Traditional Culture Encyclopedia - Weather forecast - Emergency Plan for Three Preventions and Snow in Winter
Emergency Plan for Three Preventions and Snow in Winter
In daily study, work and life, you will inevitably face unexpected events. In order to make an emergency response at the first time, it may be necessary to make an emergency plan in advance. What problems should be paid attention to in compiling emergency plan? The following is the emergency plan (5 selected articles) for three defenses and snow prevention in winter that I collected for you. Welcome to read, I hope you will like it.
Emergency plan for three defenses and snow prevention in winter 1 1. general rules
The purpose of compiling 1. 1
In order to effectively prevent production safety accidents, minimize the harm and consequences caused by typhoons, and reduce casualties and property losses.
1.2 compilation basis
According to the general emergency plan of Xiamen Municipal People's Government, the work plan for flood prevention and typhoon prevention of Xiamen Construction Management Bureau, the emergency plan for flood prevention and typhoon prevention of Xiamen construction engineering quality and safety supervision, and the guidelines for the preparation of emergency plans for production safety accidents of production and business units and other relevant regulations.
1.3 Scope of application
This plan is applicable to the typhoon prevention work of the project.
1.4 working principle
People-oriented and safety first; Prevention first, quick response and decisive disposal.
2. Hazard analysis
2. 1 Basic information of the project
Project name: xx
Project address: xx
Project overview:
2.2 Main Sub-projects and Risk Analysis
Deep foundation pit: xx
Gaopo: xx
Template project: xx
External scaffolding project: xx
Construction hoisting machinery: xx
Temporary electricity consumption: xx
Temporary facilities: xx
3. Emergency rescue organization and responsibilities
3. 1 emergency headquarters of Project Department
The project department set up a leading group for typhoon emergency work, with the project manager as the team leader, and members including project technical director, safety officer, builder, material engineer and team leader. Emergency headquarters unified command of typhoon emergency response, was responsible for the command of emergency rescue of this project, requested rescue from relevant rescue departments of enterprises and government, reported the rescue situation, and approved the start and termination of this plan.
3.2 each construction team
According to the actual situation of each project, implement the typhoon prevention measures formulated by the project and obey the deployment and command of the project.
4 classification of typhoons
According to the scope and degree of typhoon influence, the typhoon warning level is divided into Grade I (particularly serious), Grade II (serious), Grade III (heavier) and Grade IV (general). When the intensity, scope, landing location and damage degree of typhoon change during its development, the early warning level should be adjusted in time.
4. 1 early warning stage
Within 48 hours, the project area may be affected by tropical cyclones.
4.2 Level 4 (General) Early Warning
Within 24 hours, the project area may be affected by tropical cyclones, with an average wind force of above 6 or a gust of above 7; Or have been affected by tropical cyclones, the average wind force is 6 ~ 7, or the gust is 7 ~ 8 and may continue.
4.3 Ⅲ (heavier) early warning
Within 24 hours, the area where the project is located may be affected by tropical cyclones, and the average wind force can reach above 8 or the gust is above 9; Or it has been affected by tropical cyclones, with an average wind force of 8 ~ 9, or a gust of 9 ~ 10 and may continue.
4.4 Ⅱ (severe) early warning
Within 12 hours, the project area may be affected by tropical cyclones, and the average wind power may be above 10, or the gust wind may be above 1 1; Or have been affected by tropical cyclones, the average wind force is above 10, or the gust is above 1 1 and may continue.
4.5 Level 1 (particularly serious) early warning
Within 12 hours, the project area may be or has been affected by typhoon, and the average wind power may reach above 12, or it has reached above 12 and may continue.
5, hierarchical response program
5. 1 early warning stage
Pay attention to collect the latest typhoon information released by the meteorological department, arrange the construction progress reasonably, and avoid the process construction that needs continuous operation during the typhoon.
