Safety self-inspection report before flood season

Pre-flood safety self-inspection report (9 selected articles)

Time passed inadvertently, and a piece of work was over. Looking back at the efforts during this period, there are defects. Let's write a self-inspection report seriously. So, have you mastered the format of the self-inspection report? The following is my pre-flood safety self-inspection report, hoping to help you.

Safety self-inspection report before flood season 1 In order to further improve flood control, ensure safety during flood season, protect people's lives and property in our town, maintain normal production order and maintain social stability. According to the spirit and document requirements of the meeting of the Municipal Flood Control and Drought Relief Headquarters, our town mainly starts from four aspects, and the self-inspection report is as follows:

First, firmly establish the concept.

The floods in recent years have caused great economic losses to our town. Therefore, we have established the concept of people-oriented, building a harmonious society and ensuring the safety of one party, and have done a solid job in flood control this year.

Second, strengthen organizational leadership.

According to the requirements of the document, a leading group for flood control and drought relief was established in our town, with the mayor as the leader, the deputy mayor and the deputy secretary in charge of agriculture as the deputy leader, and the relevant personnel of the Agricultural Office and the Agricultural Service Center as members. Responsible for flood control and flood fighting of important reservoirs, Shanpingtang, Shiheyan and dangerous sections of rivers within the jurisdiction, supervise and implement relevant units to formulate flood control schemes for water conservancy projects, establish flood control duty system, set up flood control teams and make good reserves of flood control materials, and be responsible for emergency rescue and disaster relief within the jurisdiction.

Third, the implementation of task allocation.

During the flood season, our town implemented the personnel on duty for flood control and drought relief, defined the responsibilities of the personnel on duty, insisted on being on duty 24 hours a day, and was responsible for collecting information and reporting the flood and drought situation.

Fourth, do a good job in early safety inspection.

After investigation, first, there are pear trees on the water storage in X town; Second, the culvert of X Party Reservoir was blocked due to the Chongqing-Suiyuan Expressway; Third, the X River weir was blocked due to the repair of the Chongqing-Suiyuan Expressway. No other safety hazards were found.

We are actively dealing with the trees in the reservoir. It is suggested that the culvert blockage and river channel blockage caused by X-Dan Reservoir and Shidao Manuzui Shihe weir should be solved by the higher authorities.

The second part of the pre-flood safety self-inspection report fully implements the safety production policy of "safety first, prevention first and comprehensive management" according to the requirements of "Opinions of XXX River Management Bureau on Flood Control Work Arrangement in 20XX" and "Responsibility Letter of Flood Control Target Management in 20XX", and sets up the consciousness of "preventing early floods, floods, major risks and disasters". Our company has made preparations for flood control in advance, and made preparations for flood control in 20XX. The self-inspection and rectification situation is now reported as follows:

First, the full implementation of flood control work

1, define the objectives and responsibilities of flood control work, and strengthen the sense of responsibility.

According to personnel adjustment, adjust flood control institutions, clarify flood control responsibilities, and implement personnel responsibilities. Key flood control areas, important equipment and important operations are implemented to people. Conscientiously implement the flood control policy of "safety first, constant vigilance, prevention first and all-out rescue", firmly establish the idea of "preventing major floods and grasping major risks", attach great importance to flood control work, raise awareness and strengthen management. According to the principle of "who is in charge at different levels, who is responsible", the responsibility system for flood control and flood fighting will be implemented step by step, and the flood control and flood fighting work system will be formulated according to relevant laws and regulations, and the flood control and flood fighting tasks will be decomposed into posts and individuals, and the emergency plan for flood control and flood fighting of XX Hydropower Station will be compiled and improved in time.

2. Construction of flood control team.

(1) After the establishment of the leading group for flood control, we quickly studied and deployed and established the flood control group. The whole station staff is an emergency rescue team, responsible for the safety of the whole station. Under the unified leadership of the company, tests were mainly carried out on flood control facilities, hydraulic structures, gate opening and closing system, standby power supply and so on. When problems are found, take immediate measures to solve them before the flood disaster occurs, so as to prevent them before they happen.

