Traditional Culture Encyclopedia - Weather forecast - Emergency plan for typhoon prevention
Emergency plan for typhoon prevention
Accidents will inevitably occur in daily study, work and life. In order to reduce the consequences of accidents, it is often necessary to make emergency plans in advance. So what problems should we pay attention to when preparing the emergency plan? The following is my emergency plan for typhoon prevention, which is for reference only and I hope it will help you.
Emergency Plan for Typhoon Prevention 1 I. Disaster Prevention
1. The school safety work leading group is responsible for accepting the instructions of the superior disaster prevention headquarters, making emergency plans for preventing natural disasters in the school, deploying emergency defense against natural disasters such as typhoons, rainstorms and lightning on campus, and doing a good job in emergency rescue and restoring normal teaching on campus.
2. The school office is responsible for seriously publicizing, implementing and executing the instructions of the superior on disaster prevention and transmitting disaster prevention information.
3. The Moral Education Department is responsible for organizing teachers and students to learn to distinguish the warning signals of typhoons, rainstorms, earthquakes and other disasters, and to master the knowledge of disaster prevention and self-help.
4. The General Affairs Department regularly and irregularly investigates the hidden dangers of classrooms, underground drainage pipes, power supply lines, canteens, fire safety facilities, trees, wall newspaper columns, glass doors and windows on campus, reports problems to superiors in time, and urges timely rectification.
5. The Security Department formulates and implements emergency rescue and disaster relief plans, organizes drills, and guides all teachers and students to simulate preventive drills.
Second, the disaster prevention emergency plan
1. Leader of leading group and responsibility group: Xiao Zeping
Deputy team leaders:, Li Yong,,, Wei Xiufang, members: Xu Fang, Luo Ronghua, Ju Bin, Xue,,.
Zheng Yecuiping Zhu Li Guoan Lu Guibin Sun Qing Wang Weiguo Star Chen
Chen Yujun, Zhu Liang, Wang Ping, Zhang Wei, Ding Yong, head teachers of each class, heads of teaching and research groups, and heads of each grade.
Main responsibilities:
(1) Strengthen leadership, improve organization, strengthen work responsibilities, and improve the formulation of various emergency plans and the implementation of various measures.
(2) Take all necessary measures, organize all forces to carry out rescue work in an all-round way, and minimize the losses caused by disasters.
(3) Mobilize all positive factors to fully guarantee and promote school safety and stability.
(4) Do a good job in publicity and education on natural disaster prevention and organize disaster prevention exercises. Improve teachers and students' awareness of prevention.
2. Communication Liaison Group and Head of Responsibility: Zhu Yuhong Member: Luo Ronghua.
Main responsibilities:
(1) If it is necessary to suspend classes after receiving instructions from superiors, weather monitoring and forecasting information and early warning signals, members of the school communication network will immediately transmit the information to relevant teachers, students and parents, and immediately take measures to suspend classes on holiday.
(2) The communication group keeps in touch with the leading group for emergency work of the education system at any time, and enters the combat readiness state after receiving the information of typhoon and rainstorm, and stands by at any time.
(3) timely report the school disaster, disaster relief and related situations.
3. Safety protection and rescue team and responsible team leader: Han Hongmin.
Members: all members of the security department and the school doctor.
Main responsibilities:
(1) In case of a disaster, organize all personnel to cut off the power supply, check and reinforce the hanging objects outside the window, check the flagpole and wall post to prevent hanging objects from falling and hurting people, and check and keep all kinds of electrical appliances.
(2) Organize the head teacher of each class to be responsible for closing the doors and windows of the classroom and the doors and windows of the office and grade group. Teachers in the information center are responsible for checking the power switches in the computer room and multimedia room.
(3) When natural disasters such as typhoon, rainstorm and lightning suddenly occur, organize students to take refuge in safe places.
(4) In case of personal injury, actively organize rescue.
4. Aftercare Team and Team Leader: Wang Junxiu.
Member: Star Chen Yujun
(1) When destructive disasters occur, do a good job of self-rescue immediately, carry forward the spirit of hard work and self-reliance, and carry out self-rescue activities under the leadership of superiors.
(2) do a good job in health and epidemic prevention, do a good job in post-disaster sanitation and disinfection, prevent infectious diseases from breeding and spreading on campus, and ensure that there is no major epidemic after the disaster.
(3) scientifically arrange the class time after the disaster, so that the school education and teaching can return to normal as soon as possible.
Emergency Plan for Typhoon Prevention 2 1 General Provisions
The purpose of compiling 1. 1
In order to effectively prevent production safety accidents, minimize the harm and consequences caused by typhoons, and reduce casualties and property losses.
