Traditional Culture Encyclopedia - Weather forecast - Summary of emergency rescue exercise activities

Summary of emergency rescue exercise activities

Summary of emergency rescue exercise activities

Summary is to analyze and study the relevant situation at a certain stage and make written materials with guiding conclusions. Can improve our written expression ability, so write a summary. How should I write a summary? The following is a summary of the emergency rescue drills I collected for you. Welcome to read the collection.

Summary of emergency rescue drills 1 led by the safety leading group of the project department, emergency rescue drills for production safety were conducted from June 15 to June 19, xxxx. In order to consolidate the results of the drill, praise the advanced, carry forward the achievements, improve the shortcomings, promote the work, and further enhance the emergency management ability of our project department, the safety team made a comprehensive summary of this drill.

First, the basic situation and characteristics of the drill work

This drill is an important activity of our project department, with high specifications and wide scope. All the people in the "plan" of Shiyan * * * website are involved. Judging from the effect of the drill, the drill was well-directed, well-prepared, well-organized, solid and effective, and basically achieved the expected goal. The whole exercise embodies the following three characteristics:

(a) the leadership attaches great importance to, sound organization, start quickly.

The company attaches great importance to this work. In order to meet the needs of the drill, the company specially approved a special fund of 20,000 yuan for the drill. At the same time, in order to strengthen the organization and leadership of the drill and ensure the smooth progress of the drill, the company set up a drill preparation working group with the deputy general manager as the team leader, the safety section chief as the deputy team leader, and the personnel involved in the "planning" of the project department as the team members, responsible for the planning, overall planning, coordination and guarantee of the drill.

(two) reflect the characteristics, prepare in advance, focus on promoting.

In order to enhance the effect of the exercise and reflect the characteristics of the work, the words "innovation, truthfulness and safety" were highlighted in this exercise. "Innovation" means innovation in the concept, content, form and equipment of the drill, and breakthroughs in organization and coordination, participation, information interconnection between command platforms, information sharing and rapid response of emergency teams. "Reality" means proceeding from reality and carrying out practical drills on the spot, in real soldiers, in real equipment and in practical operations according to the procedures of emergency plans; "Safety" means carefully analyzing the possible dangers in each link and taking effective measures to prevent all kinds of accidents.

Second, the implementation of the drill

(1) Simulate the operator's falling accident.

At 9: 30am on June 15, the project department received a report of falling from a height, and 1 The rebar worker fell to the ground from the feeding platform. The commander immediately started the safety emergency rescue organization, and arranged for three rescuers to bring stretchers, first-aid medicine boxes, oxygen bags and other equipment into the drill site at 9: 35 am. The person in charge of the site briefly introduced the accident. After on-site inspection, it was found that the person who fell had no obvious trauma and was conscious, but his right calf was fractured. Rescuers first temporarily reinforce the fracture, and then carry the wounded to a safe place with a stretcher, taking care to avoid the displacement of his shoulders, legs and spine. At 9: 40 am, the injured were driven out of the training ground by the simulated 120 emergency vehicle and sent to the hospital for treatment.

(2) Simulated heatstroke accident

At 3: 30 pm on June 16, the project department received a report of workers' heatstroke accident, and the drill commander quickly gave instructions, and each team was ready to carry out rescue work as planned. The team that is binding steel bars on the roof will provide on-site emergency rescue for heatstroke workers, move them to a cool and ventilated place, cold compress their heads with wet towels, and use fans to help them cool down; The medical rescue team immediately rushed to the scene with heatstroke prevention drugs; At 3: 45pm, the simulated 120 first-aid vehicle-borne heatstroke patient left the drill site and went to the hospital for treatment.

