Chapter 1 of tap water installation agreement
Party A (Employer):
Party B (contractor):
According to the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, on the basis of equality, voluntariness, equal compensation, fairness, honesty and credit, Party A has reached an agreement on entrusting Party B to install water pipes, water meters and maintenance in Yan Guan Town's fruit and vegetable comprehensive market, and hereby sign this agreement for credit.
1. Project Location: Fruit and Vegetable Comprehensive Market in Yan Guan Town, Li County.
2. Scope of contract: installation and maintenance of water supply pipeline in Yan Guan town fruit and vegetable comprehensive market.
Three. Duration: 20XX September 20th to 20XX September 25th.
Four. Project cost: * * Nine thousand three hundred yuan only (in figures: 9,300 yuan).
Verb (abbreviation of verb) payment method: after the project is completed and accepted, it will be paid in one lump sum.
Liability for breach of contract of intransitive verbs:
1. Party A must participate in the acceptance of concealed works as agreed in this contract, otherwise it will be regarded as a breach of contract, and Party B can proceed to the next process. However, if Party B's construction quality does not meet the requirements, Party B must bear the quality responsibility. If Party A proposes a reexamination afterwards, and the reexamination result is unqualified, the expenses for reexamination and repair shall be borne by Party B, and the construction period shall not be postponed.
2. If Party A fails to carry out the completion inspection and acceptance as agreed in this contract, Party A shall bear the project custody and risk responsibility.
4. If Party B fails to complete the project within the time limit agreed in the contract, Party B shall pay Party A a penalty equivalent to 5% of the total project budget price for each day overdue. If the delay exceeds 3 days, Party A has the right to terminate the contract, and Party B shall pay 20% of the total project budget price to Party A as liquidated damages.
5. During the construction, Party B shall not stop work for any reason except for force majeure or Party A's reasons. If the work is stopped for more than two working days without the above reasons, Party A has the right to terminate the contract, and Party B shall pay 10% of the total project budget price to Party A as liquidated damages, and compensate Party A for the construction delay or other losses caused thereby.
6. If Party B changes the main person in charge of the project without authorization, or Party B's on-site representative does not cooperate with Party A's work or is incompetent, Party A has the right to ask Party B to change the corresponding personnel, and Party B shall change them within 2 days from the date of Party A's request. Otherwise, Party A has the right to request to stop work or terminate the contract, and Party B shall bear the liabilities for breach of contract caused by the delay of construction period and losses of Party A.. ..
7. Party B's construction shall comply with Party A's project management regulations. If losses are caused to Party A, Party B shall compensate Party A for the losses.
8. Party B's personnel fight in the construction area, damage the finished products of the project, safety accidents, etc. Party B shall be responsible for the damage caused to Party B's personnel or a third party and shall be responsible for compensation; For the losses caused to Party A, Party B shall bear all the compensation responsibilities.
9. If Party B fails to start construction on time and fails to start construction within 2 days after Party A sends a written notice, Party A has the right to terminate the contract, and Party B shall pay 20% of the total project budget price to Party A as liquidated damages, and compensate Party A for the construction delay or other losses caused thereby.
10. If Party B subcontracts or subcontracts the project to any other unit without authorization, Party A has the right to terminate the contract, and Party B shall pay 20% of the total project budget price to Party A as liquidated damages and compensate Party A for all losses caused thereby.
1 1. If Party B colludes with Party A's staff, fabricates facts or falsely reports the visa project amount in other ways, and Party A has paid the project amount, Party B shall return the project amount obtained due to the false report, and pay liquidated damages to Party A according to the equivalent amount of the false report.
Seven. Party B shall do a good job in construction and installation according to Party A's requirements, take good care of on-site facilities, ensure safe and civilized construction and ensure installation quality. In case of any dispute, both parties shall negotiate amicably. If negotiation fails, a lawsuit may be brought to the people's court where the project is located.
Eight, after the completion of the project acceptance, the maintenance and repair of water supply pipeline in the market, as well as the management of tap water users in the market, handed over to Yan Guan urban water supply company.
This agreement is made in duplicate, each party holds one copy, which has the same legal effect.
This agreement shall come into force as of the date of signature.
Party A:
Party B:
20XX x month XX day
Tap water installation agreement II
Party A: Huang Qi Kouzhen Junior High School (hereinafter referred to as Party A).
Party B: Huang Qi Kouzhen Waterworks (hereinafter referred to as Party B)
In order to do a good job in the installation of tap water in middle school campus, it is convenient for all teachers and students to drink safely; In order to standardize the construction and ensure the installation quality. Through consultation, Party A and Party B have reached the following contract on its installation, which both parties shall abide by.
1. Party A will contract all the drinking water pipe networks of the teaching building, office building, teachers' dormitory building, teachers' personal residential building and teachers' canteen in the whole campus to Party B for installation and construction.
2. All gate valves, water meters, pipes, accessories and other materials required from the junction of the township main pipeline to all floors in the campus shall be purchased and provided by Party B. ..