1.2 compilation basis
According to the Overall Emergency Plan for Public Emergencies of Quanzhou Municipal People's Government, the Work Plan for Flood Control and Typhoon Prevention of Quanzhou Construction Management Bureau and the Emergency Plan for Flood Control and Typhoon Prevention of Quanzhou Construction Engineering Quality and Safety Supervision,
Plan ","guidelines for the preparation of emergency plans for production safety accidents of production and business units "and other relevant regulations.
1.3 Scope of application
Does this plan apply to Zhong Jun? Typhoon prevention in Discovery Bay housing construction project.
1.4 working principle
People-oriented and safety first; Prevention first, quick response and decisive disposal.
2. Risk analysis
Anti-typhoon danger of cantilever scaffold, tower crane and people-cargo elevator, flood control and landslide prevention of deep foundation pit slope, typhoon prevention of formwork engineering, typhoon prevention of temporary facilities, typhoon prevention of temporary electricity facilities and typhoon prevention of construction machinery and equipment.
2. 1 Basic information of the project
Project name: Zhong Jun? Discovery Bay Residential Project:
Project Address: The project is located in Meilin Community, Nan 'an City, north of Jiangbei Avenue (binjiang road) and west of Meilin Seventh Road.
Project overview: Project name: Discovery Bay Residential Project in Zhong Jun. Construction unit: Nan 'an Hong Jun Real Estate Development Co., Ltd. Survey unit: Fujian Geotechnical Engineering Survey and Research Institute Design unit: Fujian Wu Min Architectural Design Institute Co., Ltd.
Supervision unit: Xiamen Shengdexin Engineering Management Co., Ltd. General contractor: Zhongtian Construction Group Co., Ltd.
The total land area of this project is 527 19m2 and the total construction area is 2 15502.74. The proposed project consists of a 16 high-rise building, a 12-storey commercial building, a 2-storey storefront and a 3-storey kindergarten with an integral basement. This project is designed by Fujian Wu Min Architectural Design Institute Co., Ltd., with an elevation of 0.00:
Buildings 1# and 2# are 21.25m; 3# -6# building is 21.50m; 7# -8# building is 2 1.25 m 9#-10 building is 21.25m; 1 1#-12# building is 21.50m13 #-16 # building is 21.25m; 17 # building is 23.45m 18# building is 2 1.60 m, and commercial building is 21.221.50m; Pure basement 20. 15m.
3, emergency rescue organizations and responsibilities
Construction site management network diagram
3. 1 emergency headquarters of Project Department
The project department set up an emergency leading group for typhoon prevention, with project manager Zhou Yamei as the team leader, project technical leaders Min and Wang Ting, safety officer Zeng, production manager Fang Xiufeng, construction team members He Xiaoquan, Huang Junfeng, Lou Yongquan, Wang Chaofeng,,, He Peiquan, materials engineer Chen Xiangbin and team leader Liu Zhangyong. Emergency headquarters unified command of typhoon emergency response, was responsible for the command of emergency rescue of this project, requested rescue from relevant rescue departments of enterprises and government, reported the rescue situation, and approved the start and termination of this plan.
3.2 each construction team
According to the actual situation of Zhong Jun Discovery Bay residential construction project, implement the typhoon prevention measures formulated by the project and obey the deployment and command of the project.
4. Classification of typhoons
According to the scope and degree of typhoon influence, the typhoon warning level is divided into four levels: I (particularly serious), H (serious), dish (heavier) and W (general). When the intensity, scope, landing location and damage degree of typhoon change during its development, the early warning level should be adjusted in time.
4. 1 early warning stage
Within 48 hours, the project area may be affected by tropical cyclones. 4.2 W class (general) early warning
Within 24 hours, the project area may be affected by tropical cyclones, with an average wind force of above 6 or a gust of above 7; Either it has been affected by tropical cyclones, with an average wind force of 67, or a gust of 78 and may continue.
4.3 dish level (heavy) warning
Within 24 hours, the area where the project is located may be affected by tropical cyclones, and the average wind force can reach above 8 or the gust is above 9; Or it has been affected by tropical cyclones, with an average wind force of 89, or a gust of 9 10 and may continue.
4.4 (severe) early warning
The third emergency plan for typhoon is to ensure that emergency rescue and disaster relief work can be carried out quickly, orderly and efficiently when there is a rainstorm and flood disaster in the dreamless scenic spot of Piaocheng, and strive to reduce the losses caused by the rainstorm and flood disaster, ensure the life and property safety of tourists and staff, and promote the sound and rapid economic and social development of the scenic spot. This plan is formulated according to the spirit of provincial and municipal finger prevention instructions and relevant laws and regulations, combined with the reality of Gone with the Wind Dreamless Scenic Area.
