Eight. Strengthen the security work during the Olympic Games and earnestly implement the measures of "civil air defense, physical defense and technical defense".
With the approaching of the Olympic Games, as the key unit of natural gas production, the project department takes "basing itself on the inside and linking the inside and outside" as the working principle, and carries out specific work from three aspects: civil air defense, physical defense and technical defense to ensure the safety of wells and stations and the stability of the team during the Olympic Games. First, the Regulations on the Management of Key Parts and the Measures for the Management of Attendants at Gas Gathering Stations were issued, which further put forward detailed requirements for the inspection frequency, inspection scope and management of outsiders in gas gathering stations and single well stations. The second is to actively rely on the safety supervision of herdsmen on the production area, and guide and cultivate herdsmen's awareness of joint defense of our gathering and transportation pipeline network. Through the distribution of leaflets on Regulations on the Protection of Oil and Gas Pipelines and on-site visits, the education of pipeline protection for herders and related units has been deepened, and the preventive ability of well facilities has been fundamentally improved. Third, whether the electrical lines of gas gathering stations, workers' shift points and logistics stations conform to the specifications, whether the fire-fighting facilities are in good operation, whether the safety evacuation passages are unblocked, whether the emergency lighting is in good condition and effective, and whether the fire safety inspection focuses on whether the exit evacuation indication signs meet the requirements, whether the combustible gas alarm system and the fire safety responsibility system are implemented, etc. According to the inspection results, 18 fire-fighting equipment was immediately supplemented; Install the safety sign 45; Replace combustible gas detection module 3 to curb all kinds of fires from the source. Fourth, the prevention and control of hazardous chemicals has been strengthened. On the one hand, through procurement, transportation,
Risk assessment was carried out in storage, use and destruction, and the methanol management system was issued in time; On the other hand, the vehicle condition of methanol hauling vehicles and the methods used by escort personnel in the emergency department of dangerous chemicals were inspected and guided, which avoided the occurrence of out-of-control events such as missing report, theft and loss of methanol due to poor management.
Nine, consolidate the daily safety management, and constantly improve the level of safety and environmental protection management. A, adhere to the project department once a quarter, once a month at the grass-roots unit, each team once a week combined with the safety inspection system. Mainly carry out systematic inspection on gas gathering stations, single wells, private drilling teams and related vehicles. At present, * * * has issued 59 rectification notices and found 224 problems. Now 2 19 has been rectified, and the rectification rate is 98%.
The second is to strictly implement the "three simultaneities" system to ensure the essential safety of the new station from the source. Since April, combined with the progress of the new station project, the safety section has successively carried out fire declaration, pressure vessel registration, fire safety material deployment, water quality testing, warning board installation and other work. At present, all new pressure vessels have been registered; Fire fighting construction and inspection and deployment of fire fighting materials are under way; The water quality test has completed the preliminary sampling work and is waiting for the test results to reply; The installation of warning signs is expected to be completed in mid-July.
Third, do a good job in the effectiveness inspection of special equipment and safety accessories in production and operation, and actively contact relevant units to complete the regular inspection of 153 safety valve, 43 positive pressure air respirator and 34 pressure vessels to ensure the normal operation of safety infrastructure.
Fourth, earnestly implement the three-level safety education for new employees, actively and accurately.
Prepare safety education and training courseware, test questions and three-level education cards. On May 25th and June 22nd, together with production, geology, technology and other departments, 50 new employees were systematically and professionally trained in production safety knowledge in this industry, which effectively enriched employees' knowledge of gas production and raised their awareness of "three evils".
Ten, strengthen the traffic control of internal vehicles.
With the increase of construction units in the well area, the road load increases, and the traffic safety risk also increases year by year. We have made great efforts in strict vehicle management system, strengthening road risk early warning, deepening driver awareness education and behavior education to ensure the personal safety of drivers and passengers in the project department. First, strictly control the entry of leased vehicles. Strictly review the leased vehicles and drivers in accordance with the Management Measures for Access of Transport Vehicles and the Management Measures for Traffic Safety of Oilfield Company to ensure the safety and reliability of technical performance. At the same time, according to the requirements of HSE management, the qualification, quality, physical condition, driving skills and other comprehensive abilities of assigned drivers are assessed. Assessment will be conducted, and those who fail the assessment will be resolutely rejected. Second, conduct a comprehensive risk assessment of the roads in the well area, set up speed bumps and road warning signs at the forks and turning corners in crowded areas, and issue the Notice on Strengthening Internal Traffic Control according to the road load and road technical conditions, scientifically divide the speed limit areas, and clarify the relevant requirements for overtaking and traffic. Three, adhere to the safety education meeting with the theme of "slow down, prevent illegal driving, civilized driving" once every two weeks, improve the driver's consciousness of consciously observing rules and disciplines, and achieve the purpose of regulating driving. Fourth, pay special attention to the bad weather and vehicle control in Tomb-Sweeping Day and the May Day holiday, strictly examine and approve the system, and timely carry out the road for vehicles to go out to perform tasks.