(2) Carefully organize flood control drills to improve the emergency ability of flood fighting and emergency rescue. In order to further improve the flood control awareness and emergency ability of the staff of the whole station, test the operability and practicability of the flood control plan of our station, find and solve problems as early as possible, and improve the overall emergency ability of the whole station. 20XX held two flood control drills from May to June. The contents of the drill include emergency rescue teams, emergency treatment of communication failures, emergency treatment of flood control facilities, and drills to prevent major accidents such as flooded factories. After the on-site drill, summarize and analyze, and achieve the expected results.

3. Material realization.

We strictly follow the requirements of the flood prevention plan and do a good job in material reserves. After the notice was issued, we quickly made a comprehensive inventory of flood control materials in the whole station, supplemented the insufficient parts in time and replaced the damaged parts.

4. Strengthen the inspection of hydraulic structures.

According to the actual situation of this power station, the diversion open channel is a high cushion square open channel, and there are many sundries in the incoming water of the open channel in flood season. We have formulated a strict engineering inspection system, which is inspected every two hours in non-flood season and every hour in flood season. Clean the trash rack at the head of diversion canal and the trash rack in the forebay irregularly to ensure the safe water flow in the canal. In order to prevent the trash rack from silting and seriously damaging the channel, our company added an overflow weir in front of the sluice at the head of the channel to discharge the flood into the original north main channel through the diversion channel in an emergency.

Second, the main problems

1. There is no flood dike in the main and auxiliary powerhouse, which is a hidden danger.

2. Operators' flood control emergency capability needs to be improved. In particular, new employees are limited to skilled operation of equipment, but their awareness of flood control and ability to deal with emergencies are poor. Some operators have a weak sense of safety and are lucky.

Third, the main points of the next step

1, and conduct regular investigation on hidden dangers of flood control.

Strengthen the investigation of hidden dangers and dangerous sources, make the investigation of hidden dangers deep and detailed, leave no blind spots and dead ends, consolidate the rectification effect, form a hidden danger investigation and management mechanism of "finding points, touching contacts and full coverage", and continuously promote safety production and flood control.

2. Strengthen duty management in flood season to ensure safety and stability in flood season.

According to the staffing of "operation duty", the person in charge is responsible for the duty in flood season, and the stationmaster tracks the water situation, adjusts the duty mode in time according to the needs, and reasonably arranges the duty personnel. During the on-duty period, it is necessary to institutionalize, refine and standardize the work of water regime capture, flood dispatching and external flood reporting, start encrypted inspections of equipment and hydraulic structures in strict accordance with the situation, eliminate equipment in time, prevent production risks and natural disasters, and ensure the safety in flood season.

3, long-term exercise, improve the flood control plan.

Combined with the weather characteristics in flood season in recent years and the 20XX annual emergency plan drill plan, frequent drills are organized in a planned way for flooded factory buildings, interruption of auxiliary power supply and dangerous situations of water diversion system. In order to further improve the response speed and accident handling ability of employees to deal with emergencies, ensure the efficient operation of emergency mechanism in extreme cases, organize effective measures, and form an emergency linkage mechanism with the competent authorities.

4. Further consult with the management department to build flood levees for the main powerhouse and auxiliary powerhouse of the power station.

Pre-flood safety self-inspection report 3 According to the Notice of the Municipal Flood Control and Drought Relief Headquarters on Preparing for Flood Control in 20xx, our bureau attaches great importance to flood control preparation, strictly implements the flood control responsibility system according to the division of labor of emergency plans for flood control and drought relief in xx County, and carries out key inspections in combination with the actual situation to eliminate hidden dangers in time and ensure the safety of animal husbandry production. The flood control inspection is summarized as follows.

First, strengthen leadership and responsibility.

The leaders of the Bureau attached great importance to the flood control and drought relief work in animal husbandry, organized and held a meeting for the staff of flood control and drought relief in animal husbandry (report on the selection and appointment of county cadres), set up a flood control organization with the director as the commander, the deputy director in charge as the deputy commander, and the heads of relevant stock rooms and prevention offices as members, and arranged 20xx flood control duty implementation forms, from June/KLOC-0 to September 30, the flood control duty was implemented every day. According to the division of responsibilities, we will refine the prevention and response measures and do a good job in disaster prevention and responsibility implementation.

