Brief Introduction of China Guodian Wan 'an Hydropower Station

China Guodian Wan 'an Hydroelectric Power Plant is located 2 kilometers south of wanan county, Jiangxi Province, in the famous panic beach in the middle reaches of the Ganjiang River, bordering Beijing-Kowloon Railway in the east, Jiangxi-Guangdong Expressway in the west, 90 kilometers south of Ganzhou, the south gate of Jiangxi Province, and 320 kilometers north of Nanchang, the hero city. The total dam length of the power station is1104m, the maximum dam height is 68m, the total storage capacity is 22160,000m3, and the installed capacity is 533mw. Mainly for power generation, with comprehensive benefits such as flood control, shipping, irrigation and aquaculture. The power plant was established on1March, 198914th, and is the internal accounting unit of China Guodian Corporation after the power system reform on February 29th, 2002. At present, there are five 220kV and three 1 10kV high-voltage transmission lines, which are connected to Ji 'an power grid in the north and Ganzhou power grid in the south. It is the main power plant for peak regulation and frequency modulation and emergency standby in Jiangxi power grid.

Guodian Group Wan 'an Hydropower Plant is located on the panic beach in the middle reaches of Ganjiang River in wanan county, Jiangxi Province, the hometown of the older generation proletarian revolutionary Kang Keqing. It is adjacent to Beijing-Kowloon Railway in the east, Jiangxi-Guangdong-expressway in the west, 90km away from Ganzhou, the south gate of Jiangxi Province, and 320km away from Hero City and Nanchang, the capital of Jiangxi Province.

The total dam length of the power station is1104m, the maximum dam height is 68m, the total storage capacity is 22160,000 cubic meters, the total installed capacity is 51.3,000 kilowatts, and it is equipped with 4 sets1+03,000 kilowatts. Our factory is mainly engaged in power generation, with comprehensive benefits such as flood control, shipping, irrigation and aquaculture. It is the main power plant for peak regulation and frequency modulation and emergency standby in Jiangxi power grid.

The construction of Wan 'an Hydropower Plant started at 1958. Due to various historical reasons, the project construction has experienced a bumpy course of "three ups and two downs". 1The project resumed in May 1978, 1 1990 10, the first unit was connected to the grid for power generation, 1992, the first phase of the project was all put into production, 1996 10. Unit 5 (single unit capacity: 1 13000 kW) installed continuously by foreign investors was connected to the grid in June 2005. Our factory is connected to the northern Jiangxi power grid through five 220kV and three 1 10kV high-voltage transmission lines, connected to the southern Jiangxi power grid through Ji 'an, Xinyu and Nanchang in the north, and connected to Ganzhou in the south. It is the hub of north-south power exchange in Jiangxi Power Grid, and its cumulative power generation has exceeded 185 billion kWh since it was put into operation.

The factory has 878 employees (including retired 107). The leading group of the factory consists of 7 people, including 1 director, secretary of the party committee, 1 deputy secretary of the party committee and secretary of the discipline inspection commission, 3 deputy directors, 1 trade union chairman and chief engineer, all of whom have bachelor degree or above and senior titles.

June 5438+October 2003 10, the factory was transferred to China Guodian Corporation and became an internal accounting enterprise of Guodian Corporation. Under the leadership of the group company, our factory fully implements Theory of Three Represents, closely focuses on the eight-character policy and enterprise development strategy of the group company, takes reform as the driving force, takes safety production as the foundation, takes economic benefits as the center, and follows the working idea of "managing and carefully building ten thousand stores, concentrating on developing ten thousand stores, and cultivating ten thousand store talents with an eye to the future". Establish and improve the safety production guarantee system and the ideological and political work guarantee system, implement benchmarking management, carry out refined management, strengthen cost management, innovate "6S" people-oriented management, enhance corporate culture, ensure the stability of safety production, the stability of the workforce and the stability of business order, and promote the coordinated development of the three civilizations in enterprises. As of August 2 1 day this year, continuous safe production 1700 days, and continuous safe navigation of ship locks 17 anniversary, which is the best achievement since it was put into production.