5.2 Four-level response measures
The Project Department shall conduct safety inspection on each division and sub-item according to the key points of hidden danger investigation in Annex 1, and rectify the hidden dangers found in time.
5.3 Three-level response measures
On the basis of level IV response, the project department will reinforce the foundation pit, external scaffolding, construction hoisting machinery and temporary facilities. According to the main points of typhoon prevention measures in Annex 2.
5.4 Secondary response measures
The construction site stopped at the right time. Prepare emergency supplies and emergency food; Except for lighting, drainage and emergency electricity, all other power sources should be cut off for temporary electricity consumption on the construction site; The safety net of external scaffold shall be dismantled according to the main structure; According to the surrounding environment, lower the tower crane or make the boom rotate freely, and the hook should be connected to the highest position.
All personnel in the brick temporary dormitory, temporary dormitory near the sea, foundation pit, brick wall, billboard and temporary dormitory on the ground with the height of tower crane as the radius are evacuated to a safe place.
5.5 First-level response measures
The project has entered a particularly emergency windproof state, and all personnel should stay in a windproof and safe place as far as possible, and the project department should prepare for emergency action at any time;
6. The emergency is over
When the typhoon and secondary disasters are effectively controlled, that is, the threat of the typhoon to the construction site has stopped, or the typhoon has turned around and landed outside the project area, the project manager can announce the end of the emergency according to the original authority to approve the emergency start.
The project department will repair the damaged external scaffolding, construction hoisting machinery and equipment and temporary facilities. Organize construction, technical and safety personnel to conduct a comprehensive investigation on the construction site. Only after the construction site meets the conditions for safe production can it be resumed.
7. Protection
7. 1 emergency team support
According to the actual situation of the project department, each project department sets up an emergency rescue team including external scaffolding, building lifting equipment, carpentry, bricklayer and hydraulic engineering, and regularly organizes emergency rescue skills training.
7.2 Emergency materials and equipment support
According to the project scale, the project department is equipped with corresponding safety protection articles, emergency lighting, emergency vehicles, emergency equipment and facilities and emergency medicines. The project appoints a special person to regularly check the emergency rescue materials and equipment to ensure their normal use.
7.3 Emergency fund guarantee
The project has set up special funds such as emergency materials reserve, post-disaster treatment, post-disaster recovery funds and subsidies for emergency personnel needed for flood control and typhoon prevention.
7.4 Protection of disaster avoidance places
The project department should prepare disaster avoidance places and set up signs according to the actual situation on site to ensure that workers in dangerous areas are in danger when the typhoon comes.
8. Training and exercises
8. 1 training
The project department regularly trains all employees on emergency knowledge. New employees should be trained in emergency knowledge (mainly including emergency procedures, precautions, escape routes, meeting places, etc. ) in view of possible accidents when entering the company; Emergency rescue personnel of the project department shall receive emergency rescue training (including emergency judgment, emergency rescue technology, on-site disposal measures, etc.). ).
8.2 drill
The project department should organize drills regularly to make emergency personnel clear their respective responsibilities and working procedures, improve the ability of coordinated operations, and ensure the effective and rapid development of emergency rescue work. And analyze and evaluate the effect of the drill, and solve the problems exposed in the drill in time.
Emergency plan for three defenses, wind protection and snow prevention in winter 2. General rules:
1, compilation purpose
In order to do a good job of typhoon prevention, deal with all kinds of disasters caused by typhoon in time, minimize all kinds of losses on my construction site, maintain normal construction and ensure the smooth progress of the project.
2. Scope of application
This plan is applicable to the prevention and emergency treatment of typhoon disasters within the construction scope of this bid section.
3. Working principle
Typhoon disasters are managed according to the construction area, with various functional departments and construction teams as the main disposal, and each functional department is responsible for the construction team. All functional departments actively support, guide and supervise the emergency response work of corresponding construction teams. It is necessary to put the prevention of typhoon disasters in a prominent link and do a good job in various preventive work. Carefully analyze the strong winds and rainfall that may be caused by typhoons. In case of danger, respond quickly, start this emergency plan in time, and organize personnel to do their best to rescue and provide disaster relief.