Second, strengthen implementation and nip in the bud.

(a) to carry out a comprehensive flood control inspection. In accordance with the goal of "comprehensive inspection, highlighting key points, strengthening responsibilities and improving measures", we will carry out unit self-inspection, key unit inspection and comprehensive inspection in stages. Large-scale aquaculture enterprises are required to carry out flood control self-inspection, find hidden dangers in production as early as possible and rectify them in time. The business unit of the bureau and the prevention and control institutes conducted key inspections on key farm households, and the prevention and control institutes organized personnel to conduct a comprehensive investigation on all farm households to find and eliminate hidden dangers in time. Focus on inspection 10 large-scale aquaculture enterprises, 45 key farmers and more than 320 farmers. Found unqualified designs 15, issued rectification notice 12, and completed rectification before the end of May.

(two) to strengthen the guidance and services of disaster prevention and mitigation. First, strengthen publicity and guidance, go deep into farmers to carry out publicity and launch, and enhance farmers' awareness of disaster prevention and mitigation. The second is to do a good job in disaster prevention guidance. Go deep into livestock and poultry farms, check livestock sheds and drainage pipes, urge farm households to carry out transformation and upgrading, guide farm households to completely eliminate hidden dangers, and prepare for disaster prevention. * * * 500 convenience service cards and more than X promotional materials were distributed to help farmers eliminate more than 20 hidden dangers.

(3) Strengthen disaster emergency response. Dock with the Meteorological Bureau, strengthen communication and contact, timely feedback the disastrous weather, and make early warning of disastrous weather. Pass the weather information to farmers in time through the information service platform of "Nongzhengtong" to minimize the adverse impact of disaster weather on animal husbandry production and animal products supply. Strengthen emergency duty, once the disaster happens, quickly start the emergency plan, grasp the disaster situation in time, scientifically and objectively evaluate the disaster losses, and report them in time.

(four) to strengthen the production and marketing of feed and livestock products docking. Actively coordinate and assist farmers to reserve forage feed to avoid feed shortage caused by disasters. Actively coordinate relevant departments to do a good job in forage transportation, livestock and poultry slaughter, seedling transportation and other channels to ensure the normal production of farm households.

(five) to strengthen the prevention and control of animal diseases. Strengthen basic prevention and control work such as immunization and disinfection. In case of floods, pay close attention to the dynamics of animal epidemics to ensure that major animal epidemics do not occur and do not spread.

(6) Establish a long-term mechanism. Through the inspection of flood control work in animal husbandry, it is found that some chicken houses in farms are aging, with weak disaster prevention ability and potential safety hazards; Some farmers have a weak awareness of disaster prevention, fail to really realize the danger, and have a fluke mentality. Now that the flood season is about to enter, the next step is to establish a long-term mechanism for flood control, pay attention to education and supervision, urge farmers to rectify in time, eliminate potential safety hazards, and ensure the safety of animal husbandry in flood season.

Pre-flood safety self-inspection report 4 1, strictly implement the flood control responsibility system. In order to strengthen the leadership of flood control safety work, the school set up a leading group for flood control safety work. Establish and improve the leadership responsibility system, the school and each class signed a letter of responsibility for the safety work objectives during the flood season, and defined the specific person in charge to ensure foolproof.

2. According to the requirements of the municipal flood control headquarters, our school carefully studied the notification requirements and formulated an emergency plan for safety work in flood season to ensure the safety of students and the stability of the campus.

3. Carry out targeted safety education for teachers and students in flood season to enhance their awareness of prevention and self-help and self-care ability. Students are required not to play in dangerous areas such as Mihe River, reservoir and low-lying areas to prevent problems before they happen. Our school is far from Mihe River and Reservoir, but we can't be careless.

4. The school has set up an emergency leading group for flood control and disaster relief in flood season with President He Shujun as the team leader, Ji Yanliang as the deputy team leader and the class teacher as the member. The flood control command and publicity liaison group, with He Shujun and Ji Yanliang as the main members, is responsible for and co-ordinates the flood control work of the whole school.

