What are the specific contents of the special measures to prevent heatstroke and cooling during summer construction? Zhongda Consulting will answer them below.

The construction site of this project is located in the Gobi Desert of Danan Lake in Hami. The summer is hot and hot. In order to ensure normal construction production, project quality and safety production in summer, the construction period can be completed on schedule and the predetermined quality goals of the project can be achieved. Based on the characteristics of this project, the following summer construction technical measures are formulated:

1. Earnestly implement the responsibility system for heatstroke prevention and cooling.

Conscientiously implement a series of requirements on heatstroke prevention and cooling at construction sites, be highly responsible for the lives and health of front-line construction workers, strengthen the organization and leadership of heatstroke prevention and cooling work, improve and implement the responsibility system, and formulate emergency response plans. Prepare emergency plans and pay close attention to the implementation of preventive measures to prevent heat stroke and various production safety accidents caused by hot weather.

2. Arrange work and rest time reasonably.

We must pay close attention to weather forecasts related to high-temperature weather, avoid high-temperature construction, appropriately adjust the labor and rest system for high-temperature operations in summer, reduce labor intensity, strictly control outdoor operation time, avoid operations during high-temperature periods, and ensure the health of workers. Health and life safety.

3. Strengthen rotation breaks at work.

In the summer, according to the construction process, the labor organization should be adjusted as much as possible, and frequent shifts should be adopted to shorten the continuous operation time and strengthen rotation and rest during work. Strengthen on-site inspections, increase the publicity of heatstroke prevention and cooling knowledge and heat stroke first aid knowledge, and improve the safety awareness of all employees.

4. Ensure adequate supply of drinking water on site.

Sufficient drinking water, beverages, tea and various soups that meet hygienic requirements should be provided on site to effectively prevent and cool down the heatstroke and avoid heatstroke.

5. Implement heatstroke prevention and cooling items.

We must pay close attention to the vast number of front-line construction workers who insist on construction in hot weather, strengthen the publicity of heatstroke prevention and cooling knowledge, and require construction workers to carry heatstroke prevention medicines with them, such as: Rendan, cooling oil, Fengyoujing, Zhengqi Water, etc., and implement heatstroke prevention and cooling items for every worker.

6. Actively improve the production and living environment at construction sites.

We must conscientiously implement construction site management regulations, actively take measures to strengthen ventilation and cooling, and ensure that temporary facilities such as dormitories, canteens, toilets, and shower rooms for construction workers meet the needs for heatstroke prevention and cooling.

7. Effectively carry out health and epidemic prevention work.

It is necessary to effectively carry out sanitation and epidemic prevention work at the construction site and living areas, strengthen the sanitation management of drinking water and food, strictly implement the food hygiene system, and avoid poisoning incidents caused by food deterioration; strengthen the prevention of diseases prone to summer When on-site workers develop notifiable infectious diseases or food poisoning, they should report to the relevant competent authorities in a timely manner.

8. Do a good job of fire prevention in summer.

In view of the actual situation of hot and dry weather in summer, which makes fire accidents easy to occur, we further strengthen fire prevention measures, conduct regular inspections of flammable places such as distribution rooms, warehouses, etc., and deal with problems immediately if any problems are found. Fire extinguishing equipment is required.

Emergency plans

Emergency plans are formulated for various emergency situations during construction to ensure that various emergency resources are in a good state of preparation; and can guide emergency actions in an orderly manner as planned to prevent delays in accident response due to ineffective actions or confusion in on-site rescue work, thereby reducing casualties and property losses. Emergency situations during construction refer to various types of construction work-related injuries that are sudden in nature and cause or may cause a large number of casualties and large economic losses.

1. Establish a construction emergency emergency leading group to be responsible for the command and coordination of emergency rescue work. The leading group is led by project manager Chen Ming, who is responsible for implementing the rescue work. Please refer to the emergency plan organization for specific personnel arrangements.

2. When various emergency symptoms of high temperature occur during engineering and construction, our project department should immediately activate this plan after receiving the emergency report.

3. After an emergency occurs during construction, the project department will establish a rescue on-site command center as appropriate, and the on-site construction team leader will lead on-site first aid.

Emergency repairs: During the summer construction process, due to the large number of open-air working environments when the construction industry is operating; complex and changeable personnel distribution areas; high labor intensity, etc., the construction projects in the summer are affected. Construction caused many inconveniences. In order to protect the legitimate rights and interests of workers and the safety of life and property, and create a secure and comfortable environment for workers, when workers have adverse reactions to high temperatures, the construction team leader will organize the transfer and control of the accident personnel to prevent surrounding The number of people involved in accidents at construction work sites has increased.

Information communication: Organize and collect weather and temperature conditions every day, then take necessary preventive measures, and promptly report the measures taken and the development of the situation to superiors and liaise with relevant departments.

Defense: The safety officer is responsible for monitoring the development of dangerous situations to prevent the construction period from being affected, and strengthen safety education for each team member to further improve safety awareness and organize on-site management personnel to conduct inspections on the construction site. Safety inspection, elimination of safety hazards to prevent the occurrence of serious accidents and how to minimize the impact of accidents once they occur.

Medical rescue: When an accident occurs, immediately conduct on-site classification and first aid treatment for the injured, provide effective rescue to the injured as soon as possible, and promptly transfer them to the hospital.

After an emergency occurs during construction, the rescue site headquarters can mobilize rescue teams, personnel, materials and equipment from nearby construction sites based on specific circumstances. At the same time, professional rescue teams, supplies and equipment were mobilized from the emergency reserve rescue team.

For more information about engineering/service/purchasing tender document writing and production to improve the bid winning rate, you can click on the official website customer service at the bottom for free consultation: /#/?source=bdzd