I. Organizational structure
Set up a leading group for storm flood prevention and emergency work in Gone with the Wind Dreamless Scenic Area, with the following members:
Team Leader: Deputy Team Leader: Zhen Su
Members: Zhen Tao, Zhen Jing XXXXXXX
There are three working groups under the leading group, namely, the Office of the Leading Group for Emergency Work and the Inspection Team for Flood Control and Emergency Work.
The first working group leader: XXXX, deputy leader: XXXX, member: XXXX; The leader of the second working group: XXXX, the deputy leader: XXXX and the member: XXXX.
The leader of the third working group: XXXX, the deputy leader: XXXX, and the member: XXXX. The office of the leading group for storm prevention, flood control and emergency work has been established, and the office director is XXXX.
Set up an emergency inspection team for rainstorm flood control, with team leader: XXXX, deputy team leader: XXXX and member: XXXX.
Second, the focus and work requirements of early warning and prevention
1, comprehensively investigate the potential safety hazards that rainstorm and flood may bring to the uphill roads in scenic spots, maintain waterways, handle problems in time when found, and report to the leading group for rainstorm and flood emergency work.
2. Strengthen building safety monitoring in scenic spots. Each working group implements the leadership responsibility system according to the responsibility area.
3. Strengthen the safety monitoring of scenic slopes. Prevent landslides and mudslides.
4. Do a good job in the safe evacuation and transfer of tourists and staff during the rainstorm and flood disaster.
Third, strict work discipline.
Members of each working group should go deep into the area of responsibility, lead and supervise the implementation of the work responsibility system in the area of responsibility, and investigate the relevant leadership responsibilities according to law for accidents caused by sloppy work, carelessness and absence.
Four, do a good job on duty, report the storm and flood disasters as required.
1. "Gone with the Wind" Dreamless Scenic Spot All members of the leading group for emergency work of rainstorm flood control arrived at their posts in time and did a good job on duty.
2. The emergency duty room for storm prevention and flood control in scenic spots should be recorded on duty for future reference. Keep records clean and complete.
Emergency Plan for Typhoon Prevention 4 In order to do a good job in typhoon prevention, the Hotel Emergency Plan for Typhoon Prevention is revised and issued, and all hotels are requested to follow it.
I. Organizational structure and responsibilities
The hotel set up the emergency headquarters for flood prevention and typhoon prevention. When the typhoon comes, all members of the headquarters must immediately do a good job in flood prevention and typhoon prevention and hotel duty. The organization is as follows:
Commander-in-Chief: Executive General Manager of the Hotel
Deputy commander: the general assistant in charge of safety work in the hotel.
Member units: Housekeeping Department, Catering Department, Front Office Department, Engineering Department, Security Department and Finance Department.
Second, the typhoon plan
(1) Pre-typhoon self-inspection preparation
1. Front hall: collect decorations such as banners, lanterns and POP bulletin boards at the door; Put a typhoon information bulletin board in the lobby or elevator entrance, and prepare a typhoon reminder card to the housekeeping department for distribution into the room; Prepare umbrellas and rain gear. Every employee at the front desk should know the typhoon information, answer the guests' inquiries in time, and prepare the emergency lighting at the front desk. The lobby assistant should set up a post in the lobby, do a good job of customer inquiry, pay attention to the situation at the door and lobby and report in time to ensure the normal business order of the lobby.
2. Housekeeping Department, Catering Department and Finance Department: Check and close the doors and windows of all rooms, boxes, walkways and corridors; Do a good job of typhoon prevention for guests, and inform housekeeping department to equip rooms with typhoon warning signs; Prepare emergency lighting;
3. Operator: responsible for understanding the typhoon situation and reporting to hotel leaders and relevant departments in time; Prepare emergency lighting and walkie-talkies, check whether the standby power supply of the switchboard works normally, provide emergency service for power failure under the guidance of the department manager, and do a good job in guest inquiry service.
4. All departments should prepare for the loss of linen 1 day in advance in case of emergency.
5. The Engineering Department will conduct a comprehensive inspection of the hotel periphery, platforms, neon lights, billboards, satellite receivers, doors and windows of various business departments and tenants, and reinforce them with wires, ropes and wooden stakes. And temporarily dismantle the unstable store. Check the important parts such as the underground electrical room, strengthen the hotel door, and cut off the circuit that may cause fire due to short circuit. The pool should be filled with water to ensure the normal supply of water, electricity and gas in the hotel, and sufficient sandbags should be prepared.