(3) simulating fire accidents

June 17 10: 00, the weather was fine and the wind was not strong. According to the arrangement in advance, the security officer shouted that there was a fire in the east, so go and save it. Upon hearing the shouts, the volunteer firemen immediately put down their work and took their positions according to their respective division of labor. The security officer who first found the fire called the fire alarm number 1 19 "and reported the location of the fire. According to the division of labor in normal education, electricians are responsible for power failure, and other voluntary firefighters use dry powder fire extinguishers, fire sand, fire hooks and shovels to put out the fire. Some team members and workers use dry powder fire extinguishers, others carry sand, and take part in the fire fighting under the command of the team leader and deputy team leader. Due to the clear division of labor and effective command, the exercise was relatively successful. It only took the team members five minutes to get to the scene, that is, after 10 minutes of exercise.

(4) Simulation of mechanical injury accidents

On the morning of June 18, 1: 05, the project department received a report of a mechanical injury accident.1The operator of the steel bar bending machine violated the rules, and the steel bar rebounded during the operation, causing a mechanical injury accident and a worker's arm fracture. The commander immediately organized to start the safety emergency rescue, the electrician turned off the power switch, and the security officer called the emergency number 120 "to arrange for the nearest hospital to prepare for the rescue. 1 1: 00, arrange two rescuers to enter the drill site with stretchers, first-aid medicine boxes, oxygen bags and other equipment. After on-site inspection, the injured person's arm was hit. Rescuers immediately fixed the injured part of the wounded simply. 165438+ at 0: 20 am, the injured in the simulated 120 emergency vehicle left the drill site and went to the hospital for treatment.

(5) Simulation of electric shock accident

On the morning of June 19 10, the project department received an electric shock accident report. At the construction site, 1 workers opened the wiring of the electric box at will, resulting in electric shock. Fortunately, the leakage switch tripped in time. The commander immediately started the safety emergency rescue organization, the electrician turned off the power switch, and the security officer called 120 "emergency number to arrange for the nearest hospital to prepare for rescue. 10: 20, arrange for three rescuers to bring stretchers, first-aid medicine boxes, oxygen bags and other equipment into the drill site. The person in charge of the site briefly introduced the accident. After on-site inspection, the injured person was in a mild coma. Rescuers carried the injured on a stretcher, put the injured flat on the ground for artificial respiration, and carried out simple wound treatment. 10: 25, simulated by 65438+

Third, the concrete results achieved.

The experts of the company's drill evaluation agree that this drill is practical and innovative, and the evaluation level is excellent. The drill was a complete success and achieved the expected results. Mainly reflected in:

(1) embodies the concept of people-oriented and scientific training. This drill implemented the principles of unified leadership, comprehensive coordination and graded responsibility for emergency response. This drill has many subjects, all participants, rich contents and realistic scenes, which is of great significance to promoting emergency management of production safety.

(2) The training objectives of the training team and the running-in mechanism have been achieved. The drill has clear guiding ideology, strict organization, full preparation, reasonable program setting, reliable safety guarantee and open and transparent process. The practicability and operability of emergency plans at all levels were tested through drills; Check the preparation of emergency materials, equipment and technology of emergency rescue teams, and conduct drills for the teams; The awareness of prevention of ordinary employees was enhanced, the knowledge of disaster prevention and mitigation and the skills of self-help and mutual rescue were popularized, the ability of commanders at all levels to deal with major accidents was improved, and the scheduled tasks were successfully completed.

Summary of emergency rescue drill 2 In order to improve the fire awareness of all employees, enhance the resilience and self-protection ability of employees in emergencies, and make every employee master certain fire knowledge. Eliminate fire hazards. Learn fire-fighting knowledge and the use of fire-fighting equipment, and master fire-fighting escape skills and precautions. Check the feasibility of the fire emergency rescue plan of the project department, the timeliness of each rescue team in an emergency, and how to ensure the safety of disaster relief personnel and equipment during the rescue process. My department takes "Fire Month" as a wedge machine, focusing on the whole people's attention to fire control and putting life safety first. Our department held a fire drill on 20xx165438+1October 9th. Invited the owner Guigong and the supervisor Meng Gong to observe. The fire drill is summarized as follows:

I. Achievements made

Improve the safety awareness of all project employees and further understand the common sense of fire safety. The ability to deal with emergencies has been improved. Most employees at the drill site can effectively organize and quickly respond to fire accident alarms, and most rescue captains can effectively organize team members to evacuate, alert and put into fire fighting operations. It will improve the handling of emergencies in the future.

