Traditional Culture Encyclopedia - Weather forecast - Property Snow Removal Safety Emergency Plan
Property Snow Removal Safety Emergency Plan
Sample of Property Snow Removal Safety Emergency Plan
Accidents will inevitably occur in study, work, and life. In order to reduce the consequences of accidents, it may be necessary to prepare an emergency plan in advance. Do you know what kind of emergency plan can actually help us? The following are examples of property snow removal safety emergency plans that I have collected for you. You are welcome to read them. I hope you will like them.
Property Snow Removal Safety Emergency Plan 1
The winter weather is severely cold. In order to ensure the personal safety of teachers and students when traveling and outdoor physical education classes, and to complete the task of snow removal, the following safety plan has been formulated.
1. Raise awareness and strengthen leadership.
Winter snow removal work is a public welfare work and is the responsibility and obligation of all teachers and students in the school. Leaders of each department must attach great importance to this work and actively organize and implement the implementation of snow removal work in their departments.
In order to strengthen the leadership of the social responsibility section and winter snow removal work on campus, the school has established a snow removal work leading group and a snow removal work office.
Leader of the leadership group:
Deputy leader:
Members: and head teachers of each class,
The snow removal office is located in the Political and Education Office Department, Director:.
2. Division of responsibilities and clear responsibilities.
The snow removal work is comprehensively coordinated by the school leadership group, and the snow removal office is specifically responsible for the organization and implementation. The school implements a segmented responsibility system: the entire snow removal area is assigned to three grade departments.
3. Safety precautions for snow removal work
1. Before each snow removal, each class must clearly explain the tasks and put forward safety precautions.
2. Pay attention to the process and method when picking up and placing tools. Each class sends a representative to pick them up, and many people cannot enter at the same time. The tool should be facing down and not towards people.
3. Students are required to pay attention to keeping warm from cold and wear hats and gloves when working.
4. It is strictly forbidden to play in the snow, and two people are not allowed to stand facing each other and use tools.
IV. Specific Requirements
1. Each department must complete the snow removal tasks in a timely and quality manner and meet the relevant requirements and standards for snow removal work in accordance with the snow removal responsibilities and areas under its jurisdiction divided by the school. .
2. Each responsible department must have dedicated personnel responsible for snow removal work. When snow falls, personnel must be promptly organized to complete the snow removal tasks in the responsible section.
3. Snow removal work during holidays and emergencies must also be ensured, communication must be kept open, and the duty system must be adhered to.
4. The school will organize personnel to supervise and inspect the completion of the snow removal responsibility of each department, and report and praise the departments that have done well. Those who do not clear the snow for no reason or do not clear the snow in a timely or thorough manner will Responsible departments should report and criticize.
5. The responsible department responsible for snow removal tasks must take snow as an order. All hard coverings on campus must be free of snow paths, snow strips, and ice packs, and must meet the road surface, road lines, and exposed edges. stone.
6. Snow removal tools are distributed to each class and stored on the first floor of the school library. Property Snow Removal Safety Emergency Plan 2
In order to ensure timely cleaning of winter ice and snow on production areas, office areas, and community roads, to ensure that community roads are smooth and the production site environment is clean, this plan is specially formulated based on the actual production and life conditions of the company and center. We hope that all departments and units of the company, central agencies and units will conscientiously organize and implement the plan.
1. Organizational Leadership
Gong Wuyan, general manager of the property company and director of the base center, is the team leader. Luo Shiqing, deputy manager of the property company, is the on-site command. All departments of the company and central agencies work The snow removal leading group composed of personnel, leaders and departments at the inspection points supervise and guide the snow removal work of the inspection point units. The inspection, collection, summary and reporting of the snow removal work are the responsibility of the production operation department and the customer service center.
2. Job Responsibilities
1. The snow removal leading group is responsible for the leadership, command and coordination of ice and snow clearing work.
2. Each unit establishes a snow-clearing supervision team with the station (team) leader and secretary as the snow-clearing supervision team captains, and the deputy leaders and supervisors as members.
3. The Production Operations Department and the Customer Service Center provide early warning of snow conditions, and coordinate and remind all units to promptly clear ice and snow in production areas and living roads.
4. The rental store shall be organized by the responsible management unit to clear the snow in front of the door. Each unit shall clear the snow and ice in the courtyard and in front of the respective unit and clean it in a timely manner according to standards.
5. Each unit shall promptly inspect and report the status of snow clearing work.
6. The external project management station is responsible for the reserve supply of emergency supplies such as salt, straw bags, and shovels.
7. The Production Operations Department and the company’s customer service center organize and accept the snow clearing work in each unit’s responsible area and report it.
3. Snow conditions standards
Light snow: The depth of snow on the ground is less than 3 cm.
Medium snow: refers to the depth of snow on the ground being 3 to 5 centimeters.