6. The comprehensive office is responsible for conveying typhoon information to all employees of all departments, and arranging the heads of all departments to stay in the store for duty.
7. The security department informs the dormitory security guards to be diligent, and cooperates with the engineering department to check whether the sewers and ditches in key parts such as the periphery and roof of the hotel are unobstructed, and prepare lighting appliances, rain boots and raincoats, helmets, flashlights and emergency lights.
(II) Re-inspection: The heads of the General Office, Engineering Department and Security Department shall re-inspect the preparations of all departments according to the above provisions.
(3) When the wind is strong, emergency procedures should be started:
1. The heads of the security department and the engineering department should stay in the hotel, deal with sudden dangers at any time, and ensure that there are enough manpower and material resources to do emergency maintenance and remedial work.
2. If there is water seepage in guest rooms, boxes, linen, drinks and food warehouses, subordinate departments should immediately transfer the contents of the rooms to a safe place, and the engineering department should do a good job of plugging and drainage.
3. The rainwater at the front door may flow backward into the lobby, and the security department and the engineering department will pile sandbags at the door to prevent the inflow. PA class is responsible for sending additional personnel to clean up the accumulated water.
4. Rain from the back door may flow back into the employee elevator. The security department and the engineering department will pile sandbags at the back door to prevent the inflow. The security guard at the back door post is responsible for removing stagnant water. If the rainwater has flowed backward into the elevator, the engineering department should immediately control the elevator to the floor above 1F, and it is forbidden to let the elevator run to-1f-2f.
5. When the wind is strong, the front door and back door should be reinforced with wooden plugs and boards to prevent the glass door from being damaged by the wind. When strengthening, some glass doors should be kept open properly to reduce the wind resistance to the glass doors. The front door glass should be the responsibility of the bellboy and the foreman of the security department. The rear door glass is guarded by the security guard at the rear door post.
6. When the wind is strong, the porter of the past security guard should pay attention to falling objects and guide the guests to park their vehicles in the underground garage. They should wear safety helmets when necessary. The desk lamp and flowerpot placed at the front desk should be put away in the front hall to avoid being blown down by the wind.
7, if there is water in the elevator, the engineering department should immediately start the drainage system, eliminate water, so as to avoid if the wind is strong and the passenger elevator can't run, the dining room screen should be pushed to the elevator.
8. In case of power failure, the Engineering Department will immediately contact the Property Office to generate electricity and restore lighting. The security department maintains the security order of the hotel during the power failure. In case of power failure, the restaurant manager is responsible for taking care of the cashier in place, and the cashier at the front desk is the responsibility of Qianmen Gang and Security Department 02 or 0 1. Assistant manager of the lobby,
0 1 02: Do a good job in elevator service, ask if there are any detained guests, and do a good job in appeasing the detained guests. Floor staff and department managers should be dispersed to all floors and restaurants to explain and appease the guests.
9. When the drainage ditch is blocked, the Engineering Department and the Security Department will send someone to dredge it. Dredging personnel should pay attention to their own safety and must wear safety helmets. If necessary, you should wear a safety rope, and two people should cooperate with each other in tandem. Pay attention to whether the electrical equipment on the roof equipment floor has leakage.
10, when the wind is particularly strong, the office should be responsible for informing the dormitory staff not to go out, and the staff living outside the store should arrange to stay in the hotel. The heads of offices and departments should discourage off-duty personnel from leaving the hotel, and the office should make accommodation arrangements for stranded personnel.
1 1. The switchboard is responsible for understanding the typhoon situation through TV and reporting the typhoon situation to the heads of various departments in time. If airports, highways and bridges are closed, they should report to the front hall in time, and the front hall should inform hotel guests in time.
12. The executive general manager of the hotel, the manager of the engineering department and the manager of the security department should stay in the hotel to make emergency preparations. Whether other department managers stay in the hotel or not shall be subject to the hotel arrangement, and if they leave the hotel, they shall be reported to the hotel administrative director for approval.
(four) after the typhoon caused hotel losses, all departments should summarize and report the losses within two days.
;
- Related articles
- Why not kindle?
- Why didn't it thunder in the second half of the year?
- Longsheng weather in the coming week
- Summary of geographical knowledge points in the first volume of the eighth grade
- How to delete the weather forecast records before 15 days?
- Which province is Bashang grassland in?
- Eight scenic spots in Jintan
- Weather forecast for September 2 nd
- The weather in Tuoketuo county on August 3rd is 20 16.
- Where is the willow branch expression in Sina Weibo?