Before the drill, our department organized a fire plan drill training, so that the on-site personnel can master certain fire knowledge, enhance employees' resilience and self-protection ability in an emergency, learn relevant fire knowledge and the use of fire-fighting equipment, and master fire escape skills and precautions. The project department vigorously publicizes the importance of fire safety by posting slogans.

During the drill, the team cohesion of employees was sublimated. The organizational ability, command ability and emergency response ability of the emergency leading group have also been exercised. Basically achieved the purpose of fire drill.

Second, shortcomings.

A few employees' safety awareness and sense of responsibility are not strong enough, and the drills are not serious enough. Individual rescue team leaders did not publicize the importance of this exercise to the team members, which was characterized by slow action, loose discipline and insufficient seriousness. The drill of the rescue team is not in place, the drill of the fire brigade is not real enough, and the overall drill effect is not very good.

Third, the follow-up work arrangements

It is the duty and responsibility of every employee to reduce the losses caused by accidents to the company. Company employees and managers at all levels must work closely together to deal with emergencies. Once they receive instructions to deal with emergencies, they must be obliged to carry them out quickly while ensuring their own safety. Do not shirk responsibility or refuse to implement it under any pretext. In this way, our company is a big family, a collective with fighting capacity and execution. Therefore, the project department will improve the above shortcomings in future work and emergency activities, and further strengthen the training and publicity of emergency work. Enhance the feasibility of emergency plan. Ensure the timeliness of rescue teams in future emergencies and how to ensure the safety of personnel and equipment in disaster relief during the rescue process.

Summary of emergency rescue drill activities 20XX1On the morning of October 8, Renewal Factory organized a fire emergency evacuation in the west factory area.

And fire drills simulating resin fire in anchoring agent workshop. The whole drill includes on-site simulated fire alarm, safe evacuation of personnel, initial fire fighting and actual shooting of fire extinguishers. Whole course 1 hour, 100 more than people participated in the drill.

According to the emergency plan, on-site professional rescue teams, evacuation rescue teams and logistics support teams were set up to cooperate with the emergency plan drill. This emergency plan drill * * * uses 8kg portable dry powder, 1 sandbox, 4 fire shovels, and the logistics is equipped with sufficient water, towels and other items, which really guarantees the emergency plan drill. This emergency plan drill lasted for 20 minutes from the fire to the evacuation and rescue, and put out the fire source, which effectively controlled the spread of the fire in time, ensured personal safety and avoided property losses. The division of labor is clear, and the responsibility lies with people. At the first time of the fire, the participants were calm and collected. Through the drill, all employees are familiar with how to call the police correctly, how to put out the fire, how to evacuate and how to save themselves and escape.

Through this fire drill, the good mental outlook of employees in our factory was fully reflected, the employees' understanding of fire safety knowledge and practical skills of correctly using fire-fighting equipment were deepened, so that everyone clearly realized how to face emergencies, which played a positive role in the development of safety production in our unit, achieved the goal of responding to fire accidents scientifically, safely, orderly and quickly, strengthened the emergency escape methods of employees in the fire, and improved the factory's command ability to emergencies.

Summary of emergency rescue drill activities 4 According to the requirements of the higher authorities, the District Housing and Construction Bureau adheres to the principle of "territorial priority, compartmentalization, meticulous organization and scientific rescue", further strengthens the emergency management of the housing and construction system, improves the emergency rescue system, and comprehensively carries out the "gas emergency rescue drill" activities of the housing and construction system.

First, improve ideological understanding and strengthen organizational leadership.

