Inadvertently, a piece of work is over. What achievements are worth sharing in retrospect? We should review and sort out, and write a work summary. So, have you mastered the format of work summary? The following is my personal summary of the assembly technician's annual work for reference only. Welcome to reading.

Personal Annual Work Summary of Assembly Technician 1 First of all, let me introduce the situation of yantai wanhua project. Yantai wanhua Project is located in Lingang Chemical Industrial Park, Yantai Economic and Technological Development Zone. The electrical installation mainly includes power, lighting and grounding, and the distribution room includes transformer and voltage cabinet installation, cable laying, wiring verification and debugging. The construction unit is yantai wanhua Polyurethane Co., Ltd., the supervision unit is Beijing Huaxia Petrochemical Engineering Supervision Co., Ltd. and Shandong Qilu Petrochemical Engineering Co., Ltd., and the design units are Lu Hua Engineering Technology Co., Ltd., Shandong Qilu Petrochemical Engineering Co., Ltd. and Shanghai Haicheng Design Institute. Company X has undertaken two sets of main equipment areas, namely yantai wanhua Project Department, Gasification Unit Area and Propane Dehydrogenation Unit Area, including 32 main projects in Gasification Unit Area and 33 main projects in Propane Dehydrogenation Unit Area, with a large amount of electrical instruments, including 18 main project started in Gasification Unit Area and 8 main projects started in Propane Dehydrogenation Unit Area.

Yantai wanhua project is different from other projects. When I first came to the project department, I didn't adapt at all. Its management mode introduces DuPont management mode, which puts forward higher requirements for itself and the whole team. With the continuous understanding of Wanhua's enterprise management system, I gradually adapt to its enterprise management mode, which also requires us to be stricter with ourselves. I will think ahead of the work to be done next week. And make preparations in advance and make technical disclosure, and insist on going to the scene at least once a day to understand the actual situation on the spot, so as to know fairly well. The material budget of Wanhua Project is submitted by online process. First, submit the budget of newspaper cardboard materials. After the online electronic board material budget is submitted, the budget is approved and the demand plan is submitted. The required information needs to be found in the OA platform material library. Because there are many and miscellaneous materials in the construction of electrical specialty (many materials are not in the material library and need to communicate with the owner, design and procurement departments repeatedly), which brings us great trouble, so I set up a material coding library myself and a ledger for the material coding of common materials, which greatly saves time and improves work efficiency.

At present, I am responsible for the technical quality of the whole construction site. The two installation areas are far apart. At first, two project departments, two supervision units and three design units really couldn't stand it. So I make a three-day work plan every day, write down my daily work on paper and do it one by one. When I finish one thing, I will eliminate one thing on paper, which improves work efficiency and avoids shaving and eyebrows.

The year 20xx is coming to an end. I feel that I still have a lot to do and a lot to continue learning. I feel that on-site learning can learn a lot of new things every day. At the same time, I hope the company can organize more training courses, mainly aiming at the actual situation on the spot. Pay less attention to theory and practice as far as possible, and tell you about good construction methods and problems that should be paid attention to on site. Strive to make every work of our instrument and electrical company a bright spot. If our work is not in place, we also hope that the company leaders will give us more criticism and advice, and we will conscientiously complete every task given to us by the leaders. I will refuel!

Summary of the annual work of two assembly technicians 20xx is a fruitful year. For me personally, xx is a year of comprehensive improvement of my professional skills. In the past year, as a technical cadre with engineering construction experience, I partially or fully participated in the technical work of several construction teams specializing in steam turbines. It is in this busy and fulfilling year that under the unique conditions of Ludian Power Engineering, on the one hand, I tested my original engineering knowledge and further deepened it, on the other hand, I initially built my own professional knowledge system.

I. Overview of work

The technical work that I am personally responsible for in the whole xx year can be roughly divided into several time periods from the key points of the phased construction of the project.

At the beginning of the Spring Festival in xx, I was the only technical cadre of the whole steam turbine group because Haikou and Baima projects were in the critical period of construction. As a technical cadre of steam turbine team, I am responsible for the technical work of all teams of steam turbine specialty. At the same time, the preparation plan of more than 60 sets of construction drawings of all 2 1 large systems in steam turbine specialty is also a time-pressing, huge and extremely important work.

During the period from April when other technical cadres entered the site to August, my work focus changed, and I was mainly responsible for managing the daily construction technical work of Class 1 and Class 2, as well as the unfinished phased construction tasks in the early stage. During this period, I was mainly responsible for the installation of steel platforms in 1 and 2# steam turbine rooms, the hoisting and hauling of three high-pressure heaters, the installation of traveling rail beam and traveling crane in circulating water pump room, the installation of circulating water pipeline in the factory and the installation of high-pressure water supply pipeline that participated in the water pressure test of 1# boiler in the first-class task of pipeline.