Risk early warning and all-weather dynamic tracking.
Eleven, attach great importance to emergency management, improve the ability to prevent and deal with emergencies.
Starting from the actual production and construction, the project department adopts various forms to improve the emergency management system. First, starting with strengthening the construction of emergency teams and emergency infrastructure, we have established an emergency command and dispatch system with the production scheduling of the project department as the main line, an emergency information transmission and release system with the office as the main line, an emergency daily supervision system with the safety and environmental protection as the main line, an emergency disposal system with the dispatching room in the operation area as the main line, and an emergency material reserve system with the emergency warehouse of the project department and the emergency warehouse in the operation area as the main line. At the same time, we have strengthened information communication and contact with local governments and brother units, and improved our early warning, alarm and emergency response capabilities. Second, intensify emergency drills, and formulate semi-annual level II emergency drills, monthly level III emergency drills and weekly level IV emergency measures, so that post personnel can master on-site emergency handling procedures and key points, and fully exercise and improve the team's emergency handling ability. Third, summarize the shortcomings in emergency drills in time, and constantly revise and improve emergency plans at all levels in accordance with the principle of "practicality, simplicity, clarity and strong operability".
Twelve, to carry out safety prevention and control work in summer and flood season.
At present, it is in the summer flood season, with high temperature and more thunderstorms and strong winds, which is the prone and high-incidence period of various accidents and disasters. In order to curb accidents, the project department organized and carried out prevention and control work focusing on flood control, lightning protection, heatstroke prevention and cooling, and food poisoning prevention. First, in order to nip in the bud and ensure that nothing is lost during the flood season.
Once lost, the project department has made careful arrangements according to the relevant requirements of the oilfield company for flood control and flood fighting, revised and improved the flood control and flood fighting plan, set up a two-level leading group for flood control and flood fighting, set up a rescue commando team, and completed the reserve of flood control materials. The second is to collect and upload "Little Common Sense of Lightning Protection in Summer" for all employees of the project department to learn and communicate, improve lightning protection awareness and cultivate good lightning protection habits. The third is to arrange the logistics service team to provide cool drinks for the employees on duty every day, and at the same time, reasonably adjust the production shifts and operation time, try to stagger the high temperature period at noon, and reduce the impact of high temperature and sun exposure on employees. Fourth, eight safety measures to prevent bacterial food poisoning were formulated, and Xi 'an and its staff canteen were specially inspected, focusing on the safety and health certificates of employees, "disinfection" facilities, food warehouses and the sanitary conditions of processing places.
Thirteen, strengthen pollution prevention and control, and further promote cleaner production.
The project department always adheres to the environmental protection concept of "protection first, efforts to restore", and takes strict implementation of the "three simultaneities" system as the breakthrough point of source control to optimize the design of environmental protection facilities. In the process of production, construction and production, we should focus on the site selection of new stations, single wells, roads and pipelines to minimize the damage to vegetation. Strengthen the daily supervision in the construction process, adhere to the principle of "whoever pollutes will treat it", and deal with the garbage generated in the construction process in time. At the same time, with the goal of "building a gas field and leaving a green area", the well greening project was started in early April this year. Up to now, the greening construction and vegetation restoration of staff quarters, 3 gas gathering stations, 4 access roads and 80 single well stations have been completed.
There is something wrong with the second part.
1, in March this year 10, the wellhead out of control accident occurred during the maintenance of the Christmas tree 1 valve of Well Su 36-3-9. As can be seen from the accident investigation results, the project department still has some shortcomings in safety management. After that, although we improved the safety management network, the management system of dangerous operations, strengthened the safety training of employees and improved the effectiveness of emergency plan drills, in our daily work, there are still phenomena of greatly discounted systems and measures, and safety management is hot and cold.
2. Recently, the phenomenon of vehicle traffic violations in the project department is on the rise, especially the illegal acts such as speeding and overtaking have been repeatedly banned, ignoring the requirements of speed limit and overtaking in various sections in the Notice on Strengthening Internal Traffic Control of the Project Department, which has increased the risk of passengers in the project department.
3.20 15 years, the project department completed 108 wells and produced 108 mud pools, of which 24 wells were treated and 84 wells were untreated. In 20 15 years, it is planned to complete 180 wells and produce 180 mud pools. However, due to the lack of funds for mud pit management and well site vegetation restoration, the mud pit management and well site vegetation restoration of the project department have not yet started.