4. Focus of work
(1) Waterproofing, pit wall collapse prevention and rolling stone prevention shall be carried out at the construction site of each foundation pit excavation;
(2) Prevent landslides, collapses and other disasters that may cause accidents on the construction roads;
(3) the temporary construction site and the construction team site before the disaster personnel and equipment transfer;
(4) Prepare flood control and drainage facilities for material warehouses on the construction site;
(5) Safety protection measures for vertical transportation equipment, scaffolding and construction electricity;
(6) The living guarantee of each construction site and station during the gale and heavy rain;
(7) Forecast, forecast and early warning of typhoons and rainstorms, and timely release typhoon early warning information to the construction team and the construction site.
Second, the leading group for flood control and typhoon prevention:
The project department set up a leading group for flood control and typhoon prevention with unified command, and each department was responsible for each construction team.
Leading group for flood control, typhoon prevention and wind prevention
Leader of the leading group:
Deputy team leader:
Members:
Three. Prevention and early warning mechanism:
1, typhoon and other disasters monitoring
The safety team of the project department is responsible for the monitoring and information collection of typhoons, rainstorms, storms and mountain disasters, knowing the weather situation in advance, collecting all kinds of information on the base surface and traffic roads of each construction site in time and reporting it to the leading group.
2, the construction site safety inspection
Adhere to the safety inspection of each construction site, take the implementation of wind and flood prevention measures as the focus of inspection work, timely understand relevant information, and arrange personnel to deal with the base surface and roads that may cause harm in advance to avoid accidents when disasters occur.
3, the responsibility of the construction site early warning member to carry out.
Designate a part-time safety officer at each construction site to serve as a disaster early warning officer at the same time, mainly responsible for collecting and reporting all kinds of dynamic information at the construction site and notifying the leading group of instructions. When a disaster occurs, assist each construction team leader to implement disaster prevention measures and command.
4. Disaster early warning mechanism
The security team should establish a monitoring system for weather conditions and construction site conditions, implement information collection measures, adhere to the daily inspection system, and conduct encrypted observation and inspection in rainy season. Once dangerous signs are found, immediately call the police, transfer personnel and related equipment, and report to the leading group of the project department.
Fourth, emergency response:
The leading group of the project department is in full command, with full participation, and coordinates the participation of personnel from relevant departments.
The disaster monitoring department analyzes the development trend of typhoon according to the weather forecast, issues rainfall and wind forecast, puts forward defense targets and reports them to the leading group in time. According to the circular, the leading group made clear the defense objectives and key points, issued personnel transfer orders, declared an emergency flood control and wind prevention period, started this disaster prevention plan, sent special personnel to the affected areas to guide the work, organized and directed the rescue and relief work, reported the relevant situation to the relevant departments at higher levels in a timely manner, and reported it to the higher authorities to coordinate the deployment of medical and living materials assistance when necessary.
Verb (abbreviation for verb) for emergency rescue and disaster relief:
After the typhoon landed or was seriously affected, the disaster prevention leading group held a meeting on emergency rescue and disaster relief in time to deploy emergency rescue and disaster relief work. Organize all staff to rush to the disaster relief site, guide the rescue and devote themselves to the rescue and relief work.
(1) The team leader grasps and summarizes the disaster situation in time, coordinates the related work of emergency rescue and disaster relief, is responsible for the deployment of disaster prevention materials, completes the disaster prevention evaluation work together with relevant personnel, and reports to the construction headquarters and supervision department.
(2) According to their respective responsibilities, each team member shall organize the supply of materials and equipment needed for post-disaster recovery, and give priority to the supply of living materials for construction workers.
(3) Each construction team shall formulate the repair plan of the damaged construction site in time and organize the forces to repair it as soon as possible.
