Traditional Culture Encyclopedia - Travel guide - Ancient river tourism project

Ancient river tourism project

1. River tourism project

Here is a simple answer about what. It's in the water park. I hope I can help. No, I don't know about the water park. The water park project is fun, of course, slides are definitely more popular. For example, the rainbow slide in the Happy Island Water Park of Ruilin Bay Hotel is loved by many parents and children.

This rainbow slide is 60 meters long, and people who like excitement will play this project. The family village around the water is more childlike and more popular with families. After all, some children can't stand stimulation, so they can add more childlike interest. If tourists like to challenge themselves, they can choose spiral slides and tsunami pools. In particular, the tsunami pool is very high, so friends who like to play by the sea should not miss it.

Happy Island Water Park also has a drifting river and a children's swimming pool. Children's billiards are loved by many children. After all, this is specially designed for children. This is the answer to the question about the water park. Of course, it may not be particularly comprehensive. After all, the design scale of water parks in different places is different, so there will be some differences in projects.

2. Introduction of river tourism projects

No, rural rivers are mainly used for drainage or irrigation.

Many rural rivers are naturally formed after years of rain impact. These rivers have the characteristics of large drop, narrow channel and rapid flow. In particular, rivers are completely washed away by the once-in-a-decade rainstorm and flood.

Because of the particularity of rivers, rural rivers cannot contract tourism.

3. What are the projects of river development?

Tenth development and utilization of tidal flats must meet the following conditions:

(a) in line with the overall planning of beach development and utilization;

(2) The beach is stable or silted;

(3) It has no adverse impact on the ecological environment, aquatic resources, navigation channels, river regime and flood control facilities in the surrounding areas.

Eleventh the development and utilization of beaches in this city, the implementation of the permit system.

If the beach development project is below 80 hectares (including 80 hectares), it shall apply to the district or county water administrative department where the beach is located; The development of more than 80 hectares of beaches should apply to the municipal beach management office. The application shall specify the purpose, scope, use mode and development and utilization period of the project.

Article 12 The municipal tidal flat management office or the district/county water administrative department shall, within 15 days from the date of receiving the written application from the unit or individual for the development and utilization of tidal flats, put forward preliminary examination opinions and report them to the Municipal Water Conservancy Bureau for approval.

The Municipal Water Conservancy Bureau shall make a decision on examination and approval within 30 days from the date of receiving the preliminary examination opinions of the Municipal Beach Management Office or the district or county water administrative department.

The Municipal Water Conservancy Bureau shall solicit the opinions of the relevant municipal departments before making a decision on examination and approval; Among them, the Municipal Water Conservancy Bureau shall solicit the opinions of the district and county water administrative departments where the beach is located before making a decision on the examination and approval of the project of the municipal beach management office.

Approved the development and utilization of beaches, the Municipal Water Conservancy Bureau issued a "license for the development and utilization of beaches" to confirm the right to use beaches; If it is not approved, it shall explain the reasons in writing to the applicant.

Thirteenth after the approval of the development and utilization of beaches, units or individuals need to change the purpose, scope, mode of use and duration of the development and utilization projects, and shall go through the registration formalities for change in accordance with the original application procedures.

After the development and utilization of tidal flats are approved, if a unit or individual needs to transfer the right to use tidal flats, it shall go through the examination and approval procedures in accordance with the original declaration procedures.

Fourteenth reclamation projects must be undertaken by qualified units and designed and constructed in accordance with relevant technical specifications.

Fifteenth beach project is completed, the Municipal Water Conservancy Bureau shall organize the district and county water affairs bureau for acceptance.

After the reclamation project is completed and accepted, the unit or individual that develops and utilizes the beach shall submit the acceptance certificate and the license for the development and utilization of the beach to the municipal or district/county housing and land management department. Land management departments shall implement management in accordance with the relevant provisions of the state and this Municipality on land management.

4. River tourism projects

Introduction of Shanghai Maya Water Park Tourism Project

1. bumblebee

Lift, dive, lift and dive again. Enjoy the speed and coolness brought by roller coasters and water waves between the four courses. The perfect combination of speed and water is destined to be a brave exploration journey.

Suitable for the crowd: suitable for tourists whose height is 1.3m but not more than 90kg (1.3m- 1.4m children need to be accompanied by an adult).

2. Four-wheel drive maze

The combination of four slides, through the winding slide, rotates quickly on the specially designed slide to experience the shocking pleasure!

Suitable crowd: suitable for tourists over 1.3m and weighing 90kg (suitable for tourists floating alone below1/0kg).

3. Lazy River

Under the protection of the Mayan god Quetzalcoatl, with the urgency of the current, you can feel the endless philosophy of life and enjoy the infinite beauty on both sides of the strait.

Suitable for people: no height limit (1.2m children need to be accompanied by adults).