3. All materials provided by Party B must be approved by Party A before installation. During the installation, Party A will send someone to conduct on-site command, and Party B must carry out the installation according to Party A's planning requirements and ensure reliable installation quality. In case of water leakage or seepage within one year after delivery, Party B must rework unconditionally, and Party A will not bear all the materials and expenses arising therefrom. If water leakage or seepage causes losses to Party A, Party B shall unconditionally assume the liability for compensation.
Four. The installation fee paid by Party A to Party B in one lump sum is RMB XXXXX.
5. The whole installation period is 40 days. If it is postponed due to weather and other factors, the official water supply time shall not exceed August 23rd.
6. Party A shall pay Party B the labor cost in two installments, and pay 80% after all the installation is completed according to regulations. The balance shall be paid in full if there is no quality problem at the expiration of one year from the date of delivery, or if there is no quality problem after rework and rectification according to Party A's requirements.
Seven. Party A and Party B must abide by the above provisions. If either party breaches the contract, both parties agree to pay the other party a penalty of RMB 20,000.
Eight. This contract shall come into effect from the date of signing until the date when Party A pays all materials and expenses.
Nine. This contract is made in duplicate, one for each party.
Representative of Party A: XXXXXX
Representative of Party B: XXXXXX
Seal of Party A:
Seal of Party B:
20XX x month XX day
Chapter III of Tap Water Installation Agreement
Owner: (abbreviated as: Party A)
Employer: (hereinafter referred to as: Party B)
According to the Regulations on Construction and Installation Engineering Contracts, combined with the specific conditions of this project, and in the spirit of seeking truth from facts, this contract is signed by both parties through consultation, and * * * will abide by it together.
1. Party A contracts the tap water renovation and installation project to Party B (one meter for each household), and Party B charges each household XXX yuan as the installation fee, with a total cost of XXX million yuan. All-in construction is carried out in the form of contracts and materials, and the total installation cost is calculated according to the actual number of installed households.
2. According to the national sanitary standard for drinking water installation, the pipes used in the installation are satellite brand polyethylene (PE) pipes, which are cold-resistant, corrosion-resistant, strong in pressure resistance, long in service life and environmentally friendly.
Three. Installation scope: Dongping reservoir water supply pipe network interface to the village supervisor and branch pipe installation, with a total length of about XXX meters. The water meter installed in each household shall not exceed XXX meters, and a faucet shall be installed.
4. According to the actual situation of the village, the specific pipes are set up, and the size of branch pipes depends on the number of users. The specific settings are as follows: 1 household has ¢25(PE) pipes; 2? The five water inlet pipes are ¢32(PE) pipes; 6? Nine water inlet pipes are ¢40(PE) pipes; 10? The water inlet pipe of 18 households is ¢50(PE) pipe; 18 or above, the water inlet pipe is ¢75(PE) pipe. Is the water pipe required to be buried 30cm? Below 50cm, the quality of water pipes should refer to the specifications. Small tube pressure is not less than 10 kg.
Five, metering water meter box for household meter system, water meter must be installed outdoors, the specific location is determined by the user, and indicate the designated installation location, are not allowed to change without permission.
The construction period of this project is planned to be completed before XX, XX, XX. In order to ensure the smooth progress of the project, Party A must provide fixed personnel to coordinate various problems arising in the installation process for Party B. ..
7. In order to ensure the safety of materials and facilitate the construction, during the construction period, Party A must provide Party B with the corresponding material warehouse and construction electricity to ensure the smooth progress of the project, and Party B must pay special attention to the safe construction. In case of any accident during the construction, Party B shall bear all the responsibilities.
Eight. Payment method: After Party B completes the total project amount of XXX, Party A will pay the total project amount of XXX. After the project is completed and accepted, the project payment will be paid in full, and the deposit of the winning bidder will be converted into quality deposit. If there is no quality problem, it will be refunded after half a year. Nine. This contract is made in quadruplicate, two for each party, and shall come into force after being signed and sealed by both parties. After the project payment is settled, this contract will automatically become invalid.
Party A (official seal):
Party B (signature or seal):
Representative of Party A: XXX
Representative of Party B: XXX
20XX x month XX day
Relevant clauses of tap water installation agreement:
1. Water pipe installation contract sample
2. Tap water supply agreement
3. Tap water installation project contract sample
4. Model water supply equipment installation contract
5. Water supply pipeline installation contract sample (2)
6. Water supply pipeline installation contract sample
7. Tap water construction contract
- Previous article:The temperature in Dalian in the next three days.
- Next article:Weather forecast of Luo Yun town, Fuling, Chongqing
- Related articles
- What should I do if the weather is hot and the skin on my face itches and grows acne?
- What is the failure of the weather connection of Samsung mobile phone Sina?
- Climatic characteristics of Tomb-Sweeping Day gas
- What foods are curious in non-food movies?
- Weather of Shenyang-Dalian Expressway
- The weather in Qufu tomorrow
- Damei Ancient Town wrote a composition on the topic.
- Introduction to the method of opening friends' dynamics in ink weather
- A trip to Huanghua Creek
- What is the last sentence under the flowers in Nanmo, Dongcheng?