Li Daogong, Wang Xishun and Su formed an emergency rescue team for flood fighting and disaster relief, and cooperated with the class teacher to do a good job in student work and management. The logistics support group with Ji Aifang, Zhang Qinghua and Chen Guoming as the main bodies has done a good job in various sanitation and disease prevention.

In a word, flood control inspection is a serious work involving the safety of life and property. Our school seriously organizes flood control inspection work, and relevant responsible persons should make concerted efforts to ensure that all preventive measures are put in place.

The fifth chapter of "Safety Self-inspection Report before Flood Season" was written according to the spirit of document No.2012185. Our station held a meeting immediately, and according to the principle of "safety first, prevention first", combined with reality, highlighted key points, conscientiously implemented the spirit of the document, carefully arranged the deployment, and formulated an action plan. The self-inspection is now reported as follows:

First, the self-study time.

It starts on April 16 and ends on April 20th.

Second, the introspection method

Each group and factory shall first list the self-inspection situation and report the self-inspection situation. The management station is led by the deputy stationmaster in charge of safety, and the members are the heads of the management station office, engineering team, dam face and aqueduct. Conduct a comprehensive inspection of the safety self-inspection of the reservoir. And report the inspection to the station Committee in time.

Three, the scope and content of self-examination

The scope of self-inspection includes four parts: reservoir operation management, water supply safety, channel reconstruction and daily management of management stations, which are carried out by means of self-inspection first and then unified inspection at the stations.

1, reservoir operation management, conducted in-depth and detailed safety investigation of a reservoir under management, cleared rat holes and ant nests, repaired and maintained dam abutments, and dredged and renovated drainage facilities such as spillway and drainage ditch. A comprehensive inspection of the surrounding mountains was carried out to eliminate hidden dangers and ensure the normal operation of the reservoir and the safe flood season.

Do a good job in flood control duty arrangement, emergency material deployment and emergency team formation in advance. It is necessary to ensure that the highway on the top of the embankment in the river channel is smooth, ensure the smooth traffic during the flood season, and ensure that flood control materials and flood control personnel can be quickly transported to designated places during the flood season.

Reservoir managers adhere to the patrol system on duty, pay special attention to the safety of tourists, refresh warning signs, and require competent leaders to follow during flood season.

2. Water supply safety: Xiangcun Waterworks has comprehensively inspected, overhauled, replaced and disinfected the safety manhole cover, gate valve well and machine room of surge shaft, effectively strengthened water source management, resolutely put an end to all kinds of pollution, put an end to all unsafe factors, ensured the safety of water supply quality, took precautions in place, and realized safe production and water supply safety.

3. Channel reconstruction, actively organize dredging, and strive to complete the channel restoration project in the main flood season.

4. Daily management of the management station. Each group should thoroughly inspect and maintain vehicles and motorcycles. It is forbidden to drive sick or dangerous vehicles, and drivers are forbidden to drive under the influence of alcohol and fatigue. It is necessary to send a car from the office to drive safely. The guard system is sound, and the work and rest system and the registration system for foreign personnel are strictly implemented.

Fourth, the existing problems

In the process of self-inspection activities, all teams can put safety work in an important position, and both safety awareness and the implementation of safety production operations and measures are relatively perfect. But there are two main problems:

1, employees' safety awareness is not strong.

Individual employees don't pay enough attention to safety, their thoughts are confused, their safety awareness is weak, they ignore safety precautions, protective facilities and equipment, and treat safety perfunctory.

2. The implementation of safety responsibilities is not in place.

During the inspection, each team can operate in accordance with the Safety Production Law, Safety Production Management System, Accident Emergency and Handling System and other relevant regulations. However, there are still some problems such as unclear safety responsibility, no quantitative decomposition of tasks, imperfect formulation of responsibility system, and no signing of safety responsibility book.