4. Quetzalcoatl Ring

17-meter-high Chinese drifting slide, with the change of orifice diameter, brings you the feeling of ups and downs, and injects positive energy into the family during play.

Suitable crowd: suitable for tourists over 1.3m and under 90kg.

5. The sun is spinning.

Standing on the falling platform of 17 meters, breaking through the unknown and fear, coming out from the other end of the black hole and reappearing happily.

Suitable crowd: suitable for tourists over 1.3m and under 90kg.

6. Super loud speakers

Super speaker with a diameter of 23 meters, riding a four-person raft, spinning violently and rapidly, unimaginable stimulation, will definitely make you scream!

Suitable crowd: suitable for tourists over 1.4m and under 90kg.

7. Deep-sea python

It combines twisting, spiraling and shaking, rushing from the commanding heights of six stories to the bottom. Passengers seem to be caught in the abyss by the huge current, so let's enjoy the noise in the express taxi.

Suitable crowd: suitable for tourists over 1.4m and under 90kg.

8. Big Octopus Slide

Taking an adventure raft with friends and relatives, the gliding process is tortuous, and the collision and rotation will bring you a thrilling sense of dizziness.

Suitable crowd: suitable for tourists over 1.3m and under 90kg.

9. hurricane eye

With the help of the raft, step on the waves and let go! Come on, what's with the whirlwind? We are all brave men who can stand the wind and waves!

Suitable for the crowd: it is suitable for tourists whose height is 1.3m but not more than 80kg (1.3m- 1.4m children need to be accompanied by an adult).

10. Family fun slide

Organize the whole family to ride together, scream all the way from the top of the equipment to the ups and downs, and experience the laughter and family happiness of rowing together.

Suitable crowd: suitable for tourists from 1.2m to 90kg (children between 1.2m- 1.3m need to be accompanied by adults).

1 1. Wandering between heaven and earth

Taking an adventure raft with friends and relatives, the gliding process is tortuous, and the collision and rotation will bring you a thrilling sense of dizziness.

Suitable crowd: suitable for tourists over 1.3m and under 90kg.

5. What are the procedures for river tourism projects?

As a tourist project, drifting is not allowed to be started casually. Generally, drifting in tourist attractions is publicly demonstrated by government departments, and the topography, water depth and current velocity of its waters are within the safe and controllable range. Equipped with life-saving equipment and personnel, there is generally no danger. But don't take part in spontaneous drifting in strange waters.

Chapter I General Provisions

Article 1 These Regulations are formulated in accordance with the State-owned Land Use Certificate for the purpose of strengthening river management, ensuring flood control safety and giving full play to the comprehensive benefits of rivers and lakes.

Article 2 These Regulations shall apply to rivers in People's Republic of China (PRC) and People's Republic of China (PRC) (including lakes, artificial waterways, flood discharge areas, flood storage areas and flood detention areas).

In the river, the People's Republic of China (PRC) Water Law is applicable.

Article 3 The development and utilization of water resources in rivers and lakes and the prevention and control of water disasters shall adhere to overall planning, overall consideration, comprehensive utilization and efficiency.

The water conservancy administrative departments of all provinces, autonomous regions and municipalities directly under the Central Government are the river authorities in their respective administrative areas.

Article 5 The State practices the principle of combining unified management according to water system with hierarchical management for river courses.

Important river sections of the Yangtze River, Yellow River, Huaihe River, Haihe River, Pearl River, Songhua River and Liaohe River, important river sections across provinces, autonomous regions and municipalities directly under the Central Government, border river sections across provinces, autonomous regions and municipalities directly under the Central Government, and border river sections shall be managed by river basin management agencies authorized by the state or river authorities of provinces, autonomous regions and municipalities where these river sections are located in accordance with the unified river basin planning. Other rivers shall be managed by the competent river authorities of provinces, autonomous regions, municipalities directly under the Central Government or cities and counties.

Article 6 Rivers shall be classified. River grade standards shall be formulated by the water administrative department of the State Council.

Article 7 The heads of local people's administrations shall be responsible for flood control and obstacle removal of river courses, and the United States Government shall be responsible.

Article 8 The competent river authorities and people's supervisors of governments at all levels must strengthen river management, implement water supply plans and flood control dispatching orders in accordance with national laws and regulations, and ensure the safety of water projects and people's lives and property.

Article 9 All units and individuals have the obligation to protect the safety of river dikes and participate in flood control and emergency rescue.

Chapter II River Regulation and Construction

Article 10

River regulation and construction shall conform to the comprehensive planning of river basins, flood control standards, navigation standards and other relevant technical requirements stipulated by the state, maintain the safety of dikes, and maintain the stability of river regime and smooth flood discharge.