Heavy snow: refers to the depth of snow on the ground being 5 to 9 centimeters.
When the amount of snowfall reaches more than 9 centimeters in 24 hours, it is called a blizzard or a heavy snowstorm.
4. Snow clearing work standards
1. Light snow. If it snows during the day, cleaning will be organized as soon as the snow stops; if it snows at night, cleaning will begin at dawn the next day; after the ice and snow are cleared, the road surface will be clear of loose snow and ice, and the cleaning work will be completed when the traffic is convenient and obstacle-free.
2. Medium snow. If it snows during the day, cleanup will be organized as soon as the snow stops. Or organize cleaning when the snow has not stopped but the thickness exceeds 5cm; if it snows at night, the cleaning will start at dawn the next day, and the snow will be piled up reasonably. If necessary, organize personnel to sprinkle an appropriate amount of salt on the snow on the main roads; there will be no loose snow after the road is cleaned, and no snow will be left. Once the ice is frozen, the cleaning work can be completed with easy access and no obstacles.
3. Heavy snow or icy roads. The company's snow clearing work headquarters issues snow clearing instructions, and when necessary, promptly coordinates mechanical snow pushing equipment; as many personnel as possible from each department are immediately in place to organize voluntary snow clearing and ice shoveling work; each unit must sprinkle appropriate amounts of water on main roads. salt and treat icy roads.
4. The company’s customer service center organizes inspection and acceptance of the snow clearing work in each responsible area, and ends the cleaning work after confirming that it is qualified.
5. Work requirements
1. Snow clearing should be completed within 12 hours of light snow, 24 hours of moderate snow, and 48 hours of heavy snow. Severe snow conditions should not exceed 60 hours. In the event of snowfall on Saturdays, Sundays and holidays, this plan will still be implemented.
2. The scope of cleaning includes densely populated areas such as production areas, office areas, and residential roads. The clearing and stacking of ice and snow must not affect production, daily life and travel. It is not allowed to pile snow around fruit bins or garbage cans, or to transport salty snow to designated locations. It is prohibited to pour contaminated snow (snow with salt sprinkled on it) into tree holes and green spaces.
3. The external project management station material supply station has prepared reserves of emergency supplies in advance.
4. During the snowfall and snow removal period, the supervision team must insist on uninterrupted inspections every day, check the presence of personnel, and report the snow removal situation in a timely manner. The company's customer service center organizes acceptance and notification of snow clearing work in each responsible area.
5. Give notifications, criticisms and penalties to units that do not perform the task of clearing snow and ice and do not complete the task well. Property Snow Removal Safety Emergency Plan 3
In order to do a good job in the transportation bureau’s emergency support of snow removal on roads under severe winter weather conditions, effectively enhance the emergency response capabilities to severe winter weather emergencies, ensure smooth roads, and provide This plan is specially formulated to provide smooth transportation services in the jurisdiction area.
1. Guiding ideology
In order to minimize the damage caused by severe ice and snow weather emergencies to airport emergency support roads, combined with the spirit of relevant documents issued by the Transportation Bureau, in accordance with the "recognition in place, "Effective measures, clear responsibilities, and implementation of tasks" are required to be carefully organized, actively operated, carefully deployed, and reasonably dispatched to ensure smooth roads under harsh winter weather conditions.
2. Organizational Structure
(1) Establishment of Qingdao Haida Property Management Co., Ltd.’s “Winter Snow Removal Work” Emergency Leadership Group
Team Leader: Deputy Team Leader : Members:
(2) The leading group has an office, which is located in the Environmental Sanitation Department and is specifically responsible for the distribution, scheduling and inspection of snow clearing emergency rescue tasks, and conveys snow prevention information during snow prevention and snow clearing work. , coordinate various teams to effectively carry out snow prevention and snow clearing work.
1. The first commando team (18 people):
2. 2. The second commando team (4 people):
3. The third commando team Team (4 people):
3. Machinery and material reserves
(1) Vehicles and equipment:
Existing 1 pickup truck and snow removal shovel 3 sets, 1 snow removal roller, 1 spreader, 4 anti-skid chains.
(2) Standing supplies
We have reserved 20 tons of snow melting agent, 200 cubic meters of anti-slip sand, 21 snow shovels, 30 brooms, 40 pairs of gloves, and 10 sets of signs. 100 cones and 5 walkie-talkies are prepared for use.
4. Information early warning mechanism
(1) Establish a 24-hour snow warning reporting system and a winter snow removal duty system. When personnel on duty receive reports of snow conditions or icy roads that affect traffic safety, they should report the situation to the emergency leading group office in a timely manner so as to grasp the disaster situation in a timely manner and implement emergency response measures.
(2) Obtain accurate and reliable weather information every day through news media, the Internet, weather forecast and other channels, and timely predict and analyze possible disasters and their degree of harm.