Strengthening gas emergency rescue drills will be included in the important agenda of daily work, and a working mode will be established in which the main leaders personally grasp and the leaders in charge specifically grasp. Combined with the actual situation of the housing construction system, formulate and improve the emergency plan for gas safety production accidents. At the same time, combine the emergency drill plan of the drill week with the actual production and operation of the enterprise, repeatedly study and improve the emergency plan, and formulate the emergency rescue drill plan to ensure that the emergency rescue drill work is implemented.

The second is to strengthen the publicity of emergency knowledge and do a good job in supervision and inspection.

Actively respond to the spirit of the publicity week of public safety emergency knowledge with the theme of "scientific disaster reduction and legal response" in our district, vigorously publicize the knowledge of laws, regulations and norms related to production safety accident prevention and emergency response and emergency measures in various accident situations, organize different levels, different categories and different forms of emergency plan drills, continuously strengthen the connection of emergency plans, and improve emergency rescue capabilities. At the same time, all construction enterprises and gas enterprises are required to do corresponding rescue drills and conduct regular inspections to avoid emergency rescue work becoming a mere formality.

The third is to strengthen emergency rescue drills and improve the level of emergency rescue.

Actively organize all construction enterprises and gas enterprises to participate in the 20xx public emergency rescue plan exercise of the Housing and Construction Bureau, organize comprehensive emergency drills or special emergency drills, guide enterprises in key industries (fields), organize different forms of emergency plan drills, improve emergency preparedness for possible production safety accidents, strengthen personnel training, pay attention to the exercise process, ensure that all participants are trained and drilled, and improve risk awareness and emergency handling ability.

Fourth, conscientiously sum up experience and find out the shortcomings.

According to the development of drill activities, we should conscientiously sum up experience to find out the shortcomings, constantly revise and improve the emergency plan, and effectively enhance the scientificity, pertinence and effectiveness of the emergency plan, so as to further improve the comprehensive command ability and emergency handling ability to deal with safety emergencies in the future emergency rescue work, and improve the ability to deal with various safety accidents and the level of emergency rescue work.

Summary of emergency rescue drill activities 5 20xx On March 25th, the project department organized an emergency plan drill. This drill is divided into four parts:

The first part, familiar with the drill plan and emergency knowledge training;

The second part, emergency assembly

; The third part, on-site rescue;

The fourth part, on-site fire fighting.

First of all, the project manager explained the exercise plan to everyone, then the full-time hse coordinator gave a detailed explanation on the use of fire extinguishers, the correct wearing and using steps of breathing apparatus, and then conducted emergency knowledge training.

With the emergency assembly signal sent by three long emergency whistles, all personnel in the camp will gather at the emergency assembly point in the shortest time after hearing the alarm, count the number of dormitory people and organize evacuation.

On-site rescue requires drills to simulate the injuries of people on the construction site. After receiving the help notice, our on-site rescuers rushed to the construction site for rescue at the first time, and organized personnel to carry the injured person on a stretcher to the emergency vehicle.

During the drill of simulating the fire scene, our crew used asbestos cloth to isolate the air when they found the fire source, but unfortunately they fainted by inhaling poison gas. The on-site first aid team takes rescue measures and organizes fire fighting at the same time. The whole drill lasted 1 hour for 29 minutes, which fully demonstrated the emergency response speed of emergency agencies of the project department and the implementation effect of emergency procedures.

Through this drill, the rationality and reliability of the fire emergency plan were verified, the fire knowledge and common sense of fire escape were popularized, the fire emergency start-up and disposal procedures were familiar, and the ability of fire prevention and emergency support was enhanced.

Through drills, let everyone know more clearly what to do in case of fire; How to call the police correctly; How to fight correctly; How to evacuate people; How to save yourself and escape? Let everyone realize that time is life and time is money. After encountering fire and other emergencies, it is the most critical link to evacuate to the assembly point in time according to the usual escape route to reduce casualties and fire emergency treatment. Emergency assembly drills will be conducted regularly and irregularly in the future.