Since August, my technical tasks have been gradually stripped off. In early September, all the tasks of Pipeline Class II were delivered to the newly transferred technical cadres from other places, and the tasks were reduced. From June 5438 to this year 10, I began to take over the installation technical tasks of two steam-driven feed pumps, and my professional skills entered a new stage in dealing with the new tasks. So far, my work focuses on the installation of two steam-driven feed pumps, the installation of temporary steam pipeline purging and the improvement of all steam-water pipeline systems responsible for the first-class pipeline construction.

Second, the work summary

In the work of xx years, I have never been intimidated by dealing with a series of heavy construction tasks and unfamiliar technical work. I have always despised the engineering and technical work I am engaged in. After all, these works have mature construction experience to learn from, and there are many engineers and technicians like me who are engaged in this work together. But I take a cautious attitude in working methods and strategies, because I can accumulate and learn valuable experience from the working practice and details of these systems.

I regard every job given to me by the team leader as a valuable opportunity to accumulate personal work experience. It is my work goal to complete the task successfully, and it is my work attitude to try my best to solve the construction problems. I participated in every construction task that I was responsible for, and fully grasped the key points of the unit project and sub-project construction. Taking the installation of steel platform and circulating water pipe in the steam turbine room as an example, these two construction tasks were the earliest unit projects carried out by the steam turbine team. During the construction of these two projects, I often rush between the main workshop and the circulating water pipe trench to check the implementation of key points of the project and discuss with the construction team leader to solve the construction difficulties. It is precisely because I really put myself into the project construction process that I have mastered the span and verticality of steel platform columns, the installation elevation control of steel column nodes, the connection quality control, the installation quality control of circulating water pipes and so on.

To say hardship and fatigue, every worker on the construction site must have a deep understanding, and as a team technician, I have a special taste in it. At the busiest time of engineering construction, I have to run nearly 20 construction teams every day, and I have to run back and forth from the boiler 6 1 meter floor to the circulating water pump room several times every day for only one reason-I am an engineering technician. Because of the need of work, in the hot weather of more than 40 degrees in summer, I also discussed with the construction team leader to solve the construction difficulties of circulating water pipes and check the construction quality. Since I entered the construction site this year, I have only taken five days off for more than 300 days. The rest of the time, like the steam turbine workers, I worked overtime every day for the smooth debugging and power generation of the company's first 600mw unit, and I was busy happily, rain or shine, and it was difficult in cold and summer.

As an employee of a modern large-scale enterprise, as an engineer and technician in a new era, I not only work hard, but also constantly sum up my progress. The conventional construction technology has long been firmly in my mind, and the new problems and difficulties encountered in the construction process are the focus of my summary. When the project is busiest, it is impossible to solve everything on the same day every day, so I will classify these things and deal with them in a planned way. Because my only project construction experience before Luzhou project was Panzhihua 135mw project, I had insufficient work experience and encountered many problems. For my shortcomings and mistakes, I corrected them in time, and for the established facts, I took the correct approach, analyzed the reasons from my shortcomings and mistakes, summed up the experience and lessons, and made them my own wealth.

In addition to technical work, I also hold positions in the general branch and installation branch of the engineering project department, and I am also the person in charge of Qing 'an post of the steam turbine team. Participating in youth activities is always my safety. I participate in every activity of the Youth League Committee with my heart and perform my duties well in the activities of the Youth League Committee. In the youth activities, my regret is that because of my busy work, I didn't carry out the activities of young workers in the steam turbine team as planned, and I didn't successfully complete the propaganda task on the steam turbine workshop in xx years. This is the failure of my project.

Three. abstract

I have always admired such a philosophical saying that a gentleman strives for self-improvement, and I have always demanded myself by the standards of an excellent engineer and technician, and I have made progress myself because of this requirement. The glory of the company needs our efforts to create, and personal development needs our own efforts to achieve. For these lofty goals, I have been making unremitting efforts and struggles. In the future work, I will continue to guard against arrogance and rashness, work hard, closely unite with everyone in the company's big family, realize the company's take-off with my brilliant youth, and write my own chapter with no regrets.

Summary of Personal Annual Work of Assembly Technician 3 I graduated from Computer Department of Shandong Laiwu Mining Workers College in 20xx. 20xx was assigned to the Exploration Company of Xinwen Mining Group in April, admitted to the correspondence undergraduate geological engineering department of Taian University of Science and Technology in 20xx, and graduated at the end of 20xx.

In the past eight years, with the help of the company's leaders and colleagues, I have worked hard to do my job according to the requirements of post responsibilities and code of conduct, and have earnestly completed all the work assigned by the leaders, and my ideological consciousness and working ability have been greatly improved.

Positive thinking, can conscientiously implement the party's basic principles and policies, actively study political theory, adhere to the four cardinal principles, abide by the law, love their jobs, and have a strong sense of responsibility and dedication. Actively study professional knowledge, have a correct working attitude, be serious and responsible, and have good ideological and political quality, ideological quality and professional ethics.