(3) Especially in rainy and snowy weather, increase the intensity of inspections on key road sections such as the bridge under Zhanqian Avenue, the East Outer Ring Bridge, and Jiaozhou North Station, and pay close attention to the impact of rain and snow on road surfaces and traffic. , immediately report any abnormal situation to the emergency leading group, and the leader of the emergency leading group will initiate an emergency plan according to the situation. When the emergency plan is activated, the team leader must report the information related to snow removal and anti-skid to the leadership group as soon as possible so that the leadership group can truly and comprehensively understand the current situation and make scientific and comprehensive overall arrangements to ensure appropriate measures and better implementation of the plan. . The emergency leading group should promptly report the rain and snow disaster situation and handling situation on this section to the Maintenance Department of the Transportation Bureau.
5. Starting conditions
The winter snow removal emergency plan shall be started or terminated by the leading group. After the snow removal emergency plan is launched, relevant responsible personnel should effectively strengthen publicity and coordination work to ensure that the social and environmental conditions for the implementation of the plan meet the requirements.
The emergency leading group can timely understand road conditions through a fast and reliable information early warning mechanism, and make timely decisions on the activation or cancellation of plans based on rain and snow disaster conditions.
6. Measures to ensure smooth flow
(1) Reserve and place anti-skid sand or snow melting agent on the roadside in special sections such as the bridge under the Zhanqian Avenue and the East Outer Ring Bridge, and bridges Winter safe driving signs are set up at the entrance and uphill to remind passing vehicles to pay attention to safety and make preliminary preventive preparations.
(2) After the emergency plan is activated, all personnel will implement a 24-hour duty system. Personnel, vehicles, snow removal tools, communication equipment, traffic safety signs, etc. will be ready and on standby at any time, and will uniformly follow the arrangements of the leadership group.
7. Working Principles
(1) Level 5 plans can be activated based on snowfall and road conditions: Level I plan: half-width traffic (including double-lane half-width traffic). Level II plan: the upper or lower line is closed in the short term. Level III plan: Single line up and down two-way traffic (the up or down line will be closed for a long time). Level IV plan: The upper and lower lines will be closed simultaneously in the short term. Level V plan: Vehicle diversion (upstream and downstream lines are closed simultaneously in the long term and short term). The maintenance team was quickly notified to spread salt on the road, spray snow melting agent, and dispatch snow removal trucks.
(2) Follow the principle of "priority to bridges and ramps". Bridges are different from ordinary roads. The surface temperature is lower, the snow is difficult to melt, and it is easy to freeze. Once it is not cleared in time, it will be cleaned later. It is extremely difficult. On ramps, curves and sections with large vertical slopes, vehicles travel at slow speeds and are prone to tire slippage. Generally, traffic accidents often occur on these sections. Therefore, priority should be given to removing ice and snow from the bridge under Zhanqian Avenue and the East Outer Ring Bridge, and then extended to the main line. The cleared ice and snow must not be piled in the central separation zone, and should be transported away from the main line as much as possible and then stacked in a centralized manner.
(4) Snow removal adheres to the working principle of “clearing from the inside to the outside, from high to low, and leaving no future troubles” to ensure that all the main lines and ramps of the highways under our jurisdiction are covered with snow within 24 hours after the snow stops. Clear it clean.
(5) According to the thickness of snowfall, it can be divided into light snow (snow thickness ≤ 10 mm), light snow (snow thickness > 10 mm, ≤ 50 mm), medium snow (snow thickness > 50 mm) , ≤150 mm) and heavy snow (snow thickness >150 mm). The snow removal leading group will arrange snow removal machinery, personnel and snow melting materials accordingly based on the amount and duration of snowfall, etc., to reduce unnecessary waste of resources. Snow removal operations can be arranged according to the following principles:
1. Blue warning information, the snowfall thickness will reach more than 1 cm and less than 5 cm within 24 hours, and the snowfall continues, which may have an impact on traffic. It has little impact on driving. When the average temperature is above -5°C, the snow on the surface will naturally disappear due to vehicle driving or changes in temperature, so no special treatment is required. When the temperature is below -5℃, depending on the situation, if necessary, sprinkle a small amount of snow melting agent. Spreading trucks can be arranged to carry out a large-scale, small-dose spreading work across the entire line. The dose of snow melting agent can be controlled at 20 grams/square meter.
2. Yellow warning information, the snowfall thickness will reach more than 5 cm and less than 10 cm within 24 hours, and the snowfall continues, which may have an impact on traffic. When the temperature is between 0 and -20°C, mechanical snow removal is the main method. When the snowfall thickness reaches 1cm, snow melting agent should be spread. It is advisable to control it below 20 grams per square meter. After the snowfall is over, snow plows will be dispatched to cooperate with the spreading of snow melting agent (20g). /㎡), the total amount of snow melting agent spread should be controlled at 40 grams per square meter to clear snow on the road.