Verb (abbreviation of verb) rectification measures

The above problems are influenced by objective factors, but the main reason is that the work responsibility is not true, which leads to passive work. In view of the existing problems:

First, strictly implement the safety responsibility system. According to the investigation, the responsibility for safety work of each group is implemented to people, and key positions are fixed with special personnel on duty, strictly abide by the duty system, strengthen the management of succession, and make a good record of duty. To ensure safety from top to bottom, everyone has a burden.

Two, in-depth study and implementation of the "production safety law" and "Shaanxi province production safety organization law". It is necessary to integrate theory with practice, find the reasons from the depths of thought, standardize employees' own safety behaviors, and enhance their consciousness of obeying rules and disciplines. Promote the smooth development of various water conservancy projects and daily work.

In short, in the future work, we will strictly follow the relevant requirements of our superiors and work together with Qi Xin to ensure the safe operation of all the work. We will earnestly absorb the experience and education from previous work, sum up laws, improve measures, guard against arrogance and rashness, and do a good job in water conservancy safety management as always.

Pre-flood safety self-inspection report 6 XXX Township fully implemented the deployment of county flood control and drought relief chief commander and carried out pre-flood self-inspection. XXX township party committee and government held a meeting to clarify the importance and division of responsibilities of flood control work in flood season, and conducted a comprehensive inspection of water conservancy facilities in the township, residents in flood disaster spots where mountain torrents were unobstructed. The implementation is now reported as follows:

The first is to implement the flood control responsibility system.

In order to effectively strengthen the leadership of flood control and flood fighting in XXX Township, the township party committee and government discussed and studied, and established the command group for flood control and geological disaster prevention in XXX Township, with the township head Huang Haihui as the commander, the relevant leaders as the deputy commander, and the heads of relevant units as members, with offices set up to clarify the heads of villages, further implement the responsibility system, and strictly implement various flood control responsibility systems with the chief executive responsibility system as the main content. In order to further understand the disaster situation in each village, the township head led relevant personnel to conduct a comprehensive inspection of each village, listened to the report of the village cadres, visited the hidden danger site in person, and arranged the command work.

Two, improve the flood control plan and the implementation of the flood control plan.

Before the flood season, the village leaders led the relevant staff to go deep into each village group to conduct a comprehensive investigation, especially to conduct a comprehensive inspection of potential safety hazards and register the existing potential safety hazards. Through further investigation, combined with the characteristics of flood control and geological disaster prevention, the 20 18 annual flood control and geological disaster prevention plan of XXX township was revised and improved. Detailed regulations have been made on the distribution, emergency treatment, danger report and deployment of flood control teams in towns and villages. The evacuation of personnel, the transportation of materials, the inspection of emergency routes and dangerous sections, and the handling of dangerous situations are all clearly stated.

Third, emphasize strengthening the duties of the personnel on duty.

Strengthen duty management and report the disaster situation in time. Reasonable formulation of duty table for flood control and geological disaster prevention. Every day, a team member leads the class, and the duty officer turns on the phone 24 hours a day to ensure smooth communication. The duty room is manned 24 hours a day. The township government takes the form of telephone inquiry or on-site inspection to strengthen the inspection of hidden dangers and report them immediately once they are found.

Four, the implementation of flood control materials and rescue teams

According to the county flood control and geological disaster prevention notice, XXX township has fully implemented the equipment needed for flood control and flood control, and arranged to reserve flood control sandbags, wooden stakes, iron bars, safety helmets and flood control clothes. Further clarify the quality and quantity of specific equipment in each village and arrange special personnel to keep it. In order to strengthen the construction of professional rescue and relief teams, XXX Township Flood Control Office re-approved the roster of flood control teams. There are four working groups for information monitoring, transmission, dispatching and security and 1 emergency rescue team under the flood control command group of XXX township. Each administrative village has set up a working group for the prevention and control of mountain torrents with the village director as the head. At the same time, the villages set up emergency rescue teams with backbone militia as the main body (each team has no less than 20 people).

In accordance with the arrangement, deployment and requirements of provinces, cities and counties on flood control and geological disaster prevention, combined with the actual situation, XXX Township conscientiously implemented the leadership instructions, timely studied and strengthened measures, fulfilled its responsibilities, made steady progress in a solid and orderly manner, comprehensively completed flood control and geological disaster prevention, and spared no effort to safeguard people's lives and property.

