Traditional Culture Encyclopedia - Weather forecast - When will the Luomen-Mawu section of Li Jing Expressway start?
When will the Luomen-Mawu section of Li Jing Expressway start?
The section from Luomen to Mawu of Li Jing Expressway started in March 2023. According to the relevant information, it is planned to start construction in March 2023. The route starts from Lijiaping in the west of Luomen County, Wushan County, and is connected with the G30 Lianhuo Expressway, passing through luomen town, Wenquan Town, Simen Town, Yan 'an Township, Mawu Township, Fenshuiling (the boundary between Luomen County and Lixian County), Barrow Town and Lixian County North, and ends at Xiakou Village, Daozhen Town, Xihe County, and is connected with Shi Tian Expressway. The total length of the route is 100.8. The main line adopts two-way four lanes, with subgrade width of 25.5 meters and design speed of 80 ㎞/h. 。
- Related articles
- Weather forecast of Xinglong town in Fengjie
- Touching stories of historical figures
- How do you know when it's windy and rainy? Let me tell you a weather forecast. That's the word that was said in the cross talk.
- How to raise a god of wealth tree from all directions?
- Does Zhangjiagang belong to Suzhou, Jiangsu?
- When is the best time for Dongguan Fengjing Golf Club to play?
- Common numbers in life: (1) The postal code is _ _ _ _ digits, your home postal code is _ _ _ _, and your home long-distance area code is _ _ _ _ _.
- How many counties are there under Chifeng City? What is the name of each county?
- Historical door god
- How to Modify Rainy Days in Medieval 2