 13 kilometers, a designed roadbed width of 6.5 meters, and a road surface width of 4.5 meters, using asphalt concrete structure. At present, the road surface of this section has been opened. There are 5 kilometers of paved road and 8 kilometers of rough road. The total investment is expected to be 7 million yuan.
- Related articles
- Ask for English translation of the following tourist routes, each with 5 points.
- Where is China suitable for traveling in April?
- China tourists were frightened when they saw the Indian New Delhi Railway Station: "Are you sure this is the capital?" ?
- Is the transportation around Hanjiang Normal University convenient? Are there any interesting places?
- Construction scheme of tourism website
- "My Ningxia" app epidemic prevention health code application process
- The feeling of writing a trip is short-lived
- The only county named after a river in China, with an average elevation of 3,700 meters. Do you know where it is?
- A female disciple came to imperial academy. Where did she take it? -Location introduction.
- Why are the Chiante sneakers missing?