4. At present, the underground pipe network of Su 6 and Su 36-1/well area under the jurisdiction of the project department is complex. 324.78 kilometers of gas production pipeline and 32.79 kilometers of gas gathering branch line have been built. At the same time, about 300 kilometers of gas production pipelines and 50 kilometers of gas gathering branch lines will be laid this year, which will make the buried pipe network more dense. Because the project department is in the period of rapid development of production and construction, there are many fields in the well area, such as seismic exploration, drilling and new well networking.
External building works.
The third part of the next step arrangement
1. Continue to thoroughly implement the "six prohibitions", intensify the "three violations", strengthen the safety quality education of employees, extensively carry out safety production supervision activities for all employees in key areas, key positions and accident-prone points, and do a good job in the supervision of construction contractors and job sites without relaxation.
2. Continue to tighten the string of safety and security, especially in the joint defense management of enterprises and places, management of foreign personnel, fire safety management, management of dangerous chemicals, etc., to ensure foolproof during the Olympic Games.
3. As the reconstruction and expansion project of the gas gathering station has been basically completed, the task of putting single well into production is still arduous, and the lifting of the compressor will continue when the road construction of the new station is delayed. To this end, we continue to insist on moving the pass forward, strengthen the on-site monitoring of single well joints, series hot work, road intersection groundbreaking work and compressor hoisting work, and strictly monitor the duty to prevent all kinds of accidents.
4, through the network, centralized learning and other forms, the full implementation of the accident control (ACT) card, guide employees to analyze unsafe behavior or unsafe state in production practice, and promote employees to manage safety independently.
5. In order to promote the smooth development of the production and business activities of the project department, the process of handling the Hazardous Chemicals Business License is accelerated according to the Regulations on Safety Production License.
6. Insist on holding traffic safety meetings, strengthen safety awareness education for drivers, standardize drivers' safety behaviors, and focus on checking bad weather conditions and roads.
Traffic safety management during holidays, strict examination and approval system. And the driver's job skills assessment. Comprehensive evaluation is made on drivers from the aspects of theoretical examination, driving skills, vehicle maintenance and personnel quality.
7. Carry out targeted and diversified safety training to ensure that the quality and skills of employees fully meet the production needs. At the same time, we should adopt a multi-level and regular instillation of the safety concept with intrinsic safety and advanced prevention as the development direction, so that employees can truly understand "who is the safety work for" and strive to form a safety behavior model with full participation, shared responsibility and independent management.
8. Strengthen the management of safety production in winter, focusing on the special inspection of safety production in winter. Strictly implement the production and construction procedures, prohibit simplifying the operation procedures, conscientiously implement the requirements of "Ten Preventions", put an end to the phenomenon of "Three Violations", and take fire prevention, explosion prevention, theft prevention and prevention of damage to key parts of production as the top priority. At the same time, in view of the influence of mobile sand dunes on the buried depth of pipelines, we should increase the number of pipeline inspections, actively rectify the problems such as insufficient buried depth or exposure of pipelines, and organically combine the buried depth of pipelines with sand fixation to minimize the impact of low temperature on safety production.
Safety and environmental protection work report materials [2]
Leaders:
On behalf of the safety and environmental protection work of ..., I report to the leaders as follows:
... has * * * … employees, including … regular employees and … contract workers; * * * … sets of mechanical equipment (sets), including … construction machinery vehicles and … other vehicles, with the equipment intact rate of 60%. I have four engineering teams and an engineering survey and construction design team. The four engineering teams are: pre-drilling construction team, mechanical engineering team, water well engineering team and road maintenance team, mainly engaged in pre-drilling engineering, water well engineering, road and bridge engineering and engineering survey, design, construction and technical services.
... summary of safety and environmental protection work in the first three quarters;
I. Key points of safety and environmental protection work:
1, carry out safety education and training, and comprehensively improve the quality of employees.
2. Conduct an emergency plan drill once a month to improve the emergency response ability of employees.
Ability. Seriously comment, summarize and improve.
3, the construction site inspection should focus on safety and environmental protection, mainly for the construction site environment.
Sanitation and vegetation of the borrow site. Immediately rectify the problem when it is found.
4. Vehicle maintenance.
5. Vehicle annual inspection, insurance, operation certificate and second insurance.
6. Safety inspection of the base.
7. Deal with any emergency.
Second, the staff training:
From March 25th to 27th, the Bureau Training Center came to … to train all employees on HSE and H2S knowledge.
2, the main person in charge of the production and business operation entity is responsible for the safety in production of the unit. 3. Safety emergency rescue system. 4. Safety management system. 5.HSE management system.