(4) The leading group should contact the local health department, organize forces to actively rescue the wounded and sick, and at the same time cooperate with government agencies to do a good job in quarantine and epidemic prevention in disaster areas to prevent the spread of the epidemic.
(5) Each construction team should organize forces to repair damaged roads and communication facilities, and do a good job in post-disaster production and self-help.
(6) Logistics personnel manage and distribute materials to ensure the supply of daily necessities.
(7) Contact the insurance department to make claims.
(8) After the typhoon, all construction teams and departments shall report the disaster to the leading group in time. After the disaster, the leading group should summarize the experience and lessons of flood fighting, disaster relief and disaster relief, and submit a written report to the engineering headquarters and supervision department.
(9) When the typhoon and disaster situation are effectively controlled, the leading group can announce the end of the emergency according to the information summary.
Six, emergency support:
1, supported by rescue team
All contractors within the scope of our project department are obliged to participate in typhoon prevention and disaster relief. Each construction team takes the team leader and safety officer as the backbone, and organizes all personnel to participate in disaster relief work when disasters occur.
2. Material safety
The Material Logistics Department should reserve necessary emergency materials for typhoon prevention for emergency use in case of major disasters.
3. Financial guarantee
Office to do a good job in the implementation of emergency rescue and disaster relief funds, when disasters occur, according to the instructions of the leading group, do a good job in the allocation and distribution of funds.
4. Communication and information security
Communication methods are mainly mobile phones and hand-held walkie-talkies. When the public telephone network breaks down, the application system of disaster prevention walkie-talkie will be started in time, and the fixed channel of notification will be used to ensure the smooth information channel.
5, medical and health security
The leading group should contact the local health department, be responsible for health and epidemic prevention and medical rescue in epidemic areas, prevent the epidemic of diseases, and do a good job in immunization and disinfection in public places.
6, typhoon relief work evaluation
After each typhoon, the leading group should summarize, analyze, qualitatively and quantitatively evaluate all aspects and links of typhoon prevention and relief work. Summarize experience, find problems, and further do a good job in preventing Taiwan from disasters.
This plan by my project department "leading group for flood control and typhoon prevention" is responsible for the interpretation.
Emergency plan for three snowstorms in winter III. Doing a good job in typhoon prevention in construction sites is of great significance to social stability and economic development. In order to carry out windproof work in an orderly manner, ensure timely, efficient and orderly emergency treatment on the construction site, minimize accidents, ensure personal and property safety, and maintain social stability, this emergency treatment work plan is formulated according to the Law of People's Republic of China (PRC) on Work Safety, the Provisions of the State Council on the Investigation of Administrative Responsibility for Extraordinary Safety Accidents (the State Council Order No.302) and the actual situation of our construction site.
First, the basic principles of emergency treatment
(1) This plan is the basic procedure and organizational principle for emergency treatment when typhoon affects our site.
(2) This plan is applicable to the emergency treatment of the construction site.
(3) This plan implements the principles of unified command, individual responsibility, close cooperation, prevention first, saving lives, quick response, territorial protection and ensuring safety in the implementation of emergency response.
Second, the organization and command institutions and main responsibilities
Set up on-site wind prevention work command group.
Team leader:
Members:
Main responsibilities:
(a) responsible for the formulation and revision of the project wind emergency treatment implementation plan;
(2) Before the typhoon comes, be responsible for notifying the person in charge of the construction site to do a good job of wind prevention, checking the reinforcement of safety facilities on the construction site, and evacuating and transferring the accommodation personnel of temporary work sheds;
(three) arrange personnel on duty, patrol the construction site, in case of casualties, immediately organize rescue and rehabilitation work; Keep close contact with relevant government departments, report the emergency treatment at the scene of the accident at any time or request the necessary rescue forces to reinforce;
(four) after the typhoon, responsible for convening the relevant departments to investigate and analyze the causes of casualties and summarize the emergency handling of accidents.
