How to fill in the construction log
Construction log format
The easiest way to enter the construction log form is to fill in the person, that is, the supervisor himself or the project representative, and then fill in the year, month and day. Weather conditions need to be entered: temperature, humidity and climate. Fill in personnel information, equipment information, production information, quality and safety work records and comments. Then give it to the engineer/builder, or the owner, or the project manager for signature. It should be noted that if there is no work on the construction day, the construction log should also be filled in to maintain its continuity and cannot be supplemented or corrected.
You should use a hard-cover, wired field notebook, just like the one used by inspectors to take notes, or a notebook bought directly from a stationery store. The pages of the notebook should be numbered consecutively, and there should be no pages missing in the middle. When taking notes, don't erase or smear them. If you make a mistake, cross out the incorrect information with a line and continue to record. You shouldn't tear out any pages in your notebook.
If you want to void a page, mark it with a big "X" and indicate the word "void". Make a record every day, and write down every date. If there is no homework on a certain day, you should mark something like "No homework" on that day's page. The weather conditions should also be recorded on the date of "no operation", so that it can be used to explain why "no operation" occurs in future lawsuits to pay off losses. All entries should be recorded on the day of occurrence. If you write notes on post-it notes and then add them to the log, this fact may be exposed in the trial, thus greatly reducing the credibility of the entire log.
The method of doing well the construction log.
First of all, understand the requirements for filling in the construction log:
1, the construction log should be filled in according to the unit project.
2. Recording time: from commencement to completion acceptance.
3. Daily records are not allowed to be interrupted.
4, timely, true and detailed records, midway personnel changes, should go through the handover formalities, in order to maintain the continuity and integrity of the construction log. The construction diary shall be recorded by the foreman of the building number.
Second, make clear what should be recorded in the construction log.
The contents of the construction diary can be divided into five categories: basic contents, work contents, inspection contents, inspection contents and other contents.
First, the basic content:
1, date, week, weather, average temperature. The average temperature can be recorded as XX℃-XX℃, and the weather is recorded in the morning and afternoon respectively.
2. Construction site. Name, axis, floor, etc. Division and subdivisional work should be clearly written on the construction site.
3, head of the operation attendance. Attendance must be recorded according to the division of labor, and the total number of workers and the number of workers and machinery must be recorded.
Second, the work content:
1, construction content and actual completion on that day.
2, the main content of the construction site meeting.
3. Inspection opinions and decisions of relevant leaders, competent departments or inspection teams on engineering construction technology, quality and safety.
4, the construction unit, supervision unit of engineering construction technology, quality requirements, opinions and implementation.
Third, check the content:
1, acceptance of concealed works. Concealed content, floor, axis, subdivisional work, acceptance personnel, acceptance conclusion, etc. It should be stipulated.
2. Manufacture of test block. The name, floor, axis and quantity of the test block group shall be specified.
3, material approach, inspection. The batch number, quantity, manufacturer and acceptance of the purchased materials shall be stated, and the inspection results shall be supplemented after inspection.
Four, check the content:
1. Quality inspection: quality inspection and treatment records of concrete pouring and molding, steel bar installation and welding, brick masonry, formwork removal, plastering, roof engineering, ground engineering and decoration engineering on that day; Records of concrete curing, dosage of mortar and concrete admixture; The causes and treatment methods of quality accidents, as well as the effect verification after quality accident treatment.
2. Safety inspection and handling of potential safety hazards (correction).
3, other inspection, such as civilized construction, field capacity and appearance management, etc.
Verb (abbreviation for verb) Other contents
1, design change notice, technical verification and implementation.
2, construction task disclosure, technical disclosure, safety technical disclosure.
3. Power cut, water cut and shutdown.
4, construction machinery failure and treatment.
5, winter rainy season construction preparation and implementation measures.
6. Promotion and use of special measures and construction methods, new technologies and new materials involved in the construction.
Third, pay attention to some details during the filling process.
1. When writing, the handwriting must be neat and clear, and it is best to write in imitation of Song Dynasty or block letters.
2. The main construction contents of the day must correspond to the construction site.
3. Maintenance records should be detailed, including maintenance parts, maintenance methods, maintenance times, maintenance personnel and maintenance results.
4. Welding records should also be recorded in detail, including welding position and welding method (arc welding, electroslag pressure welding, lap double-sided welding, lap single-sided welding, etc. ), welding current, covered electrode (agent) brand and specifications, welding personnel, welding quantity, inspection results, inspectors, etc.
5. Other inspection records must be specific and detailed, and cannot be generalized. Inspection records can be memorized in detail and can also replace construction records.
6, water, electricity must be recorded clearly start and end time, water, electricity is how to return a responsibility, whether to cause losses.
- Previous article:It's cold and Tik Tok is hot.
- Next article:What are the classification and characteristics of snowstorms?
- Related articles
- 20 12 What's the weather like in Nanjing on May 4th and 5th?
- The weather in Xinjiang in late August
- Yang's word Hanlin Yang
- The road of the brave crosses the world's highest highway-Jieshan Osaka.
- In February, Europe Tour launched Europe Tour Package.
- How cool it is in summer.
- Sentences that girls wear skirts to send their friends (a collection of 20 sentences)
- How does the legend of water describe hot weather?
- 2022 Buy a car WeChat friends circle classic sentence
- Q Xinyu weather