Traditional Culture Encyclopedia - Travel guide - When will Hangzhou Metro Line 3 open?

When will Hangzhou Metro Line 3 open?

It is expected to be 2022.

20 17 65438+ 10/7 The first phase of Hangzhou Metro Line 3 was first publicized. On March 1 day, the feasibility study report of the first phase of Hangzhou Metro Line 3 was approved by the Development and Reform Commission of Zhejiang Province. After the project is approved, Line 3 will enter the preliminary design stage.

In April, the site selection of the first phase of Hangzhou Metro Line 3 was publicized. According to the opinions of the expert review meeting on the preliminary design of the first phase of Line 3 organized by Zhejiang Development and Reform Commission, some projects were fine-tuned.

Extended data

The first phase of Line 3 starts from Wen Yi West Road Station and ends at Xingqiao Road Station in Yuhang District. The total length of the line is 43.8km, and the average station spacing is 1.53km, all of which are underground lines. The first main line of Line 3 is scheduled for trial operation in June 2022. There are 29 stations, including 9 transfer stations, which are connected with Hangzhou Metro 1 Line (2 stations transfer), Line 2 (1 station transfer), Xiaoheshan Branch Line of Line 3, Line 4, Line 5 (2 stations transfer), 10 and/KLOC-0 respectively.

The main line of the first phase of Line 3 starts from Wen Yi West Road Station and ends at Xingqiao Road Station, with a total length of 44.3km, all of which are underground lines. Station 3 1 seat, of which transfer station 1 1 seat.

The main line of Line 3 starts from Wen Yi West Road and follows Jingteng Road-Shuixiang North Road-Liangmu Road-Wuchang Avenue-Tianmushan Road-Xixi Road-Shuguang Road-Stadium Road-Zhongshan North Road-Hedong Road-Changle Road-Daguan Road-Shenbanlu Road-Baishi North Road-Xintiandi Street-Zhu Qing Road in turn.

Baidu Encyclopedia-Hangzhou Metro Line 3