Third, the implementation of the plan
(a), the typhoon development, is expected to affect our region, the meteorological observatory issued a typhoon news:
1, issue a notice of wind prevention work, and all teams should pay attention to the weather forecast and pay close attention to the typhoon trend.
2, notify the site teams, ask them to pay attention to the preparation of typhoon prevention.
(2) When a typhoon is approaching our city and will affect our region within 48 hours, the Meteorological Observatory issues a typhoon warning:
1, each team shall arrange the construction reasonably and stop the working procedures that must be continuously constructed;
2, do a good job of safety inspection before the typhoon, the inspection content includes whether tic-tac-toe frame is firm, whether the facilities such as grille are firm, including whether the temporary work shed is safe, measures should be taken to strengthen and eliminate potential safety hazards.
3. Strengthen the inspection of the construction site, issue a rectification notice to the problems and hidden dangers found in the inspection, and order the construction team to rectify immediately.
(3) When a typhoon may strike our region within 24 hours, causing serious impact on our region, the Meteorological Observatory will issue an emergency warning for typhoon:
1. The personnel of the construction site wind prevention work command team are in place, and personnel are arranged to be on duty to inspect the construction site.
2. Stop construction at the construction site and evacuate the construction personnel to safety.
3, further check the implementation of various defensive measures, and in a state of war, the implementation of the construction site rescue team in place, and in a state of war.
(4) When the typhoon has landed and weakened to a low pressure, it will no longer have an impact on our city, the Meteorological Observatory will issue a typhoon warning to lift it, and the construction team should check the disaster situation. Strengthen the safety of on-site equipment and facilities in time and summarize the typhoon prevention work.
In order to do a good job in emergency response to meteorological disasters, improve our school's emergency response ability to meteorological disasters, and minimize or avoid losses caused by meteorological disasters, this plan is formulated in accordance with relevant laws and regulations.
First of all, heavy rain
1. The rainstorm signal is released by the Meteorological Observatory, and the school responds according to the rainstorm information broadcast by the district TV station or radio station.
2. Emergency work of yellow rainstorm signal
(1) The comprehensive office shall arrange to inspect all buildings, facilities and equipment, and do a good job of rain protection and soaking prevention. Check and drain the school drainage facilities.
(2) Students stop outdoor activities, and the guidance office and the class teacher urge students to return indoors. Students are strictly forbidden to make noise in the classroom so as not to cause panic. The teacher on duty comes to the class to check the students' discipline and attendance.
(3) Students should bring rain gear to and from school, and it is forbidden for students riding bicycles to take umbrellas.
3. Emergency work of red rainstorm signal
(1) Continue to do the emergency work of rainstorm yellow signal.
(2) All school personnel shall suspend all outdoor activities and homework.
(3) The General Affairs Department shall organize the transfer or protection of low-lying and easy-to-soak materials.
4. Emergency work of black rainstorm signal
(1) The General Affairs Office shall do a good job in protecting the school property and do a good job in campus drainage according to the rain; The student affairs office should do a good job in the management of teachers and students; The guidance office announced the suspension of classes and made a notice on the resumption time and curriculum adjustment arrangement.
(2) Teachers and students stay in the classroom and pay close attention to the weather. The head teacher comes to class, manages to appease students' emotions and take care of students' safety.
(3) After the black rainstorm signal is released, teachers and students should stay at home or school, and teachers and students in the school can go home only after the situation is suitable.
(4) If students are on their way to and from school, they should immediately find a safe place to shelter from the rain, call their parents to take them home, and call the class teacher to fulfill the leave formalities.
(5) The class teacher should strengthen the management of students' attendance and contact the parents of students who are not in school to find out their whereabouts.
(6) The person in charge of each class, each office and each functional room should do a good job in the safety protection of personnel and materials within the scope of their duties. The school assessed the situation that caused the loss.
5. After the rainstorm warning is lifted, each class teacher should immediately report the personnel and materials to the General Affairs Office, and each office should quickly report the personnel and materials to the principal's office.