Pre-flood safety self-inspection report 7 According to the requirements of the document, the Urban Management Administrative Law Enforcement Bureau seriously carried out the investigation of hidden dangers of flood control in the system, and the details are reported as follows:

First, work out a work plan and implement work responsibilities.

Formulate the work plan for flood control and self-inspection of urban management and law enforcement bureau, clarify the scope, content and work requirements of grass-roots units, implement work responsibilities, conduct self-inspection and rectification according to relevant investigation contents, and put forward emergency treatment opinions or rectification plans for all kinds of problems found in the inspection that affect the safety in flood season, and solve them within a time limit.

Two, seriously carry out the inspection and maintenance of drainage and flood control facilities before the flood season.

Conduct a detailed investigation of key flood control facilities and solve problems in time when found.

First, the municipal drainage facilities such as bridge opening, ramps, low-lying sections, drainage pumping stations and drainage pipes in the urban area are investigated, and comprehensive dredging, dredging and maintenance are carried out. Drainage pumps are set up in low-lying sections to ensure smooth drainage in flood season. The second is to carry out safety inspection on power distribution facilities such as street lamps and control boxes around the road sections prone to water accumulation to prevent leakage accidents when water accumulates; The third is to check the culvert gate crossing the dike in the urban area, and debug and maintain the hoist to ensure the normal operation during the flood season. The fourth is to investigate all kinds of rainwater wells and inspection wells in urban areas and clean up and maintain them in time. The fifth is to study and formulate solutions and emergency measures with the focus on urban waterlogging-prone areas. The sixth is to check the landfill and park scenic spots to ensure the normal operation during the flood season.

The third is to do a good job in preparing for emergency rescue in urban waterlogging.

Refine various flood control plans and attach importance to "technical defense". The municipal facilities management center will install monitoring cameras at the main drainage gates and waterlogging-prone locations in the urban area to realize real-time monitoring.

Fourth, do a good job in flood control materials reserves.

The system of Urban Management Administrative Law Enforcement Bureau plans to reserve 30,000 woven bags, 5 tons of iron wire, 2 10 life jackets, 10 generators, 59 water pumps and 38 emergency vehicles in flood season. In order to ensure the emergency rescue and relief work in the first time during the flood season, a rescue team of 2 10 people was set up.

Five, strengthen the flood control work on duty, the implementation of linkage mechanism.

After entering the flood season, the Urban Management Administrative Law Enforcement Bureau will implement a 24-hour duty and leadership shift system, and at the same time strengthen communication with the meteorological department and the municipal flood control headquarters, always pay attention to the weather situation and weather forecast, immediately launch emergency plans in case of bad weather and danger, fully organize flood control and drainage, and report to the municipal flood control headquarters in time.

Six, actively promote the construction of urban drainage and flood control short board.

1, actively apply for funds, promote the construction of rainwater pumping stations, and improve the urban drainage and waterlogging prevention capacity. The total investment of the rainwater pumping station is 21190,000 yuan, and the applied capital is 654,380+0.098 million yuan. This project will be completed before the end of the year.

2. Carry out the general survey of urban pipe network, fully grasp the present situation of urban drainage pipe network, and improve the ability of urban drainage and waterlogging prevention.

Seven, the main problems and corrective measures

1. The municipal facilities maintenance and management center found that the two locations are prone to waterlogging during the flood season. In view of these two locations, the Urban Management Law Enforcement Bureau will take emergency measures such as special supervision, pulling the warning line, opening the manhole cover and speeding up drainage during the flood season. At the same time, make a rectification plan and complete it within a time limit. The waterlogging-prone point near Nanhu 1 Kangmei Avenue will be solved by the end of 2020 after the planned pipeline laying in Xinglong Street, and the waterlogging-prone point at the intersection of Huifa Road and Renmin Street will be solved by the end of 20xx after the construction of the pumping station is completed.