3. Orange warning information, the snowfall thickness will reach more than 10 cm within 24 hours, less than 20 cm and the snowfall continues, which may or has already had a greater impact on traffic. The speed of snowfall is faster, the lower the temperature, the greater the density of snowfall, and it is easier to compact. When the snowfall thickness reaches 1cm, start spreading snow melting agent (20g/㎡). When the snowfall ends or the snowfall thickness reaches 5cm, snow plows and manual workers will cooperate. To clear snow on the road, first clear one lane and then the remaining lanes. After the mechanical snow clearing is completed, spread snow melting agent (40g/㎡). The total amount of snow melting agent should be controlled at 60 grams per square meter. Some road sections are not completely cleaned. Special mechanical processing is used.
4. Red warning information, the snowfall thickness will reach more than 20 cm within 24 hours, and the snowfall continues, which may or has already had a greater impact on traffic. The snowfall speed is fast, lasts for a long time, and the snow layer is thick. When the snow thickness reaches 1 cm, start spreading snow melting agent (20g/㎡). When the snowfall ends or the snowfall thickness reaches 5 cm, snow plows, loaders and manual cooperation will be dispatched. Clear snow from roads. After the mechanical snow removal work is completed, spread the snow melting agent (40g/㎡). The total amount of snow melting agent spread should be controlled at 60 grams per square meter. Snow removal work can use multiple mechanical flow operations. Emergency parking areas use snow throwers, etc. Thrown off the road.
8. Operation Procedures
(1) When the road is not closed in snowy weather, team members will work on key high-risk road sections (crossing the bridge under Zhanqian Avenue and the East Outer Ring Bridge) Set up warning signs to remind drivers and passengers to pay attention to safety.
(2) When snow removal work requires closed operations, eye-catching and complete signs must be placed in a standardized manner, warning lines must be drawn up, and workers must not go out of bounds to prevent unsafe accidents.
(3) In snowy weather, the speed of pickup trucks must not exceed 30 km/h; when the thickness of ice and snow on the road (compacted thickness) exceeds 3 cm, the vehicle must be equipped with anti-skid chains.
(4) During the inspection process, the vehicle should be driven in the driving lane. The driver must always pay attention to the driving status of the vehicle, concentrate, and no other actions unrelated to driving are allowed. The co-pilot should focus on observing the front. The degree of snow on the road and assisting drivers to complete other actions; all personnel must be responsible and observe carefully to ensure that snow removal work is safe and in place.
(5) Vehicles operating in snowy weather are strictly prohibited from parking on high slopes, bridges and culverts.
(6) After each anti-skid treatment, an inventory of anti-skid materials must be carried out, and anti-skid materials on ramps, bridge decks and other road sections must be replenished in a timely manner to ensure the supply of anti-skid materials.
(7) All construction sections must have construction signs and safety signs set up in accordance with regulations, and assign dedicated personnel to be responsible for traffic diversion in this section.
(8) Snow removal personnel on the road must wear reflective vests when operating to ensure the safety of snow removal personnel.
(9) Vehicle congestion should be avoided as much as possible during snow removal and anti-skid operations. If vehicle congestion occurs, the staff will promptly report the road conditions and snow removal progress to the blocked drivers and passengers and patiently explain and comfort them to avoid The emergence of unstable situations.
(10) If there is light snow, the sweeper truck will quickly open the road and manual cooperation will be completed to complete the cleaning. The emergency team ensures snow clearing tasks such as intersections and emergency parking lanes. If there is moderate to heavy snow and the snow on the road is thick, you should first use a snow shovel or snow plow (modified snow board) to push the snow from the passing lane to the off-road lane, and then the snow plow will cooperate with the operation.
9. Strict supervision and assessment
Snow clearing work is related to the normal operation of roads and the vital interests of the people. Each group must attach great importance to it, strengthen coordination, and organize tightly. In order to ensure the effect of snow clearing, Haida Property will organize personnel to supervise and inspect the implementation of snow clearing by each group, and commend advanced individuals who have outstanding snow clearing work; those who fail to clear the snow in the responsible area as required will be punished Punish accordingly.
;
- Related articles
- Can peanuts from Qidong, Jiangsu be planted in Rushan, Weihai?
- On the Modal Phrases of Walking in Autumn Night
- Ankang's folk composition
- Is it a word to describe the weather?
- What is the process in Battle of Red Cliffs?
- An earthquake of magnitude 6.8 occurred in Luding, Sichuan. Is hot and dry weather a precursor to an earthquake?
- Happy copy of rain at last (52 sentences)
- Safety comes first in warm winter —— What are the safety instructions for winter students in Dongfeng Road Primary School in Zhuolu County?
- Company thank-you letter
- How ripe is the wheat in Hengshui?