Second, typhoons.
1. The Meteorological Observatory issued a typhoon signal, and the school responded according to the rainstorm information broadcast by the TV station.
2. Emergency work of white attention signal and green early warning signal
(1) All departments of the school should be prepared for the wind.
(2) The comprehensive office shall inspect the buildings, facilities and equipment.
3. The yellow warning signal emergency work
(1) The school has entered a windproof state.
(2) Students stop outdoor activities.
(3) All personnel shall not stay or walk under windward windows.
(4) The general affairs department shall organize the protection of buildings, facilities and equipment.
4. Emergency work of red emergency alarm signal
(1) The school entered an emergency windproof state.
(2) The General Affairs Office will do a good job in protecting the school property, and the Academic Affairs Office will announce the suspension of classes and make a notice on the resumption time and curriculum adjustment.
(3) Teachers and students should stay at home or school. Teachers and students at school can only go home when the situation is right.
(4) On the way to and from school, students should avoid staying under trees, balconies, light box advertisements and windows, immediately find a safe place nearby to take shelter from the wind, call their parents to take them home, and call the class teacher to fulfill the leave formalities.
(5) The students have returned to school, and the class teacher should manage and appease the students' emotions and take good care of their safety. For students who are not in school, contact their parents to find out where to go.
(6) The person in charge of each class, each office and each functional room should do a good job in the safety protection of personnel and materials within the scope of their duties. The school assessed the situation that caused the loss.
(7) The general affairs department shall organize the protection of buildings, facilities and equipment.
5. Emergency work of black emergency alarm signal
(1) Continue to do the emergency work of the red emergency alarm signal.
(2) The General Affairs Office is responsible for cutting off the school power supply.
(3) Everyone stays in a safe place to take shelter from the wind until the alarm is lifted. After the alarm is lifted, you should stay indoors and pay close attention to the weather changes to prevent the residual wind from blowing.
6. After the typhoon warning is lifted, the class teacher should immediately report the personnel and materials to the General Affairs Office, and each office should report the personnel and materials to the principal's office quickly.
Third, thunderstorms.
1. All departments should pay attention to lightning protection safety.
2. Once there is a thunderstorm warning, all personnel should stop outdoor activities, and the class teacher urges the students to return indoors. Students are strictly forbidden to make noise in the classroom so as not to cause panic. The class teacher will check the students' discipline and attendance.
3. During a thunderstorm
(1) Students stay in the classroom to study, the head teacher or any teacher will come to manage the class discipline, and the teacher on duty will strengthen inspections.
(2) If students are on their way to and from school, they should immediately find a safe place to shelter from the rain, call their parents to take them home, and call the class teacher to fulfill the leave formalities.
(3) If students stay at home and the situation is not suitable for school at that time, they can call the class teacher to go through the formalities of asking for leave.
(4) The head teacher should strengthen the management of students' attendance, and contact parents for students who are not in school to find out their whereabouts.
4. The general affairs department shall organize the protection of buildings, facilities and equipment.
5. After the thunderstorm, each class teacher should immediately report the personnel and materials to the General Affairs Office, and each office should quickly report the personnel and materials to the principal's office.
Emergency Plan for Three Preventions, Wind Protection and Snow Protection in Winter 5 I. Guiding ideology for typhoon prevention and disaster relief:
Under the unified leadership of xx District Education Bureau, the typhoon prevention and disaster relief work of our school aims at reducing the loss of state property and the safety of teachers and students, minimizing losses, effectively ensuring the safety of life and property of the school and teachers and students, and maintaining the normal teaching and living order of the school. Based on the principle of giving priority to typhoon prevention, supplemented by assistance, according to national laws, regulations and related policies, combined with the actual situation of our school, we have formulated an emergency plan for typhoon prevention.