In terms of work attitude and hard work, I love my job, can treat every job correctly and seriously, can actively find my own shortcomings, and learn to supplement them in time.

Carry forward the fine tradition of being hard-working and helpful in life, always be honest and trustworthy, work diligently, unite colleagues, be pragmatic and optimistic, and always maintain a rigorous and serious work attitude and meticulous work style.

In the first four years, I humbly studied geology with my teacher. They made me understand my responsibility as a geologist and laid a foundation for me. I learned how to identify lithology, divide strata, record geology and so on. After working independently, I continued to learn and accumulate experience in my work until I was hired as a geological technician by the group company at the end of 20xx.

In charge of these projects, we will also encounter different problems, especially the pumping situation of hydrological holes and wellhead inspection holes, and the faults encountered by geological holes. Before pumping water, clean the well until you can see the lines on your palm and there is no sediment in the bottle. One of the problems encountered in pumping water is that the water is sometimes turbid, and sometimes it will produce sand, especially the water in loose conglomerate section. I can see the lines on my palm. There is no sediment in the bottle. Why does this happen when pumping water? There are two general reasons. First, there is mud on the casing wall. At this time, pumping equipment should be put forward, and an iron brush should be tied to the lower part of the drill pipe for washing. Secondly, if there is sand, it is because some conglomerates are not well cemented, and it is normal to produce sand in the screen. The general treatment method is to throw it into the hole and fish the sand tool until it is fished out. For the above two problems, in this way, when pumping again, there will be no turbidity or sand formation when pumping again. As long as you remember the lithology of the roof and floor of each coal seam and the lithology characteristics of the roof of the indicator layer of the coal measures section of the geological tunnel, but when encountering faults, especially the coal measures section, now the coal measures are all cored, and it is necessary to core until the core is complete, and there is no broken zone or fault extrusion or fault breccia. At this time, it is necessary to judge which horizon to reach through the lithologic characteristics that people usually see.

Future work plan, through summing up the work in the past three years, although some progress and achievements have been made, there are still some shortcomings, no innovative work ideas, and individual work is not perfect enough. In my future work, I will try my best to find out the shortcomings in my work so as to overcome them in my future work. At the same time, we need to read more books, study norms and related documents, master professional knowledge, improve our working ability, strengthen our sense of responsibility, and do our personal work in time. Constantly sum up and reflect, constantly spur yourself to enrich your energy, improve your quality and business level, in order to adapt to the development of the times and enterprises, and make progress and growth together with the company.

Personal annual work summary of assembly technician 4. In this year's work, I have done my job as a coal mine safety monitor with full enthusiasm, reminding myself that as a safety monitor, I must be rigorous and pragmatic in my work and not sloppy. I strive to improve my professional and technical level, ensure the normal operation of mine safety monitoring system, and make my greatest contribution to mine safety production. Because coal mine safety production is more important than the sky, safety monitoring system is an important part of coal mine safety and is the eyes and ears of coal mine safety production. Safety monitoring system and manual detection complement each other. By using the continuous work of mechanical equipment and the intelligent processing ability of computer, the work intensity of underground safety and tile inspection personnel is greatly reduced, and underground gas, other harmful gases and abnormal conditions can be continuously monitored at any time, which makes a strong guarantee for underground safety.

After work, I reviewed the previous professional textbooks again. By contacting the problems encountered in the actual operation and maintenance of the monitoring system, we not only deepened our understanding of the work of the safety monitoring system, but also discovered the hidden knowledge in the book. It provides strong support for explaining the problems encountered in practical work with theory and putting forward effective solutions. Seriously study the coal mine safety monitoring standard AQ 1029-20xx, the general technical requirements of coal mine safety monitoring system AQ620 1-20xx, the technical requirements of low concentration carrier catalytic methane sensor for coal mine AQ6203-20xx, and the coal mine safety regulations.

During my time as a supervisor, I often went down the well to deal with the faults encountered in the use of the safety monitoring system in time, so that the safety monitoring system can be restored to normal in the shortest time and the safety production in the mine can be ensured. Fill in all kinds of safety monitoring records carefully every day, and manage all kinds of data and ledgers of safety monitoring system. As a skilled worker, I attach great importance to communication and cooperation with the outside world in order to do my job well. I often communicate with the three prevention departments and safety departments to keep abreast of the discharge of various harmful gases and safety problems underground, adjust the layout of the safety monitoring system in time, and strengthen the safety monitoring of potential safety hazards. At the end of August this year, I replaced the mine safety monitoring system with monitoring factory personnel, installed the underground personnel positioning system, and learned the installation, maintenance and troubleshooting of equipment from the factory monitoring technicians. Summarize the problems encountered at ordinary times and consult the factory monitoring technician.

In my future work, I will try my best to find out the shortcomings in my work so as to overcome them in my future work. At the same time, we need to read more books, study norms and related documents, master professional knowledge, improve our working ability, strengthen our sense of responsibility, and do our personal work in time.

;