On February 6, 2008, safety education and training were conducted for the water well team, the main contents of which were safety production ban and operating procedures.
On February 25, 2008, all the staff of the road maintenance team of our engineering department received the safety production ban and road safety knowledge training.
On March 4th, 2008, the main contents of the existing personnel safety training in the base were: 1, HSE management system 2, employees' obligations and rights 3, labor law.
On March 15, on-site first aid principle training was conducted.
In addition, pre-job safety education and training will be given to new employees.
Third, I want safety: strengthen the publicity and education of employees' safety knowledge, let employees change their safety concepts, build a safety production levee from "I want safety" to "I want safety", and strengthen employees' safety awareness. Since the pre-job oath and signing ceremony of "I want to be safe" began on April 20, all employees of the engineering department have been insisting on taking the oath of "I want to be safe" every Monday.
Four, bureau, bureau of professional safety production ban manual publicity and implementation:
After receiving the "Safety Production Prohibition Manual" from the Bureau and the Branch, it will be distributed to each employee in time, organized to fill it out, learned deeply through careful study, and conducted spot checks. Ensure the accurate implementation and enforcement of the ban.
Five, key equipment and key parts of leading cadres safety contracting activities:
Carefully check and implement.
Six, lightning protection, anti-static and various safety monitoring instruments account and test report: regular and irregular testing.
Boiler … year formalities are being processed.
Fire fighting equipment: check it every month and update it regularly, so that employees can skillfully use all kinds of fire fighting equipment.
Seven, emergency plans, emergencies, emergency supplies reserve:
Conduct emergency drills and emergency plans once a month, and carefully organize their implementation, comments and summary.
Reserve emergency relief supplies. Before the summer comes, distribute and equip heatstroke prevention and cooling drugs and some first-aid drugs to the site. Do a good job in the prevention of food poisoning, do a good job in fire prevention, explosion prevention, lightning protection, flood control and flood prevention, and make material reserves and emergency plans. At present, Tahe Oilfield has entered the flood control period, and our engineering department has formulated a comprehensive flood control plan and material reserve. In case of danger, our engineering department will rush to the scene as soon as possible to carry out flood control and rescue work.
Conduct a health examination for employees once a year and establish files.
Strictly implement the distribution of personal labor protection articles.
8. Vehicle management: As a pre-drilling construction unit, there are many mechanical equipment and transport vehicles. In order to avoid all kinds of traffic accidents, the engineering department has formulated strict rules and regulations for mechanical operation and vehicle driving. It is stipulated that all vehicles are strictly prohibited from speeding and overloading when driving, and strictly abide by traffic rules to prevent traffic accidents. On-site mechanical operators must obey the command of technical personnel on the construction site, actively and enthusiastically cooperate with the construction, and do not give the equipment to unlicensed personnel for use, so as to achieve civilized construction. If there is any violation, it will be recorded and fined, or returned to the company for handling.
Reason.
9. Construction site management: constantly strengthen the site safety management of the construction site, nip all unsafe hidden dangers in the bud, strictly abide by the various production safety bans of the bureau and the branch, and ensure that no safety and environmental accidents occur. Pay attention to environmental sanitation, do a good job in the safety and environmental protection of the station, strictly borrow soil from the local designated borrow site in advance, do a good job in environmental protection of the borrow site, and conduct process monitoring and self-inspection and acceptance on the construction site.
X. Recent stability work: According to the spirit of the safety work conference of Northwest Oilfield Company on the incident of ………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………… In order to ensure the completion of the goal of maintaining stability and security, the engineering department has formulated the measures for maintaining stability and security during the … incident.
Welcome leaders to criticize and correct the safety and environmental protection work of our engineering department.
…
September 2(nd), 2008
- Previous article:Seventh Grade Geography Teaching Work Plan for the First Semester
- Next article:How many tons of ships can make people feel less bumpy?
- Related articles
- The favorable conditions for developing agriculture in the Yarlung Zangbo River basin, why is it rainy in the Yarlung Zangbo River basin?
The Yarlung Zangbo River basin is 3000-4000 meters above
- Meteorology teacher
- It's cooler to have a low ponytail hairstyle in summer. Is this hairstyle easy to manage?
- Can I feed with Tianqidan?
- What's the weather like in Hukou in May 1 Day? What kind of clothes are appropriate to wear?
- Climate of I Peak in Gashur Bloom.
- Will the subway be flooded when it rains heavily in Beijing
- Do you think the north is better or the south is better?
- What science and technology did Einstein contribute to the Allies in the Red Alert series?
- Hunan Golden Eagle Cartoon Program Table