Second, set up an emergency working group:
School typhoon prevention leading group:
Members: all teachers
Three, the main points of flood control:
1. Teaching building, multi-function hall, canteen, gymnasium and other buildings.
2. Ensure smooth drainage inside and outside the school.
3. Strengthen the traffic guidance for students going to and from school in typhoon, rainstorm and thunderstorm weather.
4. Improve the ability of teachers and students to protect themselves from sudden weather changes (storms, thunderstorms, lightning, etc.). ).
Fourth, the preparations before the typhoon:
1. mental preparation: through various propaganda tools and forms, vigorously publicize the knowledge of flood control and disaster relief, educate teachers and students, and fully understand the significance of flood control and disaster relief. Resolutely overcome the paralysis of fluky psychology, establish the idea of "believing in what it has, but not believing in what it has" and the view of "standing if you give it, and wasting it if you don't give it", and always be ready, always be ready.
2. Organization preparation: establish the responsibility system for typhoon prevention inspection, clarify responsibilities and tasks, do a good job in safety inspection before typhoon, and make suggestions on problems and hidden dangers found in inspection. Attach great importance to typhoon prevention and disaster relief, strengthen typhoon prevention duty and safety inspection, implement various typhoon prevention measures, ensure smooth communication, and establish a supervision mechanism.
3. Work preparation: strengthen the inspection of all kinds of flood control, flood control and windproof work, rectify the problems within a time limit when found, attach great importance to school safety during the typhoon, carefully investigate various safety hazards, and ensure the safety of teachers and students' lives and property.
4. Material preparation: according to the requirements of emergency rescue in possible danger, prepare emergency materials and equipment in advance for emergency use. Strengthen the inspection and supervision of key parts of typhoon prevention, and have sufficient emergency repair force during typhoon to effectively prevent flood emergencies.
Verb (abbreviation of verb) Emergency response to typhoon prevention and disaster relief:
1. After receiving the notice from the higher authorities to prepare for emergency typhoon prevention, or according to the impending disaster caused by typhoon, the school immediately started the typhoon prevention and relief system, arranged disaster prevention work, entered the emergency state in an all-round way, and did all kinds of emergency work well.
2. According to the actual situation of typhoon prevention and disaster relief in our school, organize the implementation of emergency response work plan, carry out typhoon prevention and disaster relief work in our school and carry out rescue operations according to the establishment of typhoon prevention and disaster relief institutions.
3. During the whole typhoon, the principals of each campus will arrange for the team members to take turns to be on duty at school, and the duty personnel and duty leaders should be in place in time. The personnel on duty should patrol the campus frequently, and report to the principals and relevant leaders of each campus immediately when finding dangerous situations.
4. Strengthen patrol on duty. In case of heavy rain and long rain, we must pay close attention to the surrounding areas of the school. Once the danger is found, it is necessary to start the relevant emergency plan in time and evacuate teachers and students.
5. Strengthen the traffic guidance for students when they go to and from school during the typhoon. Ensure smooth drainage inside and outside the school.
6. In case of danger, the building should be closed immediately and the construction should be stopped, and the teachers and students should be transferred to a safe residence in time to ensure the safety of teachers and students.
7. Post safety warnings in conspicuous places to improve the safety awareness of teachers and students.
8. Prepare classrooms for the victims in the surrounding areas.
9. If there are any injuries, property losses or serious accidents, the school will report to the xx District Education Bureau and the relevant departments at higher levels as soon as possible.
10. Call for help 1 10. Fire alarm 1 19. Medical assistance 120. Traffic accident 122.
;
- Related articles
- The weather in the north is getting warmer and warmer.
- The female traffic police warm-hearted princess was praised for throwing the woman. What should I pay attention to when traveling in rainy days?
- Extend the weather for a week
- The weather forecast for Lushun tomorrow
- Urgent need for folk stories
- What's the difference between sea water temperature and air temperature in summer?
- How does the tortoise know about the weather change?
- What does the symbol of weather forecast mean?
- I want to travel to Rizhao, Shandong by 19. What is the temperature there?
- Do me a favor, Joker!