Eleventh construction and development of water conservancy projects, prevention and control of water disasters, regulation of rivers and bridges, docks, roads, ferries, pipelines, cables and other buildings and facilities. Across the river, across the embankment, near the river, the construction unit must be in accordance with the river management authority will project construction plan submitted to the river authorities for approval. Without the approval of the river authorities, the construction unit shall not start construction.

After the project is approved, the construction unit shall notify the river authorities of the construction arrangement.

Twelfth the construction of bridges, docks and other facilities must be carried out in accordance with the river width determined by the flood control standards stipulated by the state, and the flood passage shall not be narrowed.

The bridge bottom and trestle must be higher than the design flood level, and a certain superelevation should be reserved according to the requirements of flood control and navigation. The design flood level shall be determined by the river authorities according to the flood control plan.

The clearance height of pipelines and lines crossing rivers must meet the requirements of flood control and shipping.

Thirteenth traffic departments to implement waterway regulation, should meet the requirements of flood control safety, and solicit the opinions of the river authorities on the relevant design and scheme in advance.

When the river regulation involves navigation channels, the water conservancy department should consider the shipping needs and solicit the opinions of the transportation department on the relevant design and scheme in advance.

In the renovation of rivers and waterways where bamboo and wood can be exiled and important fishery waters stipulated by the state, the construction unit shall take into account the needs of bamboo and wood water transport and fishery development, and send relevant designs and schemes to the competent forestry and fishery departments at the same level for comments in advance.

Fourteenth river authorities should regularly check the existing culverts, pumping stations, underground pipelines, cables and other buildings and facilities on the embankment. Do not meet the safety requirements of the project, it should be transformed within a time limit.

The construction of new buildings and facilities on the dikes mentioned in the preceding paragraph shall be subject to the safety management of the river authorities.

Article 15 if it is really n

Article 18 The land needed for dredging river courses, strengthening dikes and regulating river courses according to the flood control plan shall be transferred by the local people to the US government with compensation.

Land that can be used for reservoir construction and river regulation belongs to the state and can be used by people's governments at or above the county level for resettlement and river regulation projects.

Article 19 Provinces, autonomous regions and municipalities directly under the Central Government take the river as the boundary, and it is forbidden to unilaterally build drainage, water blocking, water diversion and water storage projects and river regulation projects within 10 kilometers of this river and other rivers across provinces, autonomous regions and municipalities directly under the Central Government without the consent of the relevant parties or the approval of the water administrative department of the State Council.

Chapter III River Protection

Article 20 The management scope of river dikes includes waters, sandbanks, beaches (including cultivated land), flood discharge areas, dikes on both sides of the river and dike protection areas.

For rivers without dikes, the management scope shall be determined according to the historical maximum flood level or design flood level.

The specific scope of river management shall be defined by local people and local governments at or above the county level.

6. River regulation project

River ownership belongs to the state, which is the result of law and its mission. No unit or individual may occupy the river course, because the river course is related to the important functions of flood control, water resources and environmental protection.

7. How to do the river project?

Rural tourism is a vigorously developed project at present, and many places are supported by the state. Therefore, how to do a good job in rural experience is tourism development, so it is essential that the projects you do can be well publicized. What you preach is what you must do. Generally, we should do something special and have our own unique presentation. This is very important, and you can cultivate fun during the experience. It is important to cultivate some incidental things, such as local national culture, local eating habits and local beautiful scenery. In addition, if there is a celebrity effect, you can analyze it carefully. The first is the development of culture, form and scenery, which is the highlight of your publicity. How to sing this play well is very important. It is necessary to develop local things, so as to attract people from other places to travel locally. These things can be displayed intuitively or objectively. Those who come to experience it can consider taking others next time. This is a means of propaganda. Therefore, it is safe for them to travel and do a good job of reception. Second, commercial development, because you must spend money here, so how to make money can also be forced to spend. This is a skill. It is best to pin things on consumption and develop consumption potential. Because if you don't make money, then everyone doesn't need to do it, so it is necessary to do some related business development. It uses consumption to drive local economic development, and it can do better and better, which is the key. In a word, doing a good job in rural tourism is a feasible project at present. How to do it well is your responsibility and obligation. Not only talk about consumption and re-consumption, but also do a good job in cultural propaganda, which can promote the development of other local industries. Therefore, rural tourism can fully develop him and the income will naturally come back.

8. River tourism and development

Playing by the river is easy to cause drowning, falls and drowning. It's best not to play by the river.

9. Riverside tourism project

The answer is as follows. If you are driving by car, search Grand Canyon Town, Huguan County, Changzhi City, and arrive at Grand Canyon Town from north to west. Walk along the asphalt road to Henan, and you can reach the drifting entrance of Qinglong Gorge in Dahe Village.

By bus, go to Huguan County Bus Station first, and then take a bus to the Grand Canyon, which can reach the drifting place of Qinglong Gorge in Dahe Village, Grand Canyon Town.