2. According to the investigation of the scenic spot, the south main canal is located on the south side and bears the flood discharge pressure in most areas of the upper reaches. At present, the main canal is partially silted, and there is a risk of backward flow in flood season, which will pollute the water quality in the lake. Because the main canal is not within the scope of management, the municipal government needs to coordinate relevant departments to deal with it in time.

Pre-flood safety self-inspection report 8 According to the spirit of the superior, combined with the actual situation of high mountains and steep slopes and many rivers in my hometown, arrange and carry out the work as early as possible, carefully analyze the flood control situation in the township in time, and take various measures to prepare for flood control at the same time to ensure the safety in flood season.

The emergency preparedness before the flood season is reported as follows:

First, before the flood season, the township government organized staff to strictly investigate the hidden dangers of flood control in the township. Xxx reservoir, xxx power station, xxx and other surrounding areas. , formulated the "20xx Annual Flood Control and Emergency Rescue Work Plan for Qianjin Township", established the flood control headquarters with the party secretary as the commander, team members as the deputy commander and relevant departments as members, and defined the work responsibilities, staff and system guarantee. Communication, power supply, public security and other related units also cooperate closely to do a good job in the maintenance of communication power supply lines and do a good job in flood control logistics support.

Two, the establishment of township flood control duty inspection system, the implementation of 24-hour duty, the implementation of night inspections in key areas, found problems in a timely manner.

Three, the establishment of flood prevention and rescue teams and reserve teams, do a good job in flood control personnel protection. In view of the township xxx reservoir, xxx power station, xxx three key flood control areas, the formation of the backbone militia-based rescue team and reserve team. At the same time, each village has also set up a rescue team consisting of 20-30 people to ensure the safety of villages during the flood season.

In view of the flood control situation, we have prepared some flood control materials (stones, sand, woven bags, shovels, iron wires, stakes, etc.). ). Next, we will intensify flood prevention propaganda, strengthen patrol on duty, do a good job in the investigation of hidden dangers in flood season in time, eliminate hidden dangers, pay close attention to the operation of key parts such as water regime, rain conditions and reservoirs, report and deal with problems in time to ensure the safety of the whole town in flood season.

Pre-flood safety self-inspection report 9 is to further improve flood control, ensure flood safety, protect people's lives and property in our town, maintain normal production order and maintain social stability. According to the spirit and document requirements of the meeting of the Municipal Flood Control and Drought Relief Headquarters, our town mainly starts from four aspects, and the self-inspection report is as follows:

First, firmly establish the concept.

The floods in recent years have caused great economic losses to our town. Therefore, we have established the concept of people-oriented, building a harmonious society and ensuring the safety of one party, and have done a solid job in flood control this year.

Second, strengthen organizational leadership.

According to the requirements of the document, our town has set up a leading group for flood control and drought relief, with the mayor as the leader, the deputy mayor and the deputy secretary in charge of agriculture as the deputy leader, and the relevant personnel of the Agricultural Office and the Agricultural Service Center as members, responsible for the danger removal work of important reservoirs, Shanpingtang, Shiheyan and river courses within its jurisdiction.

Flood control and flood control in dangerous sections are responsible for supervising and implementing the flood control scheme of water conservancy projects formulated by relevant units, establishing flood control duty system, setting up flood control rescue teams and making good reserves of flood control materials, and being responsible for emergency rescue and disaster relief within their respective jurisdictions.

Third, the implementation of task allocation.

During the flood season, our town implemented the personnel on duty for flood control and drought relief, defined the responsibilities of the personnel on duty, insisted on being on duty 24 hours a day, and was responsible for collecting information and reporting the flood and drought situation.

Fourth, do a good job in early safety inspection.

After inspection, first, there are pear trees on the anti-repair water reservoir in Dalu Town; 2. The culvert of Yanwodang Reservoir was blocked due to the Chongqing-Suiyuan Expressway; The third is the Shihe weir in Manaozui, Shidao, which was blocked due to the repair of the Chongqing-Suiyuan Expressway. No other safety hazards were found.

We are actively dealing with the trees in the reservoir. It is suggested that the culvert blockage and river blockage caused by Yanwodang Reservoir and Manaozui Shihe weir repair expressway in Shidao should be solved by the higher authorities.

;