Summary of emergency rescue drill activities 6 In order to further enhance the safety awareness of elevator passengers, improve their ability to resist emergencies, master the emergency handling and escape ability at the scene, especially in case of accidents, prevent accidents and minimize accident losses, the safety committee of our company organized this elevator emergency plan drill. These activities are summarized as follows:

I. Achievements made

1, which enhanced the safety awareness of all employees, further understood the common sense of elevator safety and mastered the basic methods of elevator emergency rescue.

2. The ability to deal with emergencies has been improved, and most employees on site can effectively organize and quickly respond to accident alarms, and evacuate and alarm one after another. It is very beneficial to deal with emergencies in the future.

3. Before the drill, the elevator plan drill training was organized, which improved the safety knowledge, emergency handling ability and escape skills of the on-site personnel.

4. During the drill, the employees' concept of observing discipline and "following the command in all actions" stood the test, and the team cohesion was sublimated.

5. The organizational ability, command ability and adaptability of the leading group for safety work have also been exercised.

Second, there are shortcomings.

1, a small number of employees are not strong enough in safety awareness, enthusiasm for this activity is not high, their sense of responsibility is not strong, and their drills are not serious enough.

2. The rescue team is skilled in drills and on-site rescue operations, but lacks the speed of emergency operations. It is necessary to further study and strengthen the emergency response capability in technology.

The elevator emergency plan drill held by the company was successfully completed according to the drill plan carefully planned in advance, and the purpose of this emergency drill was achieved. This proves that the operating procedures of alarm and personnel emergency rescue are feasible in our emergency plan. Through this drill, the company further clarified the top-down organization and procedures of elevator emergency, the responsibilities of each department and the tasks of each post, effectively strengthened elevator safety management, strengthened prevention, timely controlled and eliminated the losses caused by special equipment accidents, improved the company's ability to deal with emergencies and ensured the safe operation of elevators. It further enhances passengers' elevator safety awareness and emergency escape and self-help ability. The above shortcomings must be overcome in future work and activities, so that all aspects of ability can be improved.

Summary of emergency rescue drill activities 7 In order to implement the spirit of the document of the District Safety Committee, according to the actual situation of our town and the unified deployment of the Town Safety Committee, the Town Safety Committee and some enterprises carried out actual drills according to the major accident plan, and achieved good results. The safety emergency drills in our town are summarized as follows:

First, the leaders attached great importance to it and the drills were organized in place.

In order to ensure the implementation of the exercise activities, our town held relevant meetings to deploy the exercise work. Comrade Ceng Liping, the mayor, demanded that we should first pay attention to it ideologically, enhance the safety awareness of employees, carry out safety awareness education among employees, seize the opportunity of this drill, and improve the ability to deal with emergencies. At the same time, we should pay attention to safety and ensure that safety measures are in place to ensure the smooth progress of this drill. On June 14, members of the Safety Committee and related enterprises conducted drills as planned.

Second, the planning is meticulous and the exercise plan is safe and feasible.

According to the requirements of the leading group meeting of the town safety Committee, the town safety supervision office reported the emergency plan for major accidents in the town to the leading group with the landslide accident in the quarry as the theme. After review by the leading group, the scheme is safe and feasible.

In order to ensure the smooth progress of the drill as planned, the Safety Committee held several special meetings to clarify the division of responsibilities and ensure the complete success of the safety drill.

Third, the exercise is effective.

According to the requirements, the content of this safety drill is mainly to rescue the injured. The town safety committee and related enterprises participated in the drill. It took only 15 minutes from issuing the instruction to all rescuers arriving at the designated place. After arriving at the scene, the town safety committee is responsible for commanding and dispatching, the police station is responsible for maintaining the order at the scene, and the medical staff in the town health center are responsible for treating the injured, and they are sent to the city hospital after on-site treatment. During the drill, all departments and enterprise